  ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off. All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1
  
  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test StandVenting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. 
  
  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget RemovedTarget looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab.
  
  232   Monday, November 05, 2012, 14:42 Anders MjosTest SiCHP-FEBIAD    DonePumping downMonday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58:
Started turbos
  
  233   Monday, November 19, 2012, 10:20 Aurelia LaxdalTest-SiCHP-FEBIAD     Preparations for E-Fault#6389 investigationsPrepared the Test Stand for Controls to
investigate E-Fault#6389.
  
  234   Thursday, November 22, 2012, 12:52 Aurelia LaxdalTest-SiCHP-FEBIAD     E-Fault#6389 re-directed to PSEvgeniy and Kazuya investigated the problem
with TSH:TGHT readbacks and they came to
the conclusion that the PS is faulty, and
  
  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57:
  
  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping downThursday, November 29, 2012, 16:21: Roughing   
  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting    
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progressin preparation for RFQ testing. By Sebastian
and Anders
An insulated  9-pin D-sub connector
  
  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed throughBase leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through.
  
  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       VentedIn preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04:
  
  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping downThe RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26:
  
  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed throughVacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
  
  243   Thursday, December 06, 2012, 08:41 Anders Mjos       Opened cooling waterVacuum stable at 2.8E-7 T   
  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connectorA Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVentingThursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 :
  
  247   Thursday, December 13, 2012, 14:38 Anders Mjos       Pumping down empty chamberThursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56
: Starting turbos
  
  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      VentingFriday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target
  