Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 16 of 53  Not logged in ELOG logo
  ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  32   Wednesday, February 08, 2012, 18:16 Friedhelm Ames      FailedTSG:TP1B and TSG:TP1A failure


   
        
            
  
  33   Thursday, February 16, 2012, 15:59 Anders Mjos      Problems/SolutionsHe and Ne installed and gas lines leak checkedNew supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed.
  
  34   Friday, February 17, 2012, 10:27 Aurelia Laxdal      DoneStarted the ArchiversStarted both ISACT and SOURCES Archivers.   
  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped upramping up target to 300 A and tube to
270 A
  
  36   Tuesday, February 28, 2012, 10:29 Pierre Bricault LP-FEBIAD    In progressTest FEBIAD at ISAC test statnd    
  37   Tuesday, February 28, 2012, 11:04 Pierre Bricault         Calibrating the gas valve   
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test StandISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning. 
Tune saved as: data/febiaddata/tune/120228-1620_0.snap
 grab.V13332.pnggrab.m13336.png 
  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD    
  42   Wednesday, February 29, 2012, 15:08 Friedhelm Ames       connected Al(CH3)3connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response
  
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt


 grab.BI5978.png 
  44   Wednesday, February 29, 2012, 17:26 Friedhelm Ames       gas inlet valves closed    
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    
  51   Monday, March 05, 2012, 14:41 Friedhelm Ames       vacuum and optics switched offvacuum and optics at teststand switched
off to allow work on the water cooling system.
  
  52   Monday, March 05, 2012, 19:31 Friedhelm Ames      Failedturbo pumps failedBoth turbo pumps at the source box cannot
be started. A fault report has been issued.
  
  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replacedVac group has replaced the two turbo pumps.   
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test standStart turbo pumps at 1514H   
  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test standTurbos at full speed. P = 1.5E-05 T   
ELOG V2.9.2-2455