404
|
Thursday, September 25, 2014, 15:44 |
Anders Mjos | ThO#1 | | ITW | TM1 | 40282-5 | | Done | ThO#1 Heat Shield Conditioning | Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06: Starting turbos
Thursday, September 25, 2014, 16:14: Turbos at speed.
Thursday, September 25, 2014, 16:28: Vacuum at 1.9E-5 T
Vacuum was coming down slowly yesterday. Vented this morning to clean o-ring on door.
Friday, September 26, 2014, 08:40: Roughing
Friday, September 26, 2014, 09:02: Starting turbos
Friday, September 26, 2014, 09:10: Turbos at speed
Friday, September 26, 2014, 09:12: Vacuum at 9.7E-6 T
Monday, September 29, 2014, 08:40: Water opened for HS circuit. Vacuum stable at 1.8E-7 T
Monday, September 29, 2014, 13:51: Opened and closed IV4
Wednesday, October 01, 2014, 13:13 : Target cooled down.
Monday, October 06, 2014, 09:10: Turbos stopped. Vacuum at 1.3E-7 T
Monday, October 06, 2014, 10:49: Venting
Tuesday, October 07, 2014, 09:31: Heat Shield removed |
403
|
Monday, September 08, 2014, 16:23 |
Anders Mjos | UC#11 | | | TM4 | 40282-5 | | Done | UC#11 Heat Shield Conditioning | T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
CH 3: Through HS inside TGHT right
CH 4: Attached to HS on left gripper. Does not read temp
Monday, September 08, 2014, 16:22: Roughing
Monday, September 08, 2014, 16:43: Started turbos
Monday, September 08, 2014, 16:51: Turbos at speed
Monday, September 08, 2014, 16:53: Vacuum at 2.7E-5 T
Tuesday, September 09, 2014, 08:20 : Opened HS water supply. Vacuum stable at 3.7E-7 T
Tuesday, September 09, 2014, 08:21: Starting auto ramping. TGHT to 580 A at 2A/min
Tuesday, September 09, 2014, 08:50 :
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.8 |
26.7 |
TBHT |
6.5 |
26.2 |
COIL + EE |
5.3 |
26.9 |
TGHT |
5.8 |
26.3 |
SUPPLY |
|
27.0 |
Wednesday, September 24, 2014, 11:30: T/C attached to tube does no longer read a correct temperature. Cooling down.
Thursday, September 25, 2014, 08:50: Turbos stopped.
Thursday, September 25, 2014, 11:07: Venting
Thursday, September 25, 2014, 14:00: Heat shield removed |
Attachment 1: Thermocouples.xlsx
|
402
|
Friday, August 29, 2014, 14:52 |
Anders Mjos | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Done | Conditioning Ta#44 | Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting turbos.
Friday, August 29, 2014, 15:19: Turbos at speed
Friday, August 29, 2014, 15:21: Vacuum at 1.6E-5 T
Tuesday, September 02, 2014, 08:36: HS cooling water supply opened. Vacuum stable at 1.4E-7 T
Tuesday, September 02, 2014, 08:50 : BIAS/ EZL / EE to 30 / 14 / -1.5 kV. Started auto ramping to 500 / 150 (180) A
Tuesday, September 02, 2014, 09:23
Supply ~97psi, Return ~7psi
Device
|
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.9 |
28.0 |
TBHT |
6.5 |
27.6 |
COIL + EE |
5.4 |
28.6 |
TGHT |
5.8 |
27.8 |
SUPPLY |
|
28.2 |
Thursday, September 04, 2014, 12:38 : Starting cool-down
Thursday, September 04, 2014, 15:20: Closed IV4
Thursday, September 04, 2014, 15:37 : BIAS / EZL / EE to 0
Friday, September 05, 2014
Target cooled down. Power supplies switched off.
Monday, September 08, 2014, 14:07: Turbos stopped.
Monday, September 08, 2014, 15:15: Venting. HS cooling water lines purged.
Monday, September 08, 2014, 16:00: Target removed. |
401
|
Wednesday, August 27, 2014, 12:55 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak on MB1 | e-faulted by operations Aug 26th |
400
|
Wednesday, August 20, 2014, 16:25 |
Anders Mjos | | | | | | | Problems/Solutions | Lost power on TGHT, TBHT and EE simultaniously | Possible controls problem. Breaker 18 found latched. Can not be re-energized. Burnt smell in PLC / HV area. e-faut 7561
Thursday, August 21, 2014: Dave Morris had a look and was able to isolate the problem to be with one of the low voltage power supplies in the PLC panel.
Friday, August 22, 2014: New 12V and 24V power supplies installed. PLC cabinet vacuumed. A new 24V fan with filter will also be installed.
Tuesday, August 26, 2014: Power restored to PLC cabinet. System is operational again. |
399
|
Thursday, August 14, 2014, 08:45 |
Anders Mjos | | | | | | | Problems/Solutions | FC0 reading full current | since yesterday around 19h. See attached screen shot of archived data
Thursday, August 14, 2014, 08:40: Rebooted IOC. Still reading full scale only. FC0 reads full scale with signal cable removed.
e-fault 7545
Thursday, August 14, 2014, 11:28: Graham called to inform me that all of the 8 channels on the module was reading high. TRIUMF does not have a spare. He will arrange to have the module repaired.
Tuesday, August 19, 2014, 16:27: Graham has brought the system back into operation with a new vqsx module from the ICB stand. |
Attachment 1: FC0FullScaleReading_2014-08-14.png
|
|
Attachment 2: FC0FullScaleReading_EPICS_2014-08-14.png
|
|
398
|
Tuesday, August 12, 2014, 09:52 |
Anders Mjos | | | | | | | Problems/Solutions | RTD installed on Supply water | Travis assisted in installing a temperature reading RTD from Omega (SA1-RTD-MTP) on the water supply. The RTD has been installed with a 503 Ohm resistor => 0V = -175.75 C, 10V = 205.71 C. The RTD has been connected to Ch 9 on the data logger.
Offset calibration data towards the SUPPLY temperature reading is attached. |
Attachment 1: 2014-08-12_Dataq_Screen_Shot.png
|
|
Attachment 2: Dataq_Supply_Temperature_calibration_2014-08-20.docx
|
397
|
Friday, August 08, 2014, 12:45 |
Anders Mjos | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | 39230-5 | Done | Condictioning ZrC#6 | Friday, August 08, 2014, 12:44: Stopped turbos
Friday, August 08, 2014, 14:42: Venting
Target assembly inserted
Friday, August 08, 2014, 15:08: Roughing
Friday, August 08, 2014, 15:29: Turbos started
Friday, August 08, 2014, 15:37: Turbos at speed
Friday, August 08, 2014, 15:39: Vacuum at 1.4E-5 T
Monday, August 11, 2014, 08:58: Opened HS cooling water. Vacuum stable at 1.6E-7 T
Tuesday, August 12, 2014, 10:31: IV4 Opened
Tuesday, August 12, 2014, 10:35: EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 12, 2014, 10:39: Starting target heat to 300 A / 96 (115) A
Wednesday, August 13, 2014, 08:03 : Continue heating to 580 A / 190 (228) A
Wednesday, August 13, 2014, 08:24: Aborting target heating. Cu-LCW pressure and flow is reduced due to a problem with a pump.
Device |
Flow
[lpm] |
Temp
[C]
|
HS + MSP |
1.9 |
27.7 |
TBHT |
4.1 |
23.9 |
COIL + EE |
3.5 |
25.1 |
TGHT |
3.7 |
25.6 |
SUPPLY |
|
24.4 |
Supply pressure ~ 52 psi
Return pressure ~ 11 psi
Wednesday, August 13, 2014, 08:31: Starting cool down as flow rate on HS + MSP is low. A low flow trip of the TGHT should be avoided.
Wednesday, August 13, 2014, 11:54 : Curtis Ballard contacted me and asked if they could valve off the Cu-LCW circuit to the Test Stand. Heaters had been previously brought down. Bias off and power supplies are switched off. IV4 closed.
Wednesday, August 13, 2014, 12:00: Cooling water syupply valved off to Test Stand.
Flow rates are back to normal since yesterday evening
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.1 |
27.8 |
TBHT |
5.9 |
27.4 |
COIL + EE |
5.0 |
28.3 |
TGHT |
5.4 |
27.6 |
SUPPLY |
|
28.1 |
Thursday, August 14, 2014, 08:00: Conditioning on hold due to FC0 problem
Wednesday, August 20, 2014, 07:50: Conditioning continues. Auto-ramping to 400 / 150 ( 180) A @ 4/2 A/min
Wednesday, August 20, 2014, 09:35 : Continue heating to 580 / 165 (200) A @ 2/1 A/min
Wednesday, August 20, 2014, 09:50
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.6 |
32.9 |
TBHT |
6.5 |
28.5 |
COIL + EE |
5.4 |
29.2 |
TGHT |
5.8 |
29.7 |
SUPPLY |
|
28.8 |
Wednesday, August 20, 2014, 15:15: Power lost to TBHT, TGHT and EE during nominal operation (580/ 183 (220) A). Fault report submitted.
PLC cabinet work finished. Resuming conditioning.
Tuesday, August 26, 2014, 16:35:EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 26, 2014, 16:35: Starting target heat to 50 A / 25 A
Wednesday, August 27, 2014:
Continued conditioning. Heating to 580 /190 (228) A
Thursday, August 28, 2014, 08:34
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.5 |
38.0 |
TBHT |
6.4 |
28.0 |
COIL + EE |
5.5 |
29.8 |
TGHT |
5.8 |
30.3 |
SUPPLY |
|
28.2 |
Friday, August 29, 2014, 10:30: EE conditioned for ~20 min @ 2kV.
Friday, August 29, 2014, 10:32 : Starting cool down at 4/2 A/min
Friday, August 29, 2014, 11:55: Closed IV4
Friday, August 29, 2014, 11:56: BIAS, EE and EZL to 0
Friday, August 29, 2014, 13:10: Stopped turbos.
Friday, August 29, 2014, 14:06: Venting
Friday, August 29, 2014, 14:51: Target removed |
396
|
Friday, August 01, 2014, 08:39 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:RP2 noisy | Friday, August 01, 2014, 08:39: Backing pressure 0 / 11 mT |
395
|
Wednesday, July 23, 2014, 14:34 |
Anders Mjos | | | | | | | In progress | Empty chamber | Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting turbos.
Wednesday, July 23, 2014, 15:11: Turbos at speed
Wednesday, July 23, 2014, 15:13: Vacuum at 7.4E-6 T |
394
|
Friday, July 18, 2014, 11:30 |
Anders Mjos | UC#10 | LP-SIS | ITE | TM4 | 40282-5 | 40316-1 | Done | UC#10 Heat Shield Conditioning | Friday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting turbos
Friday, July 18, 2014, 11:59: Turbos at speed.
Friday, July 18, 2014, 12:01: Vacuum at 1.4E-5 T
Monday, July 21, 2014, 08:51: Opened water for HS circuit. Small vacuum "bump" recovered to 1.5E-7 T
Monday, July 21, 2014, 09:17: Starget TGHT autoramping to 580A @ 2 A/min
Monday, July 21, 2014, 14:05: TGHT @ 580A 7.47V.
Tuesday, July 22, 2014, 10:41: Data logger installed
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
37.6 |
3.7 |
TBHT |
28.5 |
6.1 |
COIL + EE |
28.7 |
4.8 |
TGHT |
31.0 |
5.4 |
Tuesday, July 22, 2014, 13:41: BIAS / EZL / EE to 30 / 14 /2 kV. EE:RDCUR 695 uA
Tuesday, July 22, 2014, 14:23: Starting cool down of TGHT 2A/min. Vacuum at 2.7E-7 T
Wednesday, July 23, 2014, 09:05: BIAS / EZL / EE off. Turbos off. Vacuum at 1.3E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.5 |
3.7 |
TBHT |
28.3 |
6.1 |
COIL + EE |
29.2 |
5.2 |
TGHT |
28.4 |
5.7 |
Wednesday, July 23, 2014, 14:05: Purged HS water line.
Wednesday, July 23, 2014, 14:07 : Venting
Wednesday, July 23, 2014, 14:33: Heat Shield removed |
393
|
Friday, July 18, 2014, 08:19 |
Anders Mjos | | | | | | | | Venting | Friday, July 18, 2014, 08:19: Stopped turbos
Friday, July 18, 2014, 10:58: Venting |
392
|
Wednesday, July 09, 2014, 14:08 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD ANODE current readback | The read back of the ANODE current was confirmed to be working today with help of Ray D. using a 1kOhm resistor. There is an offset in the read back which can explain why no current was seen on SiC#30. The resistor between CATHODE and GND was changed from 100 kOhm to 50kOhm. |
391
|
Tuesday, July 08, 2014, 09:05 |
Anders Mjos | | | | | | | In progress | Empty chamber | Tuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting turbos
Tuesday, July 08, 2014, 13:30 : Turbos at speed
Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T |
390
|
Thursday, June 26, 2014, 16:32 |
Anders Mjos | Ta#43 | LP-SIS | ITW | TM1 | 40282-2 | 39230-6 | In progress | Conditioning Ta#43 | Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting turbos.
Thursday, June 26, 2014, 16:59: Turbos at speed.
Thursday, June 26, 2014, 17:01: Vacuum at 1.2E-5 T
Friday, June 27, 2014, 08:39: Opened HS cooling line. Vacuum stable at 1.9E-7 T
Wednesday, July 02, 2014, 10:24: Vacuum at 1.3E-7 T
Wednesday, July 02, 2014, 10:31: BIAS / EE / EZL to 30 / 1.5 / 14 kV
Wednesday, July 02, 2014, 10:32: Opened TPS:IV4
Wednesday, July 02, 2014, 10:36: Started heating TGHT / TBHT to 400 A / 155 A
Wednesday, July 02, 2014, 14:00: Heating finished for today.
Thursday, July 03, 2014, 08:09 : Resuming heating TGHT / TBHT to 580 A / 200 A. Vacuum at 2.1E-7 T
Thursday, July 03, 2014, 09:17: TGHT voltage limiting. Stopped and restarted heating.
Thursday, July 03, 2014, 12:51 : Heating TBHT to 230 A
Thursday, July 03, 2014, 13:18: TBHT at 227 A (local readback). Started mass scan.
Thursday, July 03, 2014, 15:39: Lowering TBHT to 218 A (local).
Friday, July 04, 2014, 11:00: Heated to 230 A.
Friday, July 04, 2014, 15:40: Q1/Q6 found off.
Friday, July 04, 2014, 15:42 : Starting cool down.
Monday, July 07, 2014, 09:24 : Closed TPS:IV4
Monday, July 07, 2014, 09:24: EE conditioning to -2kV
Monday, July 07, 2014, 10:02: BIAS off. Turbos off.
Tuesday, July 08, 2014, 08:13: Venting |
Attachment 1: Ta#43_Conditioning.docx
|
389
|
Friday, June 20, 2014, 11:44 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Friday, June 20, 2014, 11:44: Roughing
Friday, June 20, 2014, 13:00: Strarting turbos
Friday, June 20, 2014, 13:09: Turbos at speed.
Friday, June 20, 2014, 13:10 : Vacuum at 1.3E-5
Thursday, June 26, 2014, 08:52 : Turbos stopped. Vacuum at 1.3E-7 T
Thursday, June 26, 2014, 15:34: Venting |
388
|
Thursday, June 19, 2014, 10:48 |
Anders Mjos | | | | | | | Problems/Solutions | FC0 did not retract from beam line | Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again. |
387
|
Wednesday, June 18, 2014, 09:23 |
Anders Mjos | | | | | | | Problems/Solutions | TSH:MB1 Trip & MB1 June 10th water leak | A water leak on MB1 was found and reported by operations on June 10th e fault 7429
MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.
Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered. |
386
|
Tuesday, June 17, 2014, 15:22 |
Anders Mjos | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | 39956-5 | In progress | SiC#30 HV and Heaters Conditioning |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed
|
The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.
Tuesday, June 17, 2014, 15:22: Roughing
By R.M.
Tuesday, June 17, 2014, 15:52: Turbos Started
Tuesday, June 17, 2014, 15:54: TP1B at speed
Tuesday, June 17, 2014, 15:57: IG1 Turned on 1.92e-05T
Tuesday, June 17, 2014, 15:59: TP1A at speed
Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T
By AM
Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.
Wednesday, June 18, 2014, 08:40: Pumping on gas lines.
Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.
Wednesday, June 18, 2014, 08:51: Opening TSH:SV5
Wednesday, June 18, 2014, 08:53: Opening TSH:SV2
Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV
Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A
Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V
Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4
Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)
Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V
Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A
Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A
Thursday, June 19, 2014, 09:44: 8E-8 A on FC0
Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.
Thursday, June 19, 2014, 11:36: Opening for He.
Thursday, June 19, 2014, 11:46: Opening for Ne.
Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A
Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.
Thursday, June 19, 2014, 15:06: Mass scan up.
Thursday, June 19, 2014, 16:00: Mass scan down.
Thursday, June 19, 2014, 16:49: Started cooling down target.
Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.
Friday, June 20, 2014, 10:23: Venting. Purging water from HS circuit. |
Attachment 1: SiC#30_Conditioning_3rd_time.docx
|
385
|
Monday, June 16, 2014, 09:12 |
Anders Mjos | | | | | | | In progress | Empty chamber | Monday, June 16, 2014, 09:12: Roughing
Tuesday, June 17, 2014, 14:38: Venting |
|