  Test-Stand, Page 31 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Moduledown Target Oven W.O# Heat Shield W.O# Status Subject
  509   Thursday, May 12, 2016, 13:32 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test, No PE , Dirty EE.

Thursday, May 12, 2016, 13:00: Begin Roughing.

Thursday, May 12, 2016, 13:40: Turbo Pumps started

Thursday, May 12, 2016, 13:46: Ion gauge switched on.


Friday, May 13, 2016, 08:33: Opened water  supply for heat shield. Vacuum stable at 3.70E-7 T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 29.0 3.20
 COIL + EE  28.5 5.24
 TGHT  28.5 5.72

Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Friday, May 13, 2016, 13:55

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 3.95
 TBHT 29.8 3.16
 COIL + EE  29.0 5.17
 TGHT  30.0 5.72

 


Monday, May 16, 2016, 11:29:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.7 4.06
 TBHT 29.4 3.18
 COIL + EE  28.7 5.18
 TGHT  29.8 5.77

Monday, May 16, 2016, 15:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.20
 COIL + EE  29.1 5.21
 TGHT  30.1 5.77

Note: RGA misread.


Tuesday, May 17, 2016, 15:15:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 30.6 3.29
 COIL + EE  29.0 5.16
 TGHT  30.1 5.74

Note: RGA Misread.


Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open

Wednesday, May 18, 2016, 14:58: FC0 closed.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.3 3.15
 COIL + EE  29.0 5.14
 TGHT  30.0 5.72

 


Thursday, May 19, 2016, 16:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.06
 TBHT 29.3 3.15
 COIL + EE  28.8 5.17
 TGHT  30.0 5.77

 


Friday, May 20, 2016, 14:59:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.6 3.20
 COIL + EE  28.8 5.14
 TGHT  30.0 5.79

 


Tuesday, May 24, 2016, 15:31:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 29.9 3.18
 COIL + EE  29.0 5.15
 TGHT  30.1 5.72

 


Thursday, May 26, 2016, 15:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  34.0 4.02
 TBHT 30.6 3.28
 COIL + EE  29.0 5.14
 TGHT  30.0 5.75

 


Friday, May 27, 2016, 15:27: IV4 Closed

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.02
 TBHT 32.2 3.42
 COIL + EE  28.7 5.22
 TGHT  29.7 5.77

 


Monday, May 30, 2016, 08:35:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  33.8 4.05
 TBHT 29.9 3.25
 COIL + EE  28.7 5.18
 TGHT  29.7 5.78

Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.


Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.


Wednesday, June 01, 2016, 09:10: Venting

Wednesday, June 01, 2016, 9:45: Water lines purged, power off.

  511   Friday, June 03, 2016, 14:50 Aaron Schmidt       Pumping down empty chamber.

Friday, June 03, 2016, 14:50: Turbo pumps started.

Friday, June 03, 2016, 15:22:  RGA on.


Monday, June 06, 2016, 15:40: RGA still connected. OK. Screen shot saved. Vacuum @ 8.5E-07T


Wednesday, June 08, 2016, 15:26: RGA off

Wednesday, June 08, 2016, 15:29: Ion gauge off. Turbo pumps off.


Thursday, June 09, 2016, 12:44: Venting -AM

  512   Thursday, June 09, 2016, 14:56 Aaron Schmidt LP-SIS     TUBE ONLY

Thursday, June 09, 2016, 14:50: Begin roughing.

Thursday, June 09, 2016, 15:34: Turbo pumps started.

Thursday, June 09, 2016, 15:42: Ion gauge on.


Friday, June 10, 2016, 08:27: RGA on.

Friday, June 10, 2016, 08:35: Water opened. RGA ok. Vacuum stable @ 1.9E-7T

Friday, June 10, 2016, 08:50: BIAS/EZL/EE to 30/13/1.5kV.

Friday, June 10, 2016, 08:52: Auto ramping TBHT only @ 2A min to 50A.

Friday, June 10, 2016, 10:02: Auto ramping TBHT only @ 1A min to 100A.

Friday, June 10, 2016, 11:14: Continue ramping to 150 A -AM

Friday, June 10, 2016, 11:28: Stopped ramping ag 110 A -AM


Monday, June 13, 2016, 08:12: Auto ramping TBHT only @ 1A min to 150A.

Monday, June 13, 2016, 09:59: Ramping to 150 A - AM


Monday, June 13, 2016, 15:51: Ramping down.


Tuesday, June 14, 2016, 07:47: IV4 Reset. Ion gauge off. Turbos off.

Tuesday, June 14, 2016, 07:52: Power/sources off. Water purged.

Tuesday, June 14, 2016, 09:20: Venting.

Attachment 1: Tube_only_SIS_test.zip
  513   Friday, June 10, 2016, 12:42 Anders Mjos      Problems/SolutionsFC0 BIAS probelm

 Graham Waters is looking into this problem. The IOC has been rebooted a couple of times.

  514   Tuesday, June 14, 2016, 10:46 Aaron Schmidt LP-SIS     TUBE ONLY - NO PLASMA ELECTRODE

Tuesday, June 14, 2016, 10:46: Begin roughing.

Tuesday, June 14, 2016, 11:16: Turbo pumps started.

Tuesday, June 14, 2016, 11:23: Ion gauge on.


Wednesday, June 15, 2016, 07:45: Water opened. RGA ok. Vacuum stable @ 1.9E-7T. Power/sources on.

Wednesday, June 15, 2016, 08:24: BIAS / EZL / EE to 30 / 13 / 1.5 kV

Wednesday, June 15, 2016, 08:24: Ramping TBHT to 120 A at 1 A/min

Wednesday, June 15, 2016, 10:23: EZL P/S was not on. Switched on and set to 13 kV

Wednesday, June 15, 2016, 15:05: Ramping down.


Thursday, June 16, 2016, 08:57: IV4 reset. RGA off. Ion gauge off. Turbo pumps off.

Thursday, June 16, 2016, 13:22: Water lines purged. Power/sources off. Venting.

Attachment 1: Tube_only_SIS_test-all-160615.zip
Attachment 2: 2016-06-13.zip
Attachment 3: 2016-06-15.zip
Attachment 4: re-em-plots.zip
  515   Thursday, June 16, 2016, 14:34 Aaron Schmidt LP-SIS     TUBE ONLY (3)

Thursday, June 16, 2016, 14:33: Roughing. Plasma Electrode re-attached. Salts replaced.

Thursday, June 16, 2016, 15:12: Turbo pumps started.

Thursday, June 16, 2016, 15:22: Ion gauge on.


Friday, June 17, 2016, 08:32: Water opened. RGA ok. Vacuum stable @ 2.4E-7T. Power/sources on.


Saturday, June 18, 2016, 09:31: Cool down started.


Monday, June 20, 2016, 09:48: Sources/power/voltages off.

Monday, June 20, 2016, 10:06: IV4 reset. Water lines purged.

 Monday, June 20, 2016, 10:11: RGA off. Ion gauge off. Turbos off.

Monday, June 20, 2016, 11:50: Venting

Attachment 1: Tube_only-full-fernando_test-160617-PE-RPE.zip
Attachment 2: Tube_only-full-fernando_test-160617-WPE.zip
  516   Monday, June 20, 2016, 14:36 Aaron Schmidt       Pump down empty chamber.

Monday, June 20, 2016, 12:50: roughing down

Monday, June 20, 2016, 14:30: Turbo pumps on. Ion gauge on.


Monday, June 27, 2016, 09:00: Ion gauge off. Turbo pumps off.

  517   Friday, June 24, 2016, 08:07 Aaron Schmidt       Emittance scanner check/repair.

Friday, June 24, 2016, 08:06: Ion gauge IG6 OFF. Turbo pumps TP6 and TP2 off.

Friday, June 24, 2016, 09:58: Venting.

Friday, June 24, 2016, 10:17: Remove emittance scanner for inspection.

Friday, June 24, 2016, 10:20: Roughing.

Disassemble, inspect.

Move bearing along screw. Acetone to break down old grease. Wiped clean. Move bearing back and forth, use pick to remove dirt. Re-grease.

Clean, and reassemble.

Test emittance scanner (outside of vacuum) . Draw in OK. Draw out OK.

Friday, June 24, 2016, 13:35: Venting.

Install emittance scanner.

Friday, June 24, 2016, 14:10: Roughing.

Test. Draws in fine. Draw out fails 3/4 of the way back up.

Friday, June 24, 2016, 14:32: Turbo pumps started.

Friday, June 24, 2016, 14:37: Ion gauge on.

Work to continue when more information is found on emittance scanner motor & history.

  519   Wednesday, June 29, 2016, 16:28 Aaron Schmidt       Pump down empty chamber.

Wednesday, June 29, 2016, 16:28 : Roughing


Thursday, June 30, 2016, 08:44: Turbo pumps on.


Thursday, July 07, 2016, 13:11: Turbo pumps off. Ion gauge off.


Monday, July 11, 2016, 12:50: Venting. ERROR on PuTTY.

Monday, July 11, 2016, 13:05: IOC WHITEOUT?

Monday, July 11, 2016, 13:25 All returned to normal.

  520   Wednesday, July 06, 2016, 10:42 Anders Mjos      Problems/SolutionsEmittance scanner check/repair.

Dave Morris increased the current from ~ 1 A to ~2.5 A. This seem to solve the problem with the in/out drive of the emittance meter

  521   Monday, July 11, 2016, 13:51 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulators

Monday, July 11, 2016, 13:49: Begin roughing.

10 µL: K & Rb added

5 µL: Cs added

Monday, July 11, 2016, 14:59 : Turbo pumps started.

Monday, July 11, 2016, 15:33 : Ion gauge on.


Tuesday, July 12, 2016, 08:13 : RGA on.

Tuesday, July 12, 2016, 08:18 : Water, power/sources on. Vacuum stable at 3.2E-7 T. No response on RGA.

Tuesday, July 12, 2016, 08:35: Auto-ramping TBHT only @ 1A/min to 110A. EZL/EE/BIAS to 13/1.5/30 kV.


Wednesday, July 13, 2016, 08:17: Reduced TBHT to 100 A -AM

Wednesday, July 13, 2016, 18:15: Auto-cool @ 1.5A/min


Thursday, July 14, 2016, 08:20: Sources/power off

Thursday, July 14, 2016, 08:27: RGA off, IV4 closed, Ion gauge off. Turbo pumps off. Water lines closed.

Thursday, July 14, 2016, 12:57: Venting

 

Attachment 1: Tube_only_test_-_with_insulators_&_new_EE_Maldonado_160712.zip
Attachment 2: 160713.zip
  522   Thursday, July 14, 2016, 13:22 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulators - No PE

Thursday, July 14, 2016, 14:41:  Roughing started.

Thursday, July 14, 2016, 15:41: Turbo pumps started.

Thursday, July 14, 2016, 15:58: Ion gauge & RGA on.


Friday, July 15, 2016, 08:15: Water, power/sources on. Vacuum stable at 3.9E-7 T. No response on RGA.

Friday, July 15, 2016, 08:25: Optics on. BIAS/EZL/EE to 30/13/1.5kV

Friday, July 15, 2016, 08:30: Auto-ramp TBHT to 110A @ 2A/min

Friday, July 15, 2016, 11:19; Auto-ramp TBHT to 130A @ 2A/min

Friday, July 15, 2016, 11:21: IV4 opened


Monday, July 18, 2016, 09:03: TBHT cooling started @ 2A/min

Monday, July 18, 2016, 09:04: RGA disconnected/Filament off.

Monday, July 18, 2016, 10:16: Sources off. IV4 closed. Turbo pumps off.

Monday, July 18, 2016, 11:17: Venting. Note* Global reset used each time VV1 was opened and closed. VV1 becomes non-responsive otherwise.

Monday, July 18, 2016, 11:25: Water purged. Power off/lockout.

Attachment 1: Tube_only_Test_-__New_Insulators-No_PE-160715.zip
Attachment 2: 160716.zip
  523   Monday, July 18, 2016, 12:20 Aaron Schmidt     41751-7 Tube only - No EE - No PE

Monday, July 18, 2016, 12:19: Roughing.

Monday, July 18, 2016, 13:13: Turbo pumps on.

Monday, July 18, 2016, 13:18: Ion gauge on.


Tuesday, July 19, 2016, 08:28: Power/Water on. No response on RGA. Vacuum stable @ 2.63E-7 T.

Tuesday, July 19, 2016, 08:43: Optics on. BIAS/EZL/EE on 30/13/0 kV. Auto-ramp TBHT to 110A @ 2 A/min.

Tuesday, July 19, 2016, 10:15: Auto-ramp TBHT to 130A @ 2 A/min.

Tuesday, July 19, 2016, 13:325: Auto-ramp down TBHT @ 2 A/min - AM

Tuesday, July 19, 2016, 13:36: Optics and BIAS / EZL / EE off -AM.

Tuesday, July 19, 2016, 14:28: Turbos off/Turbo vent.

Tuesday, July 19, 2016, 14:33: Venting.

 

Attachment 1: Tube_only_-_No_EE_-_No_PE.zip
  524   Tuesday, July 19, 2016, 15:15 Aaron Schmidt     41751-7 Tube only - No EE - With PE

Tuesday, July 19, 2016, 15:14: Roughing.

Tuesday, July 19, 2016, 15:48: Turbo pumps started.

Tuesday, July 19, 2016, 15:55: Ion Gauge on.


Wednesday, July 20, 2016, 08:15: RGA On.

Wednesday, July 20, 2016, 08:25: Power/water on. No response on RGA. Vacuum stable @ 2.7E-7 T

Wednesday, July 20, 2016, 08:28: Sources on BIAS/EZL/EE @ 30/13/0 Kv

Wednesday, July 20, 2016, 08:31: Auto-ramping TBHT @ 2A/min.

Wednesday, July 20, 2016, 13:01: Auto-Cooling TBHT @ 3A/min.

Wednesday, July 20, 2016, 14:45: Sources off.

Wednesday, July 20, 2016, 14:47: RGA off. IV4 Closed.

Wednesday, July 20, 2016, 14:49: Turbos off.

Wednesday, July 20, 2016, 14:53: Power off. Water line purged.


Thursday, July 21, 2016, 07:52: Venting

Attachment 1: Tube_only_-_No_EE_-_With_PE.zip
  525   Thursday, July 21, 2016, 09:51 Aaron Schmidt LP-FEBIAD     Febiad Test - NEW COIL - No PE

Thursday, July 21, 2016, 08:55: Roughing.

Thursday, July 21, 2016, 09:50: Turbo pumps started.

Thursday, July 21, 2016, 09:54: Ion Gauge on.

Thursday, July 21, 2016, 11:12: RGA on.

Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T


Friday, July 22, 2016, 08:40: Opening gas lines.

Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.

Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.

Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm

Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM

Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM


Monday, July 25, 2016, 09:39:

Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP  38.0 3.82
 TBHT 27.9 2.96
 COIL + EE  27.7 4.94
 TGHT  29.7 5.51

Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.


Wednesday, July 27, 2016, 14:37: Spark tripped off IG6

Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV

Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV

Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)

Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target


Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.

Thursday, July 28, 2016, 09:09: Source gas control off. Venting.

  526   Thursday, July 28, 2016, 08:21 Anders Mjos      Problems/SolutionsTMS:MB1 time out

Fault report submitted. 9156

Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller

  527   Thursday, July 28, 2016, 11:12 Aaron Schmidt       Pump down empty chamber.

Thursday, July 28, 2016, 10:00 Roughing.

  529   Monday, August 08, 2016, 09:48 Aaron Schmidt    41882-441751-1 HS Test Full Clean

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-1 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.

Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.

Monday, August 08, 2016, 10:10: Roughing.

Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.

Monday, August 08, 2016, 10:40: Both Turbo pumps started.

Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.

Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T


Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T

Tuesday, August 09, 2016, 08:19: Power/sources on.

Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T

Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A

Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T

Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T


Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.

Wednesday, August 10, 2016, 09:14: Venting.

Attachment 1: HS_41751-1_TEST.docx
Attachment 2: TS-2016-08-08-11-45.rga
Attachment 3: 20160824_144103.jpg
20160824_144103.jpg
Attachment 4: 20160824_144106.jpg
20160824_144106.jpg
  530   Wednesday, August 10, 2016, 08:09 Aaron Schmidt    41882-441751-2 HS Test Full Clean

Heat Shield Test (Fully Cleaned).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-2 . OR, Acetone, Methanol. TGHT only.

No insulators, bracket, or gripper arms. Blank/Plate. No source cup.

Wednesday, August 10, 2016, 09:47: 41751-1 removed from test stand. Exchange target & End plates to 41751-2

Wednesday, August 10, 2016, 10:07: 41751-2 placed into test stand. Door open for 20 minutes.

Wednesday, August 10, 2016, 10:10: Roughing.

Wednesday, August 10, 2016, 10:13: Doors finally sealed for roughing.

Wednesday, August 10, 2016, 10:23: BV1B OPEN. Opened @ 59T.

Wednesday, August 10, 2016, 10:45: Both Turbo pumps started.

Wednesday, August 10, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 10, 2016, 10:53: TP1A @ speed 38 KRPM

Wednesday, August 10, 2016, 11:45: RGA on. Vacuum @ 3.56E-6T


Thursday, August 11, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.34E-7T

Thursday, August 11, 2016, 08:19: Power/sources on

Thursday, August 11, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.36E-7T

Thursday, August 11, 2016, 11:15: Screen shots and check made @ 329-330A.

Thursday, August 11, 2016, 13:25: TGHT @ 580A. Vacuum @4.16E-7T

Thursday, August 11, 2016, 15:54: Screen shots and check made @ 580A. Vacuum @4.43E-7T and increasing. Cool in Am.


Friday, August 12, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T

Friday, August 12, 2016, 13:20: Cooling Complete. Vacuum @ 2.16E-7T.

Friday, August 12, 2016, 13:33: Water lines purged. Power/sources off.


Monday, August 15, 2016, 08:07: Turbo pumps, Ion gauge, and RGA off.

Monday, August 15, 2016, 09:14: Venting.

Attachment 1: HS_41751-2_TEST.docx
Attachment 2: TS-2016-08-10-11-45.rga
Attachment 3: 20160824_143539.jpg
20160824_143539.jpg
  531   Friday, August 12, 2016, 14:40 Aaron Schmidt      Problems/SolutionsEmittance scanner communications

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05

Emittance rig communications affected.

Enter 100 on Dac -- Reads: -500

Enter -100 on Dac -- Reads: -500. No response

@ 10V


Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications

Calibrate

test scan & park

Enter: 100 on Dac -- Reads 100

Enter: 200 on Dac -- Reads 200

Enter: 0 on Dac -- Reads 0

Enter: -200 on Dac -- Reads -200

Fixed