375
|
Thursday, May 08, 2014, 15:09 |
Anders Mjos | | | | | | | Problems/Solutions | SOURCES archiver reported stopped | Archiver restarted. |
309
|
Monday, June 03, 2013, 15:00 |
Anders Mjos | | | | | | | Problems/Solutions | SOURCES ARCH Restarted | SOURCES ARCH was found not running |
1041
|
Tuesday, December 17, 2024, 09:46 |
Dave Neilson | | | | | | 45235-26 | In progress | SIS P2N source cup testing | Monday, December 16, 2024, 3:34 Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
Tuesday, December 17, 2024, 09:30 Turbo pumps on
Tuesday, December 17, 2024, 16:21 water cooling on. No effect on vacuum. Vacuum stable at 1.18e-6T
Tuesday, December 17, 2024, 16:41 ramping TGHT TBHT at 1A/30s
Wednesday, December 18, 2024, 10:00 slowly increasing BIAS/EE/EZL to 30/2.5/13 kV
Wednesday, December 18, 2024, 11:40 BIAS EE EZL at 30 2.5 13 kV. 1 spark at 28kV, and there was a downward spike in the TGHT current when bias was at 28.5 kV
Wednesday, December 18, 2024, 11:41 FC0 reading 1.6E-10 A. quite low for total beam, but this is likely due to this target being hot so many times.
Wednesday, December 18, 2024, 11:51 wire scans taken (RPM0)
Wednesday, December 18, 2024, 11:54 FC) extracted for mass scan - mass scan beginning now . Background record appears to be functioning well, although it is high. comparatively to old tests. It could be that those old tests were recording irregularly low background, given the temporary solution that was implemented.
Wednesday, December 18, 2024, 12:13 it seems that a spark took down many optics elements. Going to allow conditioning at 30kV for a while before restarting . - optics elements down due to pressure sensor TMS:IG6 timing out. Vacuum group notified. Will likely bypass the interlock temporarily if it cannot be fixed fast. This should get a more permanent solution as it has failed a number of times before.
Wednesday, December 18, 2024, 13:06 sparks are occurring on average approximately once every 10 minutes. they don't seem to be tripping of any supplies or optics (after IG6). but this spark frequency is significantly higher than observed on other targets lately.
Wednesday, December 18, 2024, 13:24 restarting Mass scan with IG6 interlock forced by. scan name - 2024-12-18_13-47 SISP2N mmOFF.txt
Wednesday, December 18, 2024, 13:51 put FC0 back in, preparing to heat up mass marker. will plan to ramp to 3A to match previous MM tests. also, no sparks in the past 40 minutes, it appears they have subsided. additionally, IG6 has been fixed by vacuum group
Wednesday, December 18, 2024, 14:15 mass marker power supply is not connecting. When attempting to write to its IP address it times out. Had to drop the HV in order to investigate. Have enlisted controls group to aid as it appears to be connected and should be functional.
Wednesday, December 18, 2024, 14:30 had to reset the computer connection to the network 192.168.5. by unplugging and plugging in the usb ethernet connection at computer. situation resolved.
Wednesday, December 18, 2024, 14:40 HV back up and now increasing the mass marker current from 0A to 3A, at 0A, FC0 current is 1.4e-10, very close to previously recorded FC0 mm0A value.
Wednesday, December 18, 2024, 14:56 with mm current at 3.0A, requiring 6V, FC0 current is 2.1e-10 A.
Wednesday, December 18, 2024, 14:58 withdrawing FC0 to take mass scan
Wednesday, December 18, 2024, 15:25 mass scan complete: filename 2024-12-18 15-23 SISP2N mmON.txt
Wednesday, December 18, 2024, 15:27 further increasing mm current to 4.0A. FC0 current increasing noticeably. waiting for plateau. FC0 at 6.6e-10A. wire scans taken
Wednesday, December 18, 2024, 15:39 new mass scan: 2024-12-18 15-53 SISP2N mmON 4A.txt
Wednesday, December 18, 2024, 15:52 mm power supply turned off. 0A.
Wednesday, December 18, 2024, 15:53 rescan of high mass region. still a residual indium mass peak present. will scan again after cooling more.
Wednesday, December 18, 2024, 16:10 mass scan captured that shows the indium peak almost masked in background
Given that the indium peak for 3A was significantly lower than with a regular SIS source cup, i recommend that this target is heated up with the regular source cup again to compare.
Wednesday, December 18, 2024, 16:11 dropping HV EE EZL to 0V
Wednesday, December 18, 2024, 16:13 cooling target to 0/0A at 1A/30s
|
457
|
Monday, July 13, 2015, 17:19 |
Anders Mjos | | LP-SIS | | | | | In progress | SIS Cup insulator clamping test | Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos started
Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.
Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A
Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C
Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C
Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C
Wednesday, July 15, 2015, 15:08: Started ramping down heaters.
Thursday, July 16, 2015, 08:52: Turbos stopped.
Thursday, July 16, 2015, 10:24: Venting
Reconfigured target to no clamping (standard SIS Cup configuration)
Thursday, July 16, 2015, 11:41: Roughing
Thursday, July 16, 2015, 13:40: Turbos started.
Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.
Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A
Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C
Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C
Friday, July 17, 2015, 15:56: Starting cool-down
Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T
Monday, August 10, 2015, 14:42: Venting |
640
|
Monday, February 26, 2018, 09:13 |
Carla Babcock | | | | | | | | Running list of changes to the ISAC test stand for >60kV operation | 1. Al corona shield installed over end of the HV duct to suppress discharges from the sharp edge of the duct.
2. Some moving and shortening of cables to keep them from running close to different voltages.
3. Changed the angle bracket on the 3M bias-EE resistor chain to a plate, same position.
4. Moved the 164K EE resistor chain to sit flat against feedthrough K.
5. Moved the bias-EE spark gap to sit flat against the back of feedthrough K, required tapping a hole in the back of the copper clamp.
6. Cap and top of rack vacuumed.
7. Piece of shielding removed from top of HV rack |
264
|
Wednesday, January 09, 2013, 14:13 |
Anders Mjos | Empty | | | | | | | Rouging | Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
805
|
Wednesday, August 05, 2020, 10:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Roughing pump swap out. | Wednesday, August 05, 2020, 10:00: TP6 & TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: RP2 swapped with a smaller roughing pump from the hot lab.
Wednesday, August 05, 2020, 12:25: Roughing.
Wednesday, August 05, 2020, 13:53: Open BV2 to beam line chamber.
Wednesday, August 05, 2020, 14:21: Turbo pumps on.
Wednesday, August 05, 2020, 14:25: Ion gauge on. Turbo pumps at speed. |
655
|
Tuesday, April 17, 2018, 11:02 |
Aaron Schmidt | | | | | | | Done | Roughing pump issue. | Tuesday, April 17, 2018, 10:57: Vacuum not coming down. @ 1.514T . Backing valves have been closed.
TSG:CG1A @ 1.515T
TSG:CG1B @ 1.529T.
Tuesday, April 17, 2018, 11:02: TSG:PV1 Closed. Roughing pump off.
Vacuum group notified.
Wednesday, April 18, 2018: Replace pump & adapters. Clean.
Wednesday, April 18, 2018, 08:45: Start TSG:RP1 and open PV1, BV1A & BV1B
Wednesday, April 18, 2018, 08:55: exhaust pipe/mesh cleared out back
Wednesday, April 18, 2018, 08:57: Turbo pumps on.
RP status ok.
Thursday, April 19, 2018, 08:30: waterlines opened. No response on RGA. Vacuum @ 3.42e-07T |
181
|
Thursday, August 23, 2012, 11:59 |
Anders Mjos | | | | | | | Problems/Solutions | Roughing blows the fuse for both roughing pumps. | The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first few hundred torrs of roughing. Reconnect and continue.
Seems the roughing pump RP1 pushes air towards the exhaust of RP2 which blows the fuse |
968
|
Thursday, May 25, 2023, 13:47 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, May 25, 2023, 13:47: Roughing. |
970
|
Thursday, June 08, 2023, 14:22 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, June 08, 2023, 14:22: Roughing. |
473
|
Thursday, October 15, 2015, 11:19 |
Anders Mjos | | | | | | | Problems/Solutions | Right side TGHT connector block removed | The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
756
|
Thursday, August 29, 2019, 14:47 |
Fernando Maldonado | | | | | | Ferran's heat shield | Problems/Solutions | Rewiring-Baking out | Thursday, August 29, 2019, 14:47 : Changing back to the nominal wiring
Thursday, August 29, 2019, 17:01: TIS changed to Ferran's heat shield.
Thursday, August 29, 2019, 17:02: 9-pin FT redone.
Friday, August 30, 2019, 00:28: Turbos on
Friday, August 30, 2019, 00:36: IG1 on.
Tuesday, September 03, 2019, 09:09: RGA on. Vacuum stable @ 2.1e-6T
Tuesday, September 03, 2019, 15:00. Wire redone. Crosschecked by Arthur Leung.
Tuesday, September 03, 2019, 15:16: Turbos tripped. TSG:CG1A above 50 mTorr
Wednesday, September 04, 2019, 09:34 : Turbos on. After the bakeout it will be better to have TSG:CG1A checked.
Wednesday, September 04, 2019, 09:43: IG1 on
Wednesday, September 04, 2019, 09:45: RGA on
Wednesday, September 04, 2019, 12:42 : Waterlines opened. No response on RGA. Vaccum stable @ 3.1e-6 T
Wednesday, September 04, 2019, 14:53 : Auto-ramping TGHT / TBHT to 100/ 100 A @ 4 A/min.
Wednesday, September 04, 2019, 16:04: Auto-ramping TGHT / TBHT to 250/ 250 A @ 4 A/min.
Wednesday, September 04, 2019, 17:33: Final auto-ramping of the day TGHT / TBHT to 290/ 290 A @ 4 A/min. Vacuum stable@2.7e-7T
NB: Ferran's HS doesn't have an extraction electrode. Since the purpose of the heating is to "baked-out" the system, this is actually great as the shine will go downstream the beamline.
Thursday, September 05, 2019, 08:05: Auto-ramping TGHT to 580 A @ 2 A/min. Vacuum stable @2.97e-7T
Thursday, September 05, 2019, 09:30: TGHT PS is voltage-limited @440A and 5.2V. Stopping auto-ramping to increase the voltage limit to 7.7 (from previous screenshots).
Thursday, September 05, 2019, 09:31: Auto-ramping TGHT to 580A @ 2A/min.
Wednesday, May 15, 2019, 08:58: Optics/ HV on.
Monday, September 09, 2019, 16:05: Optics set. IV4 open.
Monday, September 09, 2019, 17:26: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Twenty minutes w/o sparks
Monday, September 09, 2019, 17:52 Optics/HV off
Tuesday, September 10, 2019, 10:05: Auto-cooling 4A/min
Tuesday, September 10, 2019, 13:27: IV4 closed.
Tuesday, September 10, 2019, 13:27: IG1 off. RGA off
Tuesday, September 10, 2019, 13:28: Turbos off
Wednesday, September 11, 2019, 09:21: Venting.
Wednesday, September 11, 2019, 09:24 HS waterline purged
Wednesday, September 11, 2019, 10:54: Cleaned the interior of chamber with methanol and Kim-wipes. Some dust and debris were removed with
Wednesday, September 11, 2019, 10:54 : Adding EE to the Assy.
Wednesday, September 11, 2019, 11:03: Roughing.
Wednesday, September 11, 2019, 11:35: Turbos on
Wednesday, September 11, 2019, 11:47: Turbos at speed.
Wednesday, September 11, 2019, 11:48: IG1 on
Wednesday, September 11, 2019, 11:54: RGA on
Friday, September 13, 2019, 08:56: RGA off. IG1 off.
Friday, September 13, 2019, 08:56: Turbos off
Monday, September 16, 2019, 08:11: Venting
Monday, September 16, 2019, 09:58: Assembly removed. |
1025
|
Wednesday, October 09, 2024, 13:29 |
Dave Neilson | | | | | 44691-8 | 45235-26 | | Retainer tests - with mass marker target | Wednesday, October 09, 2024, 11:28 Target loaded, remote power supply added for mass marker, negative channel on pin 5, positive channel on pin 7.
Wednesday, October 09, 2024, 11:50 roughing
Wednesday, October 09, 2024, 12:51 Turbo pumps TP1A TP1B on
Thursday, October 10, 2024, 09:27: Water cooling turned on. no effect on vacuum (2.6e-6T)
Thursday, October 10, 2024, 09:45: Increasing TGHT TBHT to 150/150A at 1A/30s
Thursday, October 10, 2024, 11:07 TGHT TBHT at 120/120A . increasing TGHT TBHT to 580/230 at 1A/10s
Thursday, October 10, 2024, 12:29 during the current increase, when TBHT was at 230 and TGHT reached ~460, the TBHT current began decreasing. Upon inspection, the TBHT voltage is higher than normal and hitting its limit. It may be that there is another current path. that is, it may be shorted.
as TGHT increases, TBHT voltage continues to increase. TGHT voltage is similarly higher than usual, at 6V to deliver 500A.
on another note, the vacuum value has been increasing slowly throughout heating, possibly due to the presence of indium within the mass marker reservoir, or simply because this target has not been hot for some time. Leaving TGHT at 502A for the time being.
Thursday, October 10, 2024, 13:34 Increasing BIAS/EE/EZL to 30/2.5/13 kV.
Thursday, October 10, 2024, 14:27 beginning mass scan - reservoir at 0 A. (reservoir contains solid Indium) - mass scan res In 0A
Thursday, October 10, 2024, 15:19 increased current through reservoir with magnet sitting at mass 115 - noticeable increase in Indium presence in beam beginning at ~2.5A. Brought res current to 3.0A, waited for FC6 current to plateau.- at 5e-10A
Thursday, October 10, 2024, 15:27 mass scan run again
Thursday, October 10, 2024, 15:57 res current decreased to 0A
Thursday, October 10, 2024, 15:57 dropping voltages to 0V
Thursday, October 10, 2024, 16:12 voltages at 0, decreasing TGHT TBHT at 1A/30s |
140
|
Wednesday, July 11, 2012, 15:30 |
Anders Mjos | | | | | | | Problems/Solutions | Restarting turbos after power bump | Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B
Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6
Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7
Wednesday, July 11, 2012, 15:34: TSG turbos at speed. Vacuum 9.5E-6 |
281
|
Monday, March 04, 2013, 09:11 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turobos after planned power outage | Started archivers
Started turbos
Switched on ion gauges
TMSTP2 out as per precious e-log entry (and e-fault 6585) |
255
|
Wednesday, December 19, 2012, 11:24 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turbos in TMS section after power bump | Sources arch restared |
460
|
Saturday, August 29, 2015, 14:33 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted IOC after power outage | Saturday, August 29, 2015, 15:50: Turbos started |
836
|
Monday, January 04, 2021, 08:17 |
Aaron Schmidt | | | | | | | | Restart TS | Restarting TS after holidays & planned power outage.
Monday, January 04, 2021, 08:17: All epics controls in a 'white out' state.
Monday, January 04, 2021, 08:20: Rebooted PLC / IOC. Controls returned.
Monday, January 04, 2021, 08:22: Strip tools started / epics response ok.
Monday, January 04, 2021, 08:23: Switch on TMS:RP2 & TSG:RP1
Monday, January 04, 2021, 08:24: Open PV1 & PV2.
Monday, January 04, 2021, 08:26: Optics, steering, and archivers still in a non-responsive / 'white-out' state.
IOC rebooted on January 6. Controls returned to normal. |
455
|
Monday, July 06, 2015, 09:29 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced out gassing gauge on the backing line | |
|