713
|
Thursday, March 21, 2019, 08:33 |
Aaron Schmidt | | | | | | | | Pump down TS | Thursday, March 21, 2019, 08:32: Roughing. |
|
767
|
Thursday, October 31, 2019, 11:37 |
Fernando Maldonado | | | | | | | Problems/Solutions | Probing anode bias supply on the service cap | Thursday, October 31, 2019, 10:41: Cage
removed. Tape put on the limit switches.
Anode interlock bypassed. |
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: |
|
233
|
Monday, November 19, 2012, 10:20 |
Aurelia Laxdal | Test-SiC | HP-FEBIAD | | | | | | Preparations for E-Fault#6389 investigations | Prepared the Test Stand for Controls to
investigate E-Fault#6389.
|
|
953
|
Wednesday, December 21, 2022, 17:06 |
Carla Babcock | | | | | | | | Prep for power outage | Source and beamline power supplies turned
off in EPICS
HV cage power off |
|
619
|
Thursday, December 21, 2017, 15:12 |
Anders Mjos | | | | | | | | Powered down devices | Powered down vacuum gauge and turbo pump
controllers |
|
546
|
Friday, October 14, 2016, 13:17 |
Anders Mjos | | | | | | | Problems/Solutions | Powerbump tripped off turbos | Friday, October 14, 2016, 13:17: Restarted
pumps
Friday, October 14, 2016, 13:4: Another |
|
575
|
Tuesday, April 04, 2017, 14:33 |
Aaron Schmidt | | | | | | | | Power supply failure to E-rig | Wednesday, March 29, 2017, 15:15: DAC power
supply appears to have failed. Pop sound
and electrical smoke/smell noticed. |
|
1033
|
Tuesday, December 03, 2024, 14:55 |
Dave Neilson | | | | | | | Done | Power supply changed to CATHODE mode (-) | Tuesday, December 03, 2024, 14:55 ANODE/CATHODE
power supply switched to cathode mode, NEGATIVE |
|
705
|
Thursday, January 10, 2019, 11:38 |
Aaron Schmidt | | | | | | | | Power outtage prep | Thursday, January 10, 2019, 11:32: Power
down TS. Lock out.
Thursday, January 10, 2019, 11:36: |
|
569
|
Monday, February 06, 2017, 09:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage. | Weekend power outage. All turbos were tripped.
Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: |
|
673
|
Thursday, July 12, 2018, 08:24 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Power outage / restart | Power outage (07/11/2018 @ approx 21:53)
shut down the test stand.
|
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) |
|
621
|
Monday, January 22, 2018, 09:04 |
Aaron Schmidt | | | | | | | Done | Power outage & Controller replacement. | Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. |
|
616
|
Monday, December 04, 2017, 08:29 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage | Power outage over the weekend. Reboot PLC
and systems.
Monday, December 04, 2017, 08:22: |
|
257
|
Thursday, December 20, 2012, 14:19 |
Anders Mjos | | | | | | | | Power down for holidays | |
|
406
|
Monday, October 20, 2014, 09:17 |
Anders Mjos | | | | | | | Problems/Solutions | Power bump this weekend tripped off all turbo pumps | Monday, October 20, 2014, 09:17:
Roughing
Monday, October 20, 2014, 09:18 : |
|
909
|
Tuesday, January 04, 2022, 13:00 |
Aaron Schmidt | | | | | | | | Post water leak | December 30th, 2021: Water poured
down around Isac test stand and probes lab |
|
327
|
Friday, August 23, 2013, 11:16 |
Anders Mjos | | | | | | | Problems/Solutions | Possible leak between BV1A, BV1B and PV1 | CG1A is climbing from 0.016 to 0.130 in
30 seconds when isolated.
The leak was confirmed to be between |
|
769
|
Friday, November 01, 2019, 16:01 |
Fernando Maldonado | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Peek seal tests on UCx#30 HS | Friday, November 01, 2019, 15:47: A symbiotic
peek seal assembly was installed on
the manipulator grip to verify the temperature |
|
|