Friday, April 04, 2014, 08:24, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Venting
|
Aurelia Laxdal wrote: |
HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.
|
Friday, April 04, 2014, 08:23: Target bias, EE and EZL to zero. Turbos off.
Friday, April 04, 2014, 10:14: Venting
Friday, April 04, 2014, 10:48: Target removed - By R.M. |
Wednesday, April 23, 2014, 09:37, Anders Mjos, , , , , , , Problems/Solutions, Started Sources archiver
|
The archiver was not running |
Wednesday, April 23, 2014, 14:16, Anders Mjos, , , , , , , Done, Cu-strip cleaning test - sample #1, not cleaned
|
Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34 : Starting turbos
Wednesday, April 23, 2014, 14:42 : Turbos at speed
Wednesday, April 23, 2014, 14:44 : Vacuum at 8.3E-6 T
Thursday, April 24, 2014, 09:12: Opened water for HS loop. Vacuum stable at1.6E-7 T
Thursday, April 24, 2014, 09:25: Started heating TGHT to 580A at 2A/min
Thursday, April 24, 2014, 14:07: Aborted autoramping. Cu-strip glowing. Started Target Cooldown.
Monday, April 28, 2014, 08:36: Stopped turobs. Vacuum at 1.2E-7 T |
Monday, April 28, 2014, 10:23, Anders Mjos, , , , , , , In progress, Cu-strip cleaning test - sample #2, cleaned
|
Monday, April 28, 2014, 10:23: Started roughing
Monday, April 28, 2014, 10:48: Started turbos. CG1 at ~0.3 T
Monday, April 28, 2014, 10:56 : Turbos at speed
Monday, April 28, 2014, 10:58 : Vacuum at 7.2E-6 T
Tuesday, April 29, 2014, 09:15: Vacuum over night was somewhat erratic with a couple of excursions. Venting to redo door seal and inspect chamber.
Tuesday, April 29, 2014, 13:18: Venting
Aborted venting.
Wednesday, April 30, 2014, 10:15: Vented. Cleaned front door o-ring and groove. Inspected VCR joint on HS water loop. No visible issues.
Wednesday, April 30, 2014, 10:15: Roughing
Wednesday, April 30, 2014, 10:35 : Starting turbos
Wednesday, April 30, 2014, 10:44 : Turbos at speed
Wednesday, April 30, 2014, 10:45 : Vacuum at 6.5E-6 T
Thursday, May 01, 2014, 08:44: Vacuum erratic over night. Small burst of pressure increase in vacuum with ~2 hours intervals. Leak found on HS cooling circuit by purging the water line.
Thursday, May 01, 2014, 08:46: Stopping turbos. Vacuum at 2.7E-7 T
HS water line should be purged again before breaking VCR seal.
Thursday, May 01, 2014, 09:59: Venting
Thursday, May 01, 2014, 10:45: Removed HS loop.
Thursday, May 01, 2014, 10:45: Roughing
Thursday, May 01, 2014, 11:11: Starting turbos. CG1 ~ 0.1 T
Thursday, May 01, 2014, 11:19: Turbos at speed
Thursday, May 01, 2014, 11:21 : Vacuum at 5.2E-6 T
Monday, May 12, 2014, 10:03 : Turbos stopped. Vacuum at 1.22 E-7 T
Monday, May 12, 2014, 13:34: Venting
|
Thursday, May 08, 2014, 15:09, Anders Mjos, , , , , , , Problems/Solutions, SOURCES archiver reported stopped
|
Archiver restarted. |
Friday, May 09, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, EPICS white-out e-fault 7380
|
Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart. |
Thursday, May 15, 2014, 14:58, Anders Mjos, , , , , , , Problems/Solutions, IOC rebooted to recover from white-out.
|
Restarted archivers. |
Tuesday, May 20, 2014, 11:17, Anders Mjos, , , , , , , Problems/Solutions, Burnt off GND connection on Service Cap
|
The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3) by Ray D. |
Tuesday, May 20, 2014, 12:39, Anders Mjos, , , , , , , Done, FEBIAD Cathode Negative BIAS configuration
|
As per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co. |
Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong
|
As per Friedhelm the conditioning settings are:
TGHT 580A
TBHT 290A
COIL 80A
ANODE 200V
Ramped up completed:
TGHT 580A/5.683V
TBHT 242A/2.295V (EPICS settings) and 289A/2.29V at the PS
COIL 80A
Current on the Anode = 13.431mA
|
Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning
|
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation. |
Thursday, June 12, 2014, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2
|
Anders Mjos wrote: |
The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.
E-fault 7258.
|
Edi replaced the backing pump on June 5th. |
Monday, June 16, 2014, 09:12, Anders Mjos, , , , , , , In progress, Empty chamber
|
Monday, June 16, 2014, 09:12: Roughing
Tuesday, June 17, 2014, 14:38: Venting |
Wednesday, June 18, 2014, 09:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:MB1 Trip & MB1 June 10th water leak
|
A water leak on MB1 was found and reported by operations on June 10th e fault 7429
MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.
Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered. |
Thursday, June 19, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, FC0 did not retract from beam line
|
Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again. |
Friday, June 20, 2014, 11:44, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Friday, June 20, 2014, 11:44: Roughing
Friday, June 20, 2014, 13:00: Strarting turbos
Friday, June 20, 2014, 13:09: Turbos at speed.
Friday, June 20, 2014, 13:10 : Vacuum at 1.3E-5
Thursday, June 26, 2014, 08:52 : Turbos stopped. Vacuum at 1.3E-7 T
Thursday, June 26, 2014, 15:34: Venting |
Tuesday, July 08, 2014, 09:05, Anders Mjos, , , , , , , In progress, Empty chamber
|
Tuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting turbos
Tuesday, July 08, 2014, 13:30 : Turbos at speed
Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T |
Wednesday, July 09, 2014, 14:08, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD ANODE current readback
|
The read back of the ANODE current was confirmed to be working today with help of Ray D. using a 1kOhm resistor. There is an offset in the read back which can explain why no current was seen on SiC#30. The resistor between CATHODE and GND was changed from 100 kOhm to 50kOhm. |
Friday, July 18, 2014, 08:19, Anders Mjos, , , , , , , , Venting
|
Friday, July 18, 2014, 08:19: Stopped turbos
Friday, July 18, 2014, 10:58: Venting |
Wednesday, July 23, 2014, 14:34, Anders Mjos, , , , , , , In progress, Empty chamber
|
Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting turbos.
Wednesday, July 23, 2014, 15:11: Turbos at speed
Wednesday, July 23, 2014, 15:13: Vacuum at 7.4E-6 T |
|