  704   Wednesday, January 09, 2019, 09:10 Aaron Schmidt       Cathode to Anode. PS to PositiveWednesday, January 09, 2019, 09:09: Upper
HV cage set to Anode / Positive as per dwg
ISK4523D Rev 6.
  
  703   Tuesday, January 08, 2019, 08:11 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS restart Tuesday, January 08, 2019, 08:00: Epics
white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10:
  
  702   Thursday, December 20, 2018, 13:55 Aaron Schmidt LP-FEBIAD  395530-342752-5 Holiday shut down.High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power.
  
  701   Monday, December 17, 2018, 12:03 Aaron Schmidt LP-FEBIAD  395530-342752-5 Anode leak current check.Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed.
  
  700   Wednesday, December 12, 2018, 13:22 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressAnode leak current check.Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20:
  
  699   Thursday, December 06, 2018, 11:02 Aaron Schmidt      Problems/SolutionsFC0 Bellows Replacement.Thursday, December 06, 2018, 11:02: Turbo
pumps (TP6 & TP2) off on beamline side.
IG6 off.
 20181206_Old_Bellows.jpg20181210_112528.jpg20181210_115310.jpg20181211_New_Bellows_installed.jpg 
  698   Wednesday, December 05, 2018, 10:22 Aaron Schmidt      Problems/SolutionsRGA Filament & Ionizer replacementRGA Ionizer & Filament replaced as
per SRS RGA manual.
The ionizer was found to be dirty
 12x 
  697   Monday, November 19, 2018, 14:22 Aaron Schmidt      Problems/SolutionsVacuum issues.





Normal
0
  
  696   Thursday, November 08, 2018, 14:13 Aaron Schmidt       Ar & Ne gas bottle replacement.Thursday, November 08, 2018, 14:05: Fresh
/ recently calibrated Neon & Argon bottles
installed.
 GasLeak_Datasheet.pdf 
  695   Thursday, November 08, 2018, 10:54 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTest FEBIAD w/ Silver bolts & sealed end capsSilver bolts used on Coil, TGHT, &
TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52:
  
  694   Tuesday, November 06, 2018, 08:52 Aaron Schmidt      In progressPump down empty chamberTuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51:
Doors sealed.
  
  693   Monday, October 29, 2018, 11:03 Aaron Schmidt LP-FEBIAD  41790-942752-5DoneTest FEBIAD w/ Silver bolts & sealed end capsRestarting FEBIAD
Monday, October 29, 2018, 10:56:
Restart roughing & Turbo pumps.
  
  692   Monday, October 29, 2018, 10:56 Aaron Schmidt LP-FEBIAD  41790-942752-5Problems/SolutionsTS communications issues.Sometime around 00:30 Sunday, October 28,
2018, the ISAC test stand lost communication
to the PLC and shut down abruptly.
  
  691   Monday, October 22, 2018, 11:07 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55:
 epics-plot-whiteout-181028_1322.PNGepics-whiteout-181028_1322.PNGFEBIAD_COIL_Test_6-3_Caps_in.docxTS-2018-10-22-09-47.rga 
  690   Monday, October 22, 2018, 07:18 Aaron Schmidt       TS restart after power outageFriday, October 19, 2018, 10:00 (Approx):
Site wide power outage. TS completely shut
down. 
  
  689   Monday, October 15, 2018, 14:38 Aaron Schmidt      Problems/SolutionsAnode / Cathode PS to NegativeMonday, October 15, 2018, 13:00-14:00 Anode
/ Cathode BIAS PS polarity reversed by John
Chow.
  
  688   Monday, October 15, 2018, 14:23 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps Anode / Cathode BIAS PS polarity reversed
by John Chow. PS: Negative
Monday, October 15, 2018, 14:12:
 FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docxTS-2018-10-15-14-15.rga 
  687   Tuesday, October 02, 2018, 13:39 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps w/ stoppageSilver bolts used on Coil, TGHT, &
TBHT.
End caps in target
 FEBIAD_Coil_Test_6_-_POS_Cathode.docxTS-2018-10-11-10-37.rga 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51:
 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx 