ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
704
|
Wednesday, January 09, 2019, 09:10 |
Aaron Schmidt | | | | | | | | Cathode to Anode. PS to Positive | Wednesday, January 09, 2019, 09:09: Upper HV cage set to Anode / Positive as per dwg ISK4523D Rev 6.
Thursday, January 10, 2019, 10:00: Switch Anode PS to positive
Thursday, January 10, 2019, 11:29: Anode switched on. Short discovered. 10 V = 0 V & 100 mA. |
703
|
Tuesday, January 08, 2019, 08:11 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS restart | Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on
TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted
TMS:IG6 - Filament switched on controller.
TSG:IG1 - Filament switched over. Cable to ion gauge is burnt. Black wire inside the housing had melted along with the edges of the plastic. Replaced the entire cable & reconnected the ion gauge to the controller.
Tuesday, January 08, 2019, 08:48: IG6 & IG1 operation resumed. Vacuum pump down continued.
Tuesday, January 08, 2019, 08:55: FS5 waterline tightened for leak check. All lines closed.
Tuesday, January 08, 2019, 09:03: RGA restarted/on.
Tuesday, January 08, 2019, 09:05: Opening waterlines. vacuum at 2.66e-06T. Control room notified.
Tuesday, January 08, 2019, 09:10: Waterlines opened. Vacuum @ 2.57e-06T. No response on RGA.
Tuesday, January 08, 2019, 09:14: No leak noted on the FS#5 paddle wheel. Fixed with tightening.
Tuesday, January 08, 2019, 09:20: Control room noted 7.6L fill (1/4" drop approx) in DI water on this line. (Note this next year) |
702
|
Thursday, December 20, 2018, 13:55 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Holiday shut down. | High winds caused a brief power outage that completely shutoff the ISAC test stand.
Locked out the power.
RGA checked & shutoff complete
Epics failure, computer restarted.
Thursday, December 20, 2018, 13:52: Shutting ISAC test stand down for the holidays. Checking Epics & operation first.
Thursday, December 20, 2018, 13:55: Roughing pump operating. Turbos left off. Backing valves opened. Epics whiteout on TS sources & optics.
TBHT, TGHT, Anode all brought to zero on epics, although still mostly white out.
Thursday, December 20, 2018, 14:14: Waterlines shut off at the main source & the TS is purged.
Note* Small leak directly on the fittings noticed on FS#5 right after the flow meter paddle wheel on the supply end. All water flow was briefly halted during the power bump.
Epics still whited out.
Monday, January 07, 2019, 11:13: Fault report 11981 submitted. |
701
|
Monday, December 17, 2018, 12:03 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Anode leak current check. | Monday, December 17, 2018, 12:01: Connected Multimeter through feedthroughs J & L. Blue wire removed.
To run TGHT, TBHT, Anode ONLY. HV will remain locked with yellow tape over the keyhole. Currently locked out.
Tuesday, December 18, 2018, 08:37: Power / sources on
TGHT, TBHT, Anode, Coil on. NO HV.
Tuesday, December 18, 2018, 08:40: Turn off. Anode reading before PS on?
We found a steady climb on the Anode current via the epics controls, however no reading turned up on the multimeter. Disappears once the Anode PS is switched on.
Tuesday, December 18, 2018, 08:46: Power / sources on
TGHT, TBHT, Anode, Coil on. NO HV.
Tuesday, December 18, 2018, 08:49: Auto-ramping TGHT to 580 A @ 2 A per min.
Tuesday, December 18, 2018, 08:50: Anode set to 300 V.
FM Tuesday, December 18, 2018, 13:42: TGHT @ 580 A Anode@300 V. Epics and the power supply shows ~20 mA. However the multimeter doesn't show any reading.
FM Tuesday, December 18, 2018, 14:25: Strange behavior noted on EE while doing the anode voltage scan. Screenshot added to the word document.
FM Tuesday, December 18, 2018, 14:25: Auto-ramping TBHT to 100 A @ 2 A per min
FM Tuesday, December 18, 2018, 15:40: Auto-ramping TBHT to 150 A @ 2 A per min
FM Tuesday, December 18, 2018, 16:26: Auto-ramping TBHT to 200 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:08: Auto-ramping TBHT to 250 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:38: Auto-ramping TBHT to 300 A @ 2 A per min
FM Tuesday, December 18, 2018, 17:20: Auto-ramping TBHT to 250 A @ 2 A per min
FM Tuesday, December 18, 2018, 18:37 : Nothing register on the multimeter, maybe we need to connect between A-B, or B-F. Cooling down to inspect the multimeter connection tomorrow.
FM Tuesday, December 18, 2018, 18:37: Auto-cooling TBHT/TGHT@ 2 A per min
FM Wednesday, December 19, 2018, 09:29: For the lasts 10 hours, the anode drain current has shown a steady value of 10.989 mA even though both the TBHT and the TGHT are off.
FM Wednesday, December 19, 2018, 10:47: Power supplies turned off in EPICS, Anode drain current still shows 4.839 on the readback.
Wednesday, December 19, 2018, 14:25: Power / Sources on. Anode to 300 V. - AS
Wednesday, December 19, 2018, 14:26: Auto-ramping TGHT to 300 A @ 2 A per min. - AS
Thursday, December 20, 2018, 06:42: Auto-ramping TGHT to 580 A @ 2 A per min. - AS
FM Thursday, December 20, 2018, 11:12 : Auto-ramping TBHT to 200 A @ 2 A/min
Thursday, December 20, 2018, 13:05 (Roughly) Power bump due to winds. Full TS shutdown. |
700
|
Wednesday, December 12, 2018, 13:22 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Anode leak current check. | Wednesday, December 12, 2018, 13:15: Power / Sources on.
Wednesday, December 12, 2018, 13:20: RGA on / set.
Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Wednesday, December 12, 2018, 13:30: Auto-ramping TGHT / TBHT to 10A @ 2A per min.
Wednesday, December 12, 2018, 13:36: IV4 open.
Wednesday, December 12, 2018, 13:37: Begin Anode check
Anode: 10 V. Current: 0.000 mA
Anode: 25 V. Current: 0.000 mA
Anode: 50 V. Current: 0.000 mA
Anode: 75 V. Current: 0.000 mA
Anode: 100 V. Current: 0.000 mA
Anode: 125 V. Current: 0.000 mA
Anode: 150 V. Current: 0.000 mA
Anode: 200 V. Current: 0.000 mA
Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:42: Coil to 10A. Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:43: Coil to 25A. Anode: 250 V. Current: 0.000 mA
Wednesday, December 12, 2018, 13:56: Auto-ramping TGHT / TBHT to 150A @ 2A per min.
Wednesday, December 12, 2018, 14:09: Auto-ramping halted @ 35A. Anode to 0 V. Monitor activity on FC0. 5 minutes.
Wednesday, December 12, 2018, 14:13: No changes observed on FC0. Anode back to 250 V.
Wednesday, December 12, 2018, 14:14: Auto-ramping TGHT / TBHT to 150A @ 2A per min.
Wednesday, December 12, 2018, 14:31: Optics all reset.
Thursday, December 13, 2018, 07:31: Auto-ramping TGHT / TBHT to 200A @ 2A per min.
Thursday, December 13, 2018, 10:04: Auto-ramping TGHT / TBHT to 250A @ 2A per min.
FM Thursday, December 13, 2018, 10:40 : Auto-ramping TGHT / TBHT to 270A @ 2A per min.
FM Thursday, December 13, 2018, 12:44: Auto-ramping TGHT / TBHT to 290A @ 2A per min.
FM Thursday, December 13, 2018, 12:56: FC0 gain set to 33nA
FM Thursday, December 13, 2018, 16:54: Anode drain current register at 310. Value was 1 mA. The resistor calculates is 30kOhm. Which is close to what was measured on the resistor on top 34kOhm.
With this new information. I will let the TBHT@290A and the TGHT@300A overnight.
Note to Aaron: Could you please heat up the target to 580A with the current settings we have.
Friday, December 14, 2018, 07:04: Auto-ramping TGHT 580A @ 2A per min. TBHT remains @ 290 A. FC0 back in.
Friday, December 14, 2018, 14:15: Anode @ 250 V & 12.201 mA.
Friday, December 14, 2018, 14:22: BIAS / EZL / EE to 0 V. Anode remains unchanged.
FM Friday, December 14, 2018, 18:04: TBHT down to 50. Anode drain current is still 12.21mA.
FM Friday, December 14, 2018, 18:05 Auto-cooling. i will keep monitoring the strip tools remotely. |
699
|
Thursday, December 06, 2018, 11:02 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Bellows Replacement. | Thursday, December 06, 2018, 11:02: Turbo pumps (TP6 & TP2) off on beamline side. IG6 off.
Thursday, December 06, 2018, 14:06: Turbo pumps restarted. FC0 bellows replacement to occur Monday.
Monday, December 10, 2018, 11:00: Vented on beam side of IV4. Turbo pumps & backing valves closed preemptively on chamber side due to shared airlines.
Pulled FC0, disassemble, check, clean, remove / install bellows, Re-align, assemble.
Monday, December 10, 2018, 12:52: Re-installed repaired FC0. Roughing beam side. Chamber side turbos back on.
Monday, December 10, 2018, 13:48: Turbo pumps on.
Monday, December 10, 2018, 13:51: Ion gauge on. IG6 @ 5.73e-06T and still dropping.
Tuesday, December 11, 2018, 09:26: IG6 Vacuum @ 3.56e-07T. Connected cables.
Tuesday, December 11, 2018, 09:27: Drive out FC0. Vacuum @ 3.75e-07T. Ok. Setup LD & drive FC0 back in.
Tuesday, December 11, 2018, 09:32: LD baseline before opening valve to beam line turbo & RP pumps: below 0.0e-09 T-l/sec
Tuesday, December 11, 2018, 09:36: Full open base, FC0 in:
Vacuum @ 3.56e-07T.
LD: 0.0e-09 atm-cc/sec
Spray w/ He:
No change.
Tuesday, December 11, 2018, 09:42: FC0 out:
Vacuum @ 3.60e-07T.
LD: 0.0e-09 atm-cc/sec.
Spray w/ He:
No Change. Sprayed all flanges and seals all around FC0 and it's connection to the beam line. OK.
Tuesday, December 11, 2018, 09:46: Closed FC0 & line to the turbo & RP pumps. LD off.
FC0 Bellows replacement a success.
More pictures uploaded to Docushare.
Home ---> ISAC Test Stand Test Stand Refurbishing FC0 Bellows Replacement Listing |
698
|
Wednesday, December 05, 2018, 10:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA Filament & Ionizer replacement | RGA Ionizer & Filament replaced as per SRS RGA manual.
The ionizer was found to be dirty and the previous RGA filament was broken. Initially the old filament appeared to have warped and looked stuck to the anode grid/cage.
Both were replaced with clean parts. the support rods were also cleaned with acetone & methanol.
Parts used from the Replacement Ionizer Kit - SRS# O100RI
Repeller Cage - SRS Part# 7-00592
Anode Grid - SRS Part# 7-00591
Focus & Plate - SRS Part# 7-00590
ThO2/Ir Filament - SRS Part# 7-00611-720
Wednesday, December 05, 2018, 10:16: Roughing.
Probe bake out & RGA tuning required.
Wednesday, December 05, 2018, 11:08: Turbo pump on.
Wednesday, December 05, 2018, 11:13: Ion gauge on.
Wednesday, December 05, 2018, 13:38: TSG:BV1A Randomly shut off? TP1A tripped. Restarted.
Wednesday, December 05, 2018, 13:40: RGA switched on including the filament.
Thursday, December 06, 2018, 10:17: Vacuum @ 5.68e-07T on IG1 before Degas. Begin degas cycles 200 sec each, 1 min apart, 3 times.
Thursday, December 06, 2018, 10:30: Degas complete. Minimal change in IG1 Vac @ 5.70e-07T.
|
697
|
Monday, November 19, 2018, 14:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | Vacuum issues. |
1) When opening FC0 a spike occurs in the vacuum on IG6 & IG1 (though not as bad). This spike trips off the optics, and if left unchecked, will trip off the TGHT / TBHT / Sources.
2) RGA is also unresponsive
3) Leak rates also noted in the Ar gas bottle for the FEBIAD source. Previous trips had occurred in the most recent FEBIAD tests.
Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.
Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times.
Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart.
Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.
Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.
Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted.
Monday, November 19, 2018, 14:33: FC0 opened/closed. Vacuum Spike on IG6 noted from 1.5e-06T to 1.02e-05T and back down to 1.5e-06T. IG1 unaffected with IV4 closed.
Source gas lines remain off. Setup for LD on FC0.
Tuesday, November 20, 2018, 08:30: Pump switched on. Convectron gauge @ 18.6 mTorr, spiked to 125 mTorr after opening the valve to the pump. IG1 @ 3.0e-07T.
Allow time for the small pump to pump lines down before re-opening.
Tuesday, November 20, 2018, 08:38: Small vacuum spike noticed on IG1 up to 4.0e-07T after reopening line to the small pump. Convectron gauge spiked to 1.75T.
Tuesday, November 20, 2018, 09:05: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.77e-07T after reopening line to the small pump. Convectron gauge spiked to 3.55 Torr from 125 mTorr.
The small leak in SV5 allows the lines to 'pump down into the mTorr range, however upon opening the line to the pump, the line pressure increases.
Tuesday, November 20, 2018, 10:44: Opened valve to the small pump. Small vacuum spike noticed on IG1 up to 5.02e-07T after reopening line to the small pump. Convectron gauge spiked to 3.25 Torr from 18.6 mTorr.
Pump ineffective at pumping out the gas lines. Replace
Tuesday, November 20, 2018, 10:48: Small pump shut off. Move forward with LD of FC0
Tuesday, November 20, 2018, 13:21 : Valve opened w/ LD connected. Base:
IG6: 1.91e-06T
Leak rate: 7.4e-09 atm-cc/sec.
Apply He around FC0 (cup in):
IG6: 1.91e-06T
Leak rate: 5.5e-05 atm-cc/sec. Wait for leak rate stablization.
Tuesday, November 20, 2018, 13:48:
Apply He around FC0 (cup out):
IG6: 2.75e-05T
Leak rate: 9.9e-05 atm-cc/sec. Wait for leak rate stabilization. Bellows specifically will max out the LD.
-Leak confirmed on the bellows of FC0 as suspected. Submitting a fault report.
-RGA scans checked and taken. No response/noted 'noise'. No error messages displayed, however we will check/swap out the filament for a new one to confirm.
Monday, November 26, 2018, 08:10: Turbos & ion gauges off.
Monday, November 26, 2018, 09:32: Quick vent shot & hold. |
696
|
Thursday, November 08, 2018, 14:13 |
Aaron Schmidt | | | | | | | | Ar & Ne gas bottle replacement. | Thursday, November 08, 2018, 14:05: Fresh / recently calibrated Neon & Argon bottles installed.
Leak rates: Argon=2.02E-7 atm*cc/sec
Neon=1.75E-7 atm*cc/sec
Datasheet attached.
|
695
|
Thursday, November 08, 2018, 10:54 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed.
Thursday, November 08, 2018, 14:10: Turbo pumps started.
Thursday, November 08, 2018, 14:15: Ion gauge on.
Thursday, November 08, 2018, 14:23: RGA on.
Friday, November 09, 2018, 07:38: Waterlines opened. No response on RGA. Vacuum ok @ 5.18e-07T
Friday, November 09, 2018, 07:44 : Slowly start opening gas lines. Opened / closed SV5 initially, no response. Note* Opened SV3 with SV5 closed. Massive spike seen in vacuum.
Friday, November 09, 2018, 07:55 : SV3 opened / closed in conjunction with SV5 until stable vacuum reached. Begin opening SV4 w/ SV5 closed.
Friday, November 09, 2018, 08:09 : SV3 & SV4 opened with SV5, Stable vacuum reached. Begin opening SV2/SV1 w/ SV5 closed.
Friday, November 09, 2018, 08:15: All gas lines opened. Sources on.
Friday, November 09, 2018, 08:22: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. Optics switched on.
Friday, November 09, 2018, 08:40: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min. Loop to max values, increase of 0A until vacuum gets below 1.0e-06T. Vacuum 1.12e-06T.
Friday, November 09, 2018, 10:45: The vacuum wouldn't drop below 1.12e-06T. Ramping halted and gas lines closed. Vacuum dropped to 7.48e-07T. Gas lines opened again. Vacuum stable around 1.12e-06T. Significant Argon noted on RGA.
Friday, November 09, 2018, 10:52: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2A per min. Vacuum increment limit increased to 2.0e-06T
Tuesday, November 13, 2018, 08:32: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, November 13, 2018, 11:08: Mass scans ok. Auto-ramping TBHT to 330 A @ 2A per min.
FM
Tuesday, November 13, 2018, 16:44: The anode drain current has increased 17mA since 11:23 am, however FC0 is still decreasing. I will keep monitoring to see if the behaviour of the anode drain current continues once FC0 has stabilized. If the anode drain current keeps increasing maybe we will observe the same failure from the previous FEBIAD.
FM
Wednesday, November 14, 2018, 11:02 FC0 is stable but the anode drain current is still increasing and now is at 85 mA. It started at ~52mA. From the strip tool it seems to be a 2-hour period where the anode drain current is stable.
Wednesday, November 14, 2018, 16:14 : Magnet tune for 40Ar. TMS:MB1=101.56126 A
Coil=50 A. FC6=19.37 nA
Wednesday, November 14, 2018, 16:16 : Closing Neon valve.
Wednesday, November 14, 2018, 16:26 : FC6=13.77 nA.
Wednesday, November 14, 2018, 16:27: Closing Argon valve
Wednesday, November 14, 2018, 17:10: 0.119 nA.
Wednesday, November 14, 2018, 17:15 Assuming the 720 nA from Brad (I will recompute this value based on the new bottles). Efficiency with both gasses open= 2.67375% . Efficiecy with Argon bottle only=1.84%. Anode drain current~87.5mA
Wednesday, November 14, 2018, 17:53: When opening the Neon valve, the vacuum reached ~1e-5 T and the test stand tripped. Ion source off, high voltage and some of the optics as well. Leaving the test stand as is.
Wednesday, November 14, 2018, 17:58: Note to myself: How am i gonna take an efficiency measurement if every time I turned the gas valves the vacuum will increase to 1e-5 T.
Thursday, November 15, 2018, 08:33: Sources at zero. Bring values to 0 before restarting. Reset optics.
Thursday, November 15, 2018, 08:45: Power to sources off. Open the back & double check gas bottles. All are tight.
Thursday, November 15, 2018, 09:35: All gas bottles opened.
Thursday, November 15, 2018, 09:58: Power/sources reset/on.
Thursday, November 15, 2018, 10:04: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened.
Thursday, November 15, 2018, 10:05: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Thursday, November 15, 2018, 10:07: Optics reset.
FM
Thursday, November 15, 2018, 18:46: Coil to 50 A.
Friday, November 16, 2018, 08:40: Emittance Rig reset & calibrated.
FM
Friday, November 16, 2018, 11:30 : Auto-ramping TBHT to 310 A @ 1A per min.
Friday, November 16, 2018, 16:28 Friday, November 16, 2018, 16:28 : Gain in FC0 seems off. Reading on FC0 was 2.8e-8A but reading on FC6 was 4.5e-8A. In the last mass scan, I add up the highest peaks above 1e-9A and the values was roughly 7e-8A. Switching the gain to 94uA in FCO shows 8.32e-8 A. This seems a better reading than before.
Friday, November 16, 2018, 16:30 Changing gacin on FC0 from 1 uA to 94 uA.
FM
Monday, November 19, 2018, 09:34 : Scanning from 0-450 V and recording Anode drain current.
IG1 reading is 3.01e-6 T.
Monday, November 19, 2018, 10:01 : When Moving away FC0, the optics goes yellow. Not sure which interlock is activated.
AS
Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.
Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times.
Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart.
Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.
Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.
Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted. |
694
|
Tuesday, November 06, 2018, 08:52 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51: Doors sealed.
Tuesday, November 06, 2018, 09:51: Turbo pumps on.
Thursday, November 08, 2018, 06:45: Ion gauge & Turbo pumps off.
Thursday, November 08, 2018, 08:36: Venting. |
693
|
Monday, October 29, 2018, 11:03 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Done | Test FEBIAD w/ Silver bolts & sealed end caps | Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Monday, October 29, 2018, 11:10: Power on
Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.
Monday, October 29, 2018, 11:20: RGA restarted.
Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.
Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 07:31: Optics set.
Tuesday, October 30, 2018, 07:32 : IV4 Opened.
Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.
Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.
Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.
Tuesday, October 30, 2018, 08:57: Power shut off & restarted.
Tuesday, October 30, 2018, 09:01: Gases re-opened.
Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.
Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.
Tuesday, October 30, 2018, 10:41: IV4 Opened.
Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given
Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.
Tuesday, October 30, 2018, 10:55: Optics reset.
Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.
Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 31, 2018, 07:00: Coil @ 50 A.
Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.
FM:
Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.
Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.
Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.
Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.
Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.
Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA
Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.
Voltage drop from 200 to 196 V. The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .
Voltage back to 200 V
FM
Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.
Anode set to 150 V. FC6 stable
Thursday, November 01, 2018, 11:37 Closing Neon Valve
Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.
Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!
Thursday, November 01, 2018, 13:08 : Opening the valves
Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.
Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve
Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%
Opening gas valves
FM
Friday, November 02, 2018, 09:39 : Increasing AV to 200V.
Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.
Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.
Leaving the cathode hot to continue test tomorrow morning.
Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.
Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.
Cooling down manually TBHT to 300 A @ 2A per min.
Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.
Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.
Monday, November 05, 2018, 14:22: Gas lines closed.
Monday, November 05, 2018, 14:32: Sources/power off.
Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.
Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off. |
692
|
Monday, October 29, 2018, 10:56 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Problems/Solutions | TS communications issues. | Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.
Monday, October 29, 2018, 09:00: PLC communications issues.
Rod N. was contacted this morning& the issues fixed by controls group. |
691
|
Monday, October 22, 2018, 11:07 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Monday, October 22, 2018, 11:07: Open gas lines slowly.
Monday, October 22, 2018, 11:11: Gas lines all opened. Vacuum @ 2.37e-06T & decreasing.
Tuesday, October 23, 2018, 08:00: MB1 PS on.
Tuesday, October 23, 2018, 08:03: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Tuesday, October 23, 2018, 08:08: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Tuesday, October 23, 2018, 08:10: Epics lost. Communication error. Internet loss.
Tuesday, October 23, 2018, 08:21: Auto ramp found halted in communication loss. Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min restarted from 14.0A.
Tuesday, October 23, 2018, 08:23: Anode @ 200 V.
Tuesday, October 23, 2018, 08:28: Optics set. IV4 opened.
Tuesday, October 23, 2018, 13:03: Auto-ramping TBHT / 320 A @ 2A per min.
Tuesday, October 23, 2018, 14:00: Coil @ 50 A. TBHT @ 330 A.
Tuesday, October 23, 2018, 14:30: Mass scans ok. TBHT back @ 320.
Emittance rig not calibrating?
Wednesday, October 24, 2018, 08:17 : E-rig drive motor PS re-plugged in. Switched on. E-rig calibrated & ready.
FM:
Wednesday, October 24, 2018, 12:40 : Vacuum 6.52e-7T. Auto-ramping TBHT to 320 A @ 2A per min.
Wednesday, October 24, 2018, 13:02 : Auto-ramping finished. Anode Current@8.54mA. Vaccum ok @ 6.86E-7T
Wednesday, October 24, 2018, 13:40 : Vacuum 6.58e-7T. Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 24, 2018, 13:55 : Auto-ramping finished. Anode Current@19.53mA. Vaccum ok @ 6.67E-7T
Wednesday, October 24, 2018, 15:18 : Vacuum 6.68e-7T. Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 24, 2018, 15:27: Auto-ramping finished. Anode Current@41.51mA. Vaccum ok @ 6.82E-7T
Thursday, October 25, 2018, 08:27: IG6 Tripped off around 3am this morning. Attempts to restart, unsuccessful.
Thursday, October 25, 2018, 08:29: IV4 Closed. Vacuum group notified..
Thursday, October 25, 2018, 08:40: Filament burnt out. Vac group switched on IG6 secondary filament.
Thursday, October 25, 2018, 08:44: IV4 re-opened. Optics reset.
Friday, October 26, 2018, 13:49: Auto-ramping TBHT / 360 A @ 1A per min.
Friday, October 26, 2018, 14:08:
TBHT @ 359.0 A / 3.074 V.
Anode @ 200 V / 94.017 - 95.238 mA.
Friday, October 26, 2018, 14:34: Mass & wire scans complete w/ screen shots on the word doc (FEBIAD COIL TEST 6-3 Caps in).
Sunday, October 28, 2018, 13:19: Remotely connect to check the status. Something happened around midnight. See attached screenshots.
It seems there is no bias. EPICS control whiteout. Not sure how to proceed. Leaving evreything as is. |
690
|
Monday, October 22, 2018, 07:18 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down.
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Monday, October 22, 2018, 07:42: Multiple attempts made to restart the PLC. Controls white out continues
Also attempted restart of the Vacuum. All 4 turbo pumps switch back to red on any restart attempt.
The turbo pumps had been manually switched off from the controllers to protect them once the power was switched back on.
Monday, October 22, 2018, 09:28: Turbo pumps restarted.
Monday, October 22, 2018, 11:01: All back except the magnet.
|
689
|
Monday, October 15, 2018, 14:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Anode / Cathode PS to Negative | Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.
PS: Negative |
688
|
Monday, October 15, 2018, 14:23 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Monday, October 15, 2018, 14:22: Gas-lines opened. Vacuum ok @ 4.38e-07T
Monday, October 15, 2018, 14:29: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.
Monday, October 15, 2018, 14:30: Optics on
Monday, October 15, 2018, 14:33: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Monday, October 15, 2018, 14:35: Anode @ 200 V.
Monday, October 15, 2018, 14:36: IV4 Open.
Tuesday, October 16, 2018, 06:33: Auto-ramping TBHT to 320 A @ 2A per min.
Tuesday, October 16, 2018, 07:15: Coil @ 50 A.
Tuesday, October 16, 2018, 14:40: FC6 Auto range & Polarity set. Mass scans work now.
FM
Wednesday, October 17, 2018, 10:02 : Auto-ramping TBHT to 330 A @ 2A per min.
Wednesday, October 17, 2018, 13:21: Auto-ramping TBHT to 340 A @ 2A per min.
Wednesday, October 17, 2018, 13:45: Increasing TBHT voltage from 3.001 to 3.5 to avoid voltage limitation when increasing the current
Wednesday, October 17, 2018, 13:48: Auto-ramping TBHT to 345 A @ 2A per min.
Wednesday, October 17, 2018, 13:54: FC0 start decreasing once the ramp up finished. Vacuum ok @ 5.17e-7T.
Wednesday, October 17, 2018, 17:16: FC0 stable. Probably outgassing. Vacuum ok @ 5.37e-T
Wednesday, October 17, 2018, 17:16: Auto-ramping TBHT to 350 A @ 2A per min.
Wednesday, October 17, 2018, 17:30: Ramping finished. FC0 decreasing again. Vacuum ok @5.57e-7T
Wednesday, October 17, 2018, 17:51: Potassium signal seems to be decreasing and now the Argon is slightly higher than Potassium.
Wednesday, October 17, 2018, 17:51: Mass optimized for 40Ar, which is shown in the mass scan as ~39.52. Dipole current=102.2736 A
Wednesday, October 17, 2018, 17:52: Starting steerers an einzel lense tuning to increase FC6 signal. Will continue tomorrow
FM
Thursday, October 18, 2018, 08:03: FC0 signal is stable now. Auto-ramping TBHT to 355 A @ 2A per min.
Thursday, October 18, 2018, 08:08 Ramping finished. Vacuum ok @5.26e-7T. Anode current=65 mA.
Thursday, October 18, 2018, 09:55: FC0 looks stable now. Manually tapping 2 A to have TBHT=357A.
Thursday, October 18, 2018, 11:40: Vaccum ok @ 4.56e-7T
Thursday, October 18, 2018, 16:25: Vacuum ok @ 5.28e-7T
Thursday, October 18, 2018, 16:26: Manually tapping 2 A to have TBHT=359A.
Thursday, October 18, 2018, 17:29: Steerers, einzel lens and dipole tune to increase signal on FC6. Argon current=4 nA. Total source current=54 nA.
Thursday, October 18, 2018, 17:37: Coil to 50A.
Thursday, October 18, 2018, 17:47: Closing Neon valve.
Thursday, October 18, 2018, 17:57: Closing Argon valve.
Thursday, October 18, 2018, 19:51: Assuming 720 nA entering the source (from Brad). Efficiency measurement = 0.44%
Thursday, October 18, 2018, 19:52: Opening valves.
Thursday, October 18, 2018, 19:54: Vaccum ok @ 5.46e-7T
FM
Friday, October 19, 2018, 08:27: Manually tapping 1 A to have TBHT=360.
Friday, October 19, 2018, 08:39: FC6 is stable. Closing Neon Valve.
Friday, October 19, 2018, 08:44: FC6 is stable. Closing Argon Valve.
Friday, October 19, 2018, 09:13: TBHT@360A, AV=150V. Efficiency measurement = 0.41%
Friday, October 19, 2018, 09:16: Opening the valves.
Friday, October 19, 2018, 09:40: FC6 stable. Carefully increasing AV (anode voltage) to 200V keeping an eye on the AC (anode current). |
687
|
Tuesday, October 02, 2018, 13:39 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps w/ stoppage | Silver bolts used on Coil, TGHT, & TBHT.
End caps in target
Tuesday, October 02, 2018, 13:36: Roughing.
Tuesday, October 02, 2018, 13:37: Doors sealed.
Tuesday, October 02, 2018, 14:10: Turbos on.
Due to potential power & cooling loss. Shutdown vac.
Wednesday, October 03, 2018, 07:34: Chamber Turbos off.
Wednesday, October 03, 2018, 10:58: Beam line Turbos off. Closed both PV1 & PV2 & turned off both roughing pumps.
Thursday, October 11, 2018, 10:37: RGA on. Strip tools re-opened.
Thursday, October 11, 2018, 10:43: Waterlines opened. No response on RGA. Vacuum stable @ 3.40e-07T.
Thursday, October 11, 2018, 10:48: Power on.
Thursday, October 11, 2018, 10:49: Opened manual valve in gas control to operate small pump. Vacuum spike into Xe-05T range.
Thursday, October 11, 2018, 10:51: Very gradual opening on source gas control. Pump ineffective.
Thursday, October 11, 2018, 10:52: SV5 not opened yet. Open SV2. Vacuum spike noted.
Thursday, October 11, 2018, 10:53: SV5 opened/closed very quickly. Allow stabilization. Alternate between SV5 & SV2 until stable.
Thursday, October 11, 2018, 10:58: SV5 closed. Open SV4. Vacuum spike noted up to 3.3e-05T.
Thursday, October 11, 2018, 11:30: All Gas lines opened.
Thursday, October 11, 2018, 11:36: Sources on.
Thursday, October 11, 2018, 11:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, October 11, 2018, 11:46: IV4 opened. Error / closed / red. Fix. IV4 re-opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
3.96 |
TBHT |
21.7 |
3.09 |
COIL + EE |
22.0 |
5.15 |
TGHT |
22.2 |
5.83 |
Thursday, October 11, 2018, 12:08: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, October 12, 2018, 08:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, October 12, 2018, 08:13: Optics reset.Can Diagnostics re-cfg.
Friday, October 12, 2018, 10:49: Anode @ 200 V.
Friday, October 12, 2018, 10:50: Coil @ 10 A. Vacuum @ 6.25e-07T
Friday, October 12, 2018, 10:53: Coil @ 20 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:56: Coil @ 30 A. Vacuum @ 6.27e-07T
Friday, October 12, 2018, 10:58: Coil @ 40 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:00: Coil @ 50 A. Vacuum @ 6.34e-07T
Friday, October 12, 2018, 11:01: Auto-ramping TBHT to 300 A @ 2A per min.
Friday, October 12, 2018, 11:06: TBHT @ 300 A.
Friday, October 12, 2018, 11:51: Nothing found on Mass or wire scans?
Friday, October 12, 2018, 11:52: Anode set to 0 V.
Friday, October 12, 2018, 11:54: Still nothing found on wire scans.
Fernando:
Friday, October 12, 2018, 12:56: Anode leakage current is 6.105 mA on the readback with AV@200V Coil@0A TGHT@580A TBHT@310
Friday, October 12, 2018, 12:59 : This is very low anode lakage current. It should be on the bulk of 100 mA.
Friday, October 12, 2018, 12:59: Ramping up TBHT to 320 A @ 2A per min while keeping the AV@200 V. STOP
Aaron: Anode / Cathode BIAS PS polarity requires a reversal. John Chow notified. To be reversed Monday after 11am.
Friday, October 12, 2018, 13:24: Continue auto-ramping TBHT to 320 A @ 2A per min.
Friday, October 12, 2018, 13:30: TBHT 320 A / Read back @ 313.1 A.
Friday, October 12, 2018, 13:34: Wire & mass scans
Friday, October 12, 2018, 13:54: Anode to 0 V. Coil to 50 A.
Monday, October 15, 2018, 07:14: Auto-cooling. Coil to 0 A.
Monday, October 15, 2018, 11:54: Sources/power off. IV4 closed |
686
|
Friday, September 21, 2018, 11:41 |
Aaron Schmidt | UC#26 | LP-IG-LIS | ITE | TM4 | | 42132-1 | In progress | Conditioning Heat Shield for UC#26 | Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41: Doors sealed for roughing.
Friday, September 21, 2018, 14:02: Turbos on.
Monday, September 24, 2018, 08:05: Waterlines opened. No response on RGA. Vacuum ok @ 4.23-e07T
Monday, September 24, 2018, 08:12: Power / sources on.
Monday, September 24, 2018, 08:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.3 |
3.92 |
TBHT |
24.2 |
3.11 |
COIL + EE |
24.1 |
5.15 |
TGHT |
24.3 |
5.80 |
Monday, September 24, 2018, 13:45: Vacuum ok @ 6.47e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
24.9 |
3.11 |
COIL + EE |
24.7 |
5.18 |
TGHT |
27.0 |
5.83 |
Friday, September 28, 2018, 09:59: Auto-cooling @ 2A per min.
Tuesday, October 02, 2018, 08:32: Power / Sources off.
Tuesday, October 02, 2018, 08:37: Purge waterlines & empty DI bucket.
Tuesday, October 02, 2018, 08:38: RGA off. Ion gauge, turbo pumps off. |
685
|
Monday, September 17, 2018, 11:52 |
Aaron Schmidt | UC#25 | LP-SIS | ITW | TM2 | | 42752-9 | In progress | Conditioning Heat Shield for UC#25 | Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Monday, September 17, 2018, 14:09: RGA on.
Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.
Tuesday, September 18, 2018, 09:02: Power on
Tuesday, September 18, 2018, 09:05: Sources on.
Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
4.02 |
TBHT |
24.4 |
3.11 |
COIL + EE |
24.6 |
5.15 |
TGHT |
24.6 |
5.79 |
Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
4.02 |
TBHT |
24.7 |
3.10 |
COIL + EE |
24.9 |
5.13 |
TGHT |
26.8 |
5.77 |
Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.
Friday, September 21, 2018, 07:52: Power / Sources off.
Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.
Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.
|
|