  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan started

mass scan has been started after optimization on 23Na

  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling

 See attached photo

Attachment 1: Nb#7_swelling_insulator.pdf
Nb#7_swelling_insulator.pdf
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool down

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVenting

Wednesday, September 12, 2012, 08:01: Turbos off

Wednesday, September 12, 2012, 13:35: Venting, water off and purged.

Wednesday, September 12, 2012, 13:55: Vented

  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulators

Replaced swollen insulator and added Ta heat shield on insulator.

 

Wednesday, September 12, 2012, 17:03: Roughing

Wednesday, September 12, 2012, 17:23 : Starting turbos

Wednesday, September 12, 2012, 17:32 : Turbos at speed

Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5

  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater on

Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.

  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started
  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVenting

Target cooled down. Power supplies off.

Friday, September 14, 2012, 15:27: Turbos off.

Friday, September 14, 2012, 15:32: Water purged.

 Friday, September 14, 2012, 16:00: Venting

Friday, September 14, 2012, 16:26: Vented

  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping down

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

Anders Mjos wrote:

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

 Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T

  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS Startup

Did the HV conditioning for the TiC#3 up to 30kV.

Heaters ramp up in progress.

  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389

  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt

The scan was taken at TGHT=573A (read from the PS panel) .

The TBHT = 230A

  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown started

Started the cooldown for SiC#3.

  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off.

All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.

Same for the TSG optics: CB1, VCB1 and CBC.

Talked to Evgeniy and Kazuya. Optics are OFF now.

  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test Stand

Venting the Test Stand.

TiC#3 will be ready to be removed in few minutes. 

Please note: water is still ON.

  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget Removed

Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.

The torque required to loosen the bolts were measured (from left to right):

Target legs: 48 and 30 in lbs

Tube htr: 25, 30 and 25 in lbs

  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioning

Target installed with 130 in lbs torque on all bolts.

Monday, March 25, 2013, 11:36: Roughing

Monday, March 25, 2013, 11:54: Starting turbos

Monday, March 25, 2013, 12:02: Both turbos at speed

Monday, March 25, 2013, 12:04: Vacuum at 2E-5  Torr

Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr


Tuesday, March 26, 2013, 09:11

All P/S switched on.


ISAC Ops will condition this target as a training exercise.

ISAC ops e-log
ISAC ops e-log 2

Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.


Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.

Thursday, March 28, 2013, 13:27: Venting

Thursday, March 28, 2013, 13:33: Water purged

  364   Monday, March 17, 2014, 19:10 Anders MjosTa#42LP-SISITWTM440282-139956-1 / 39956-9 (base / lid)In progressConditioning

NOTE:

TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.

Time stamp on OM-DAQPRO-5300 is on hour behind (daylight savings).

 


All bolts torqued to 130 in lbs. TGHT and TBHT bolts tightened and loosened 3x.

Monday, March 17, 2014, 19:10: Roughing

Monday, March 17, 2014, 19:30: Turbos started

 Monday, March 17, 2014, 19:38: Turbos at speed. 

Monday, March 17, 2014, 19:40: Vacuum at 1.3E-5 T


BY R.M.

Tuesday, March 18, 2014, 10:10: Vacuum 2.87e-07 T

Tuesday, March 18, 2014, 10:12: Heatshield Water Circuit turned on

Tuesday, March 18, 2014, 10:25: Vacuum 2.85e-07 T

By AM

Tuesday, March 18, 2014, 16:06:

Conditioned high voltage BIAS to 30kV. BIAS:RDCUR 37 uA.

Started heater auto-ramping. TBHT to 50A at 1A/min. TGHT to 100A at 2 A/min.

Vacuum at 2.7E-7 T

Tuesday, March 18, 2014, 17:06: TBHT and TGHT reached 50A and 100A respectively. Local readback on TBHT is 58A (as expected - see note above). Vacuum is gradually coming down.


Operation stable over night. TSG:CBC needed to be restarted. Switched off over night.

Wednesday, March 19, 2014, 08:21: Continue heating to 85A / 250 A TBHT/TGHT.

Wednesday, March 19, 2014, 09:12

Water temperatures 27 - 28 deg C, and flow Rates
4.0 l/m HS+MSP
6.4 l/m TBHT
5.1 l/m COIL+EE
5.6 l/m TGHT

Wednesday, March 19, 2014, 09:57: Continue heating to 170 A / 500 A, TBHT/TGHT

Wednesday, March 19, 2014, 09:58: Opened IV4

Wednesday, March 19, 2014, 09:58: Restarted Q1.

Wednesday, March 19, 2014, 10:11: Switched FC0 bias to negative

Wednesday, March 19, 2014, 10:30: Q1 restarted. Possible spark. Small vacuum response on IG1

Wednesday, March 19, 2014, 10:49: Some sparking

Wednesday, March 19, 2014, 12:43: Continue heating to 190A / 580 A TBHT/TGHT.

Wednesday, March 19, 2014, 13:00: TBHT voltage limited. Increased limit to 2.3V

Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
28 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT

Wednesday, March 19, 2014, 13:32: Local read back on PS: 223A / 580A TBHT/TGHT

Water temperatures and flow rates
37 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
31 C 5.6 l/m TGHT

Wednesday, March 19, 2014, 14:30: Measured ~2E-7 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 4.2E-8 T

Wednesday, March 19, 2014, 14:58: TBHT was voltage limiting. Increased voltage limit to 2.4 V

Target will condition over night.


Thursday, March 20, 2014, 10:07: Measured ~1.4E-8 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 8.3E-7 T

Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
27 C 6.4 l/m TBHT
27 C 5.1 l/m COIL+EE
29C 5.6 l/m TGHT

Thursday, March 20, 2014, 10:13: Starting mass scan 200 - 0

Local current  on PS (TBHT/TGHT): 227 A / 580 A

At about 10:15 to 10:20 the TGHT:RDVOL dropped from 7.2 - 7.1 V.

Thursday, March 20, 2014, 11:05: Mass scan finished.

Water temperatures and flow rates
36 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT

Thursday, March 20, 2014, 13:20

Water temperatures and flow rates
34.8 C 4.0 l/m HS+MSP
26.1 C 6.4 l/m TBHT
26.8 C 5.1 l/m COIL+EE
28.4 C 5.6 l/m TGHT

Thursday, March 20, 2014, 13:24: Conditioning EE to -2kV

Thursday, March 20, 2014, 13:26: EE at -2kV and 694 uA

Thursday, March 20, 2014, 13:36: Lowering EE back to -1.4kV

Thursday, March 20, 2014, 13:38: Starting the cool down of the target at 2 A/min

Thursday, March 20, 2014, 15:08: Closed IV4


Friday, March 21, 2014, 08:32: Lowered BIAS, EE and EZL to 0. TGHT and TBHT off.

Friday, March 21, 2014, 08:33: Stopped turbos. Vacuum at 1.3E-7 T

Friday, March 21, 2014, 13:10: Venting

Attachment 1: Ta#42_Test_Stand.docx
Attachment 2: OMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9

Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS  installed in test stand with Ta tube as heat load.

Friday, April 04, 2014, 16:29: Chamber roughing started

Friday, April 04, 2014, 16:51: Turbos started

Friday, April 04, 2014, 16:59: TP1B at speed

Friday, April 04, 2014, 17:00: TP1A at speed

Friday, April 04, 2014, 17:00: IG1 Turned on vacuum at 2.8e-05T

 


Tuesday, April 08, 2014, 10:37: Vacuum 1.8e-07 T - Heatshield water turned on

Tuesday, April 08, 2014, 10:40: No change in vacuum pressure.

 


Wednesday, April 09, 2014, 11:46: Started heating tght to 200 amps

Wednesday, April 09, 2014, 14:58: Heating increased to 400 amps

 


Thursday, April 10, 2014, 14:58: Heating increased to 580 amps


By AM

Friday, April 11, 2014, 14:57: Started cool down. Vacuum at 4.2E-7 T


By AM

Wednesday, April 23, 2014, 09:18: Turbos stopped. Vacuum at 1.2E-7 T

Wednesday, April 23, 2014, 13:50: Venting

Wednesday, April 23, 2014, 14:14: Heat Shield removed