195
|
Friday, September 07, 2012, 12:11 |
Friedhelm Ames | NB#7 | LP-SIS | | | | | In progress | mass scan started | mass scan has been started after optimization on 23Na |
|
197
|
Friday, September 07, 2012, 14:34 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator ITD0342 overheated - swelling | See attached photo |
Attachment 1: Nb#7_swelling_insulator.pdf
|
|
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL. |
|
200
|
Wednesday, September 12, 2012, 08:02 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Venting | Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented |
|
201
|
Wednesday, September 12, 2012, 17:04 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Pumping down - w/replaced insulators | Replaced swollen insulator and added Ta heat shield on insulator.
Wednesday, September 12, 2012, 17:03: Roughing
Wednesday, September 12, 2012, 17:23 : Starting turbos
Wednesday, September 12, 2012, 17:32 : Turbos at speed
Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5 |
|
202
|
Thursday, September 13, 2012, 08:24 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Water on | Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations. |
|
203
|
Thursday, September 13, 2012, 13:05 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | | heater ramping up started | |
|
204
|
Friday, September 14, 2012, 15:27 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Venting | Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27: Turbos off.
Friday, September 14, 2012, 15:32: Water purged.
Friday, September 14, 2012, 16:00: Venting
Friday, September 14, 2012, 16:26: Vented |
|
223
|
Thursday, October 25, 2012, 13:02 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | In progress | Pumping down | Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T |
|
224
|
Friday, October 26, 2012, 08:29 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target ready for conditioning |
Anders Mjos wrote: |
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T
|
Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T |
|
225
|
Thursday, November 01, 2012, 11:16 |
Aurelia Laxdal | TiC#3 | LP-SIS | ITW | TM1 | | | | TiC#3-LP-SIS Startup | Did the HV conditioning for the TiC#3 up to 30kV.
Heaters ramp up in progress. |
|
226
|
Thursday, November 01, 2012, 14:57 |
Aurelia Laxdal | TiC#3 | LP-SIS | ITW | TM1 | | | | TSH:TGHT readback stopped at 264.5A (for a higher setpoint) | The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389 |
|
227
|
Friday, November 02, 2012, 14:20 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | | Mass scan done |
Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt
The scan was taken at TGHT=573A (read from the PS panel) .
The TBHT = 230A
|
|
228
|
Friday, November 02, 2012, 15:40 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | SiC#3 cooldown started | Started the cooldown for SiC#3. |
|
229
|
Monday, November 05, 2012, 09:47 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | TPS optics cannot be turned off. | All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 and CBC.
Talked to Evgeniy and Kazuya. Optics are OFF now. |
|
230
|
Monday, November 05, 2012, 13:26 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | Venting the Test Stand | Venting the Test Stand.
TiC#3 will be ready to be removed in few minutes.
Please note: water is still ON. |
|
231
|
Monday, November 05, 2012, 14:41 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target Removed | Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Tube htr: 25, 30 and 25 in lbs |
|
287
|
Monday, March 25, 2013, 11:39 |
Anders Mjos | Ta#39 | LP-SIS | ITW | TM1 | | | Done | Ta#39 commissioning | Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
|
364
|
Monday, March 17, 2014, 19:10 |
Anders Mjos | Ta#42 | LP-SIS | ITW | TM4 | 40282-1 | 39956-1 / 39956-9 (base / lid) | In progress | Conditioning | NOTE:
TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.
Time stamp on OM-DAQPRO-5300 is on hour behind (daylight savings).
All bolts torqued to 130 in lbs. TGHT and TBHT bolts tightened and loosened 3x.
Monday, March 17, 2014, 19:10: Roughing
Monday, March 17, 2014, 19:30: Turbos started
Monday, March 17, 2014, 19:38: Turbos at speed.
Monday, March 17, 2014, 19:40: Vacuum at 1.3E-5 T
BY R.M.
Tuesday, March 18, 2014, 10:10: Vacuum 2.87e-07 T
Tuesday, March 18, 2014, 10:12: Heatshield Water Circuit turned on
Tuesday, March 18, 2014, 10:25: Vacuum 2.85e-07 T
By AM
Tuesday, March 18, 2014, 16:06:
Conditioned high voltage BIAS to 30kV. BIAS:RDCUR 37 uA.
Started heater auto-ramping. TBHT to 50A at 1A/min. TGHT to 100A at 2 A/min.
Vacuum at 2.7E-7 T
Tuesday, March 18, 2014, 17:06: TBHT and TGHT reached 50A and 100A respectively. Local readback on TBHT is 58A (as expected - see note above). Vacuum is gradually coming down.
Operation stable over night. TSG:CBC needed to be restarted. Switched off over night.
Wednesday, March 19, 2014, 08:21: Continue heating to 85A / 250 A TBHT/TGHT.
Wednesday, March 19, 2014, 09:12
Water temperatures 27 - 28 deg C, and flow Rates
4.0 l/m HS+MSP
6.4 l/m TBHT
5.1 l/m COIL+EE
5.6 l/m TGHT
Wednesday, March 19, 2014, 09:57: Continue heating to 170 A / 500 A, TBHT/TGHT
Wednesday, March 19, 2014, 09:58: Opened IV4
Wednesday, March 19, 2014, 09:58: Restarted Q1.
Wednesday, March 19, 2014, 10:11: Switched FC0 bias to negative
Wednesday, March 19, 2014, 10:30: Q1 restarted. Possible spark. Small vacuum response on IG1
Wednesday, March 19, 2014, 10:49: Some sparking
Wednesday, March 19, 2014, 12:43: Continue heating to 190A / 580 A TBHT/TGHT.
Wednesday, March 19, 2014, 13:00: TBHT voltage limited. Increased limit to 2.3V
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
28 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 13:32: Local read back on PS: 223A / 580A TBHT/TGHT
Water temperatures and flow rates
37 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
31 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 14:30: Measured ~2E-7 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 4.2E-8 T
Wednesday, March 19, 2014, 14:58: TBHT was voltage limiting. Increased voltage limit to 2.4 V
Target will condition over night.
Thursday, March 20, 2014, 10:07: Measured ~1.4E-8 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 8.3E-7 T
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
27 C 6.4 l/m TBHT
27 C 5.1 l/m COIL+EE
29C 5.6 l/m TGHT
Thursday, March 20, 2014, 10:13: Starting mass scan 200 - 0
Local current on PS (TBHT/TGHT): 227 A / 580 A
At about 10:15 to 10:20 the TGHT:RDVOL dropped from 7.2 - 7.1 V.
Thursday, March 20, 2014, 11:05: Mass scan finished.
Water temperatures and flow rates
36 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:20
Water temperatures and flow rates
34.8 C 4.0 l/m HS+MSP
26.1 C 6.4 l/m TBHT
26.8 C 5.1 l/m COIL+EE
28.4 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:24: Conditioning EE to -2kV
Thursday, March 20, 2014, 13:26: EE at -2kV and 694 uA
Thursday, March 20, 2014, 13:36: Lowering EE back to -1.4kV
Thursday, March 20, 2014, 13:38: Starting the cool down of the target at 2 A/min
Thursday, March 20, 2014, 15:08: Closed IV4
Friday, March 21, 2014, 08:32: Lowered BIAS, EE and EZL to 0. TGHT and TBHT off.
Friday, March 21, 2014, 08:33: Stopped turbos. Vacuum at 1.3E-7 T
Friday, March 21, 2014, 13:10: Venting |
Attachment 1: Ta#42_Test_Stand.docx
|
Attachment 2: OMEGA_OM-DAQPRO-5300_21-Mar-14_13.56.35.dlp
|
|
371
|
Friday, April 04, 2014, 17:01 |
Rick Maharaj | UC#9 | LP-SIS | ITW | TM1 | | 39230-3 | Done | Conditioning Heatshield for UCx#9 | Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Friday, April 04, 2014, 16:59: TP1B at speed
Friday, April 04, 2014, 17:00: TP1A at speed
Friday, April 04, 2014, 17:00: IG1 Turned on vacuum at 2.8e-05T
Tuesday, April 08, 2014, 10:37: Vacuum 1.8e-07 T - Heatshield water turned on
Tuesday, April 08, 2014, 10:40: No change in vacuum pressure.
Wednesday, April 09, 2014, 11:46: Started heating tght to 200 amps
Wednesday, April 09, 2014, 14:58: Heating increased to 400 amps
Thursday, April 10, 2014, 14:58: Heating increased to 580 amps
By AM
Friday, April 11, 2014, 14:57: Started cool down. Vacuum at 4.2E-7 T
By AM
Wednesday, April 23, 2014, 09:18: Turbos stopped. Vacuum at 1.2E-7 T
Wednesday, April 23, 2014, 13:50: Venting
Wednesday, April 23, 2014, 14:14: Heat Shield removed |
|