764
|
Friday, October 25, 2019, 12:04 |
Anders Mjos | | | | | | | Problems/Solutions | ISG:TP1A found stopped | Restarted TP. Note that CG1A is above 50
mTorr. CG1B shows 15 mTorr |
|
763
|
Wednesday, October 23, 2019, 09:51 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak in Magnet PS | Wednesday, October 23, 2019, 09:50:
Fault: 12797
WP: C2019-10-23-2 |
|
762
|
Friday, October 18, 2019, 15:01 |
Aaron Schmidt | SiC#38 | HP-FEBIAD | ITE | TM2 | 42464-4 | 42752-1 | In progress | Conditioning SiC#38 HP-FEBIAD | Friday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30:
Turbo pumps on. |
12x |
761
|
Wednesday, October 02, 2019, 13:42 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Conditioning UC#(30) HS | Wednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started. |
|
760
|
Friday, September 27, 2019, 11:54 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-6 | | Conditioning UC#(29) HS | Using broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing. |
|
759
|
Thursday, September 26, 2019, 11:30 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace CANBUS board TSG:CB1 | Thursday, September 26, 2019, 11:28: The
control board to TSG:CB1 was removed and
replaced. |
|
758
|
Monday, September 23, 2019, 13:30 |
Aaron Schmidt | Ta#59 | LP-SIS | ITE | TM2 | 44062-5 | 42752-10 | In progress | Conditioning Ta#59 Assy | Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open |
9x |
757
|
Monday, September 16, 2019, 10:05 |
Fernando Maldonado | | | | | | | Problems/Solutions | Alignment pin reinstalled | Monday, September 16, 2019, 10:03:
The rightmost alignment pin has been reinstalled
(see picture attached). It was previously |
|
756
|
Thursday, August 29, 2019, 14:47 |
Fernando Maldonado | | | | | | Ferran's heat shield | Problems/Solutions | Rewiring-Baking out | Thursday, August 29, 2019, 14:47 : Changing
back to the nominal wiring
Thursday, August 29, 2019, 17:01: |
|
755
|
Thursday, August 15, 2019, 16:33 |
Fernando Maldonado | | | | | | | Problems/Solutions | 9-pin connection modification | Thursday, August 15, 2019, 16:17: Q FT
undone to remove the connection to the 9-pin
The idea is to change the cables |
|
754
|
Tuesday, August 13, 2019, 12:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Replace RP1 | Tuesday, August 13, 2019, 11:55: Close
PV1. Turn off RP1.
Tuesday, August 13, 2019, 12:02: |
|
753
|
Thursday, August 08, 2019, 09:12 |
Aaron Schmidt | | LP-FEBIAD | | | | 42752-7 | In progress | P2N Setup - LP-FEBIAD target | Inserted a used (heating) LP-FEBIAD target
with a basic heat shield assembly with no
end plate foil on the window side to observe |
8x |
752
|
Wednesday, August 07, 2019, 15:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Test stand inspection | Wednesday, August 07, 2019, 15:12:
Arthur helped inspected the electric connections
on the TS. |
|
751
|
Wednesday, August 07, 2019, 08:18 |
Luca Egoriti | P2N - 1 | | ITE | TM2 | | | Problems/Solutions | p2n heating test 4 | Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
|
|
750
|
Friday, August 02, 2019, 13:16 |
Aaron Schmidt | P2N - 1 | | | | | | In progress | p2n heating test 4 | Friday, August 02, 2019: p2n target installed
in the test stand, the ion source was fully
removed to avoid any risk of shorting. The |
|
749
|
Tuesday, July 30, 2019, 12:19 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | | | Problems/Solutions | p2n heating test - target inspection | The p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below: |
|
748
|
Sunday, July 28, 2019, 14:22 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | p2n - test1 | p2n - test1 | Problems/Solutions | p2n heating test 3 | Friday. July 26th 2019
A new electrical configuration of
the test stand was decided and installed. |
|
747
|
Friday, July 19, 2019, 13:48 |
Fernando Maldonado | | | | | | | Problems/Solutions | RMP0A and FC6 gains signal redirection to another channel | After submitting a fault report (FR - ISAC
Fault 12461) a Work Permit was issued (WP
- C2019-07-19-1), |
|
746
|
Tuesday, July 16, 2019, 10:28 |
Fernando Maldonado | P2N | | | | | | | P2N 1200 A test | Tuesday, July 16, 2019, 10:27: The idea
of this run is to have the full 600 A from
TGHT and the full 600 A from TBHT. |
|
745
|
Monday, July 15, 2019, 15:59 |
Fernando Maldonado | P2N | | | | | | Done | Re-wiring on service cap. | Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.