  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan startedmass scan has been started after optimization
on 23Na
  
  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling See attached photo  Nb#7_swelling_insulator.pdf 
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool downstart cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL.
  
  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVentingWednesday, September 12, 2012, 08:01: Turbos
off
Wednesday, September 12, 2012, 13:35:
  
  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulatorsReplaced swollen insulator and added Ta
heat shield on insulator.
 
  
  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater onThursday, September 13, 2012, 08:16: Opened
up cooling water. Vacuum (IG1) increased
from 5.9E-7 to 6.2E-7 before returning to
  
  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started    
  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVentingTarget cooled down. Power supplies off.
Friday, September 14, 2012, 15:27:
Turbos off.
  
  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping downThursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on
  
  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

    

       
            
  
  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS StartupDid the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress.
  
  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)The TSH:TGHT stopped at 263.7A, but the
setpoint is still ramping (now  at 421A).
The voltage is set correctly: have 6.238V
  
  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Normal
0




false
false
false
  
  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown startedStarted the cooldown for SiC#3.   
  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off. All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1
  
  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test StandVenting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. 
  
  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget RemovedTarget looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab.
  
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  364   Monday, March 17, 2014, 19:10 Anders MjosTa#42LP-SISITWTM440282-139956-1 / 39956-9 (base / lid)In progressConditioningNOTE:
TBHT
Power Supply is 600A. EPICS thinks it is
 Ta#42_Test_Stand.docxOMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp 
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in