Thursday, May 08, 2014, 15:09, Anders Mjos, , , , , , , Problems/Solutions, SOURCES archiver reported stopped
|
Archiver restarted. |
Monday, June 03, 2013, 15:00, Anders Mjos, , , , , , , Problems/Solutions, SOURCES ARCH Restarted
|
SOURCES ARCH was found not running |
Tuesday, December 17, 2024, 09:46, Dave Neilson, , , , , , 45235-26, In progress, SIS P2N source cup testing
|
Monday, December 16, 2024, 3:34 Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom
left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
|
Monday, July 13, 2015, 17:19, Anders Mjos, , LP-SIS, , , , , In progress, SIS Cup insulator clamping test
|
Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos started
Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T |
Monday, February 26, 2018, 09:13, Carla Babcock, , , , , , , , Running list of changes to the ISAC test stand for >60kV operation 6x
|
1. Al corona shield installed over end of the HV duct to suppress discharges from the sharp edge of the duct.
2. Some moving and shortening of cables to keep them from running close to different voltages.
3. Changed the angle bracket on the 3M bias-EE resistor chain to a plate, same position. |
Wednesday, January 09, 2013, 14:13, Anders Mjos, Empty, , , , , , , Rouging
|
Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
Wednesday, August 05, 2020, 10:01, Aaron Schmidt, , , , , , , Problems/Solutions, Roughing pump swap out.
|
Wednesday, August 05, 2020, 10:00: TP6 & TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: RP2 swapped with a smaller roughing pump from the hot lab.
Wednesday, August 05, 2020, 12:25: Roughing. |
Tuesday, April 17, 2018, 11:02, Aaron Schmidt, , , , , , , Done, Roughing pump issue.
|
Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
TSG:CG1A @ 1.515T
TSG:CG1B @ 1.529T. |
Thursday, August 23, 2012, 11:59, Anders Mjos, , , , , , , Problems/Solutions, Roughing blows the fuse for both roughing pumps.
|
The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first
few hundred torrs of roughing. Reconnect and continue.
Seems the roughing pump RP1 pushes air towards the exhaust of RP2 which blows the fuse |
Thursday, May 25, 2023, 13:47, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, May 25, 2023, 13:47: Roughing. |
Thursday, June 08, 2023, 14:22, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, June 08, 2023, 14:22: Roughing. |
Thursday, October 15, 2015, 11:19, Anders Mjos, , , , , , , Problems/Solutions, Right side TGHT connector block removed
|
The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
Thursday, August 29, 2019, 14:47, Fernando Maldonado, , , , , , Ferran's heat shield, Problems/Solutions, Rewiring-Baking out
|
Thursday, August 29, 2019, 14:47 : Changing back to the nominal wiring
Thursday, August 29, 2019, 17:01: TIS changed to Ferran's heat shield.
Thursday, August 29, 2019, 17:02: 9-pin FT redone. |
Wednesday, October 09, 2024, 13:29, Dave Neilson, , , , , 44691-8 , 45235-26 , , Retainer tests - with mass marker target
|
Wednesday, October 09, 2024, 11:28 Target loaded, remote power supply added for mass marker, negative channel on pin 5, positive channel
on pin 7.
Wednesday, October 09, 2024, 11:50 roughing |
Wednesday, July 11, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Restarting turbos after power bump
|
Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B
Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6
Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7 |
Monday, March 04, 2013, 09:11, Anders Mjos, , , , , , , Problems/Solutions, Restarted turobos after planned power outage
|
Started archivers
Started turbos
Switched on ion gauges |
Wednesday, December 19, 2012, 11:24, Anders Mjos, , , , , , , Problems/Solutions, Restarted turbos in TMS section after power bump
|
Sources arch restared |
Saturday, August 29, 2015, 14:33, Anders Mjos, , , , , , , Problems/Solutions, Restarted IOC after power outage
|
Saturday, August 29, 2015, 15:50: Turbos started |
Monday, January 04, 2021, 08:17, Aaron Schmidt, , , , , , , , Restart TS
|
Restarting TS after holidays & planned power outage.
Monday, January 04, 2021, 08:17: All epics controls in a 'white out' state.
Monday, January 04, 2021, 08:20: Rebooted PLC / IOC. Controls returned. |
Monday, July 06, 2015, 09:29, Anders Mjos, , , , , , , Problems/Solutions, Replaced out gassing gauge on the backing line
|
|
|