Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 25 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  564   Wednesday, January 25, 2017, 09:48 Aaron Schmidt    41882-441751-6DoneOut gas Heat Shield for Target cleaning testNo EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in
 7x 
  563   Tuesday, January 24, 2017, 14:14 Aaron Schmidt       Calibrated leak tanks removedTuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their
  
  562   Monday, January 23, 2017, 15:30 Aaron Schmidt       Pump down empty chamber.Monday, January 23, 2017, 15:30: Roughing

Wednesday, January 25, 2017,
09:05: Venting
  
  561   Friday, January 20, 2017, 08:45 Aaron Schmidt      Problems/SolutionsTSG:TP1A & TSG:BV1A trippedFriday, January 20, 2017, 08:25: TSG :
TP1A and TSG : BV1A were noticed to be tripped
around 6am.
  
  560   Thursday, January 19, 2017, 13:23 Anders Mjos      Problems/SolutionsTSH:UHV1 remvoed


   
        
            
  
  559   Wednesday, January 18, 2017, 09:23 Aaron SchmidtTa TestLP-FEBIAD  39530-3 In progressTri-Coil FEBIAD for testingWednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41:
Turbo pumps started.
 12x 
  558   Tuesday, January 03, 2017, 08:27 Aaron Schmidt       Pump down empty chamber. (Restart. Post holidays)Tuesday, January 03, 2017, 08:26: TSG :
RP1 & TMS : RP2 restarted.

Wednesday, January 04, 2017,
  
  557   Wednesday, November 30, 2016, 10:16 Aaron Schmidt       Pump down empty chamber. (Close off for holidays)Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05:
Turbo pumps on.
  
  556   Wednesday, November 30, 2016, 07:25 Aaron Schmidt       Camera Container test 3.Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35:
Roughing.
 Camera_Case_Test_3.docxTS-2016-11-30-09-00_Test_3.rga 
  555   Tuesday, November 29, 2016, 11:20 Anders Mjos      Problems/SolutionsTSH:UHV1 remvoedThe variable leak rate valve will be used
for TM3 HV spark tests in TCS
  
  554   Monday, November 28, 2016, 15:39 Aaron Schmidt      In progressPump down empty chamber/Check ExhaustMonday, November 28, 2016, 15:35: Begin
roughing. Monitor exhaust mesh cover. 
*Cover was found on the ground earlier
  
  553   Friday, November 25, 2016, 14:28 Anders Mjos       Camera Container test 2Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47:
Turbos started
 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga 
  552   Thursday, November 24, 2016, 10:39 Aaron Schmidt      Problems/SolutionsTMS:TP2 Thursday, November 24, 2016, 08:05: Whining
sound (high pitch) heard from TMS:TP2
Thursday, November 24, 2016, 10:37:
  
  551   Thursday, November 24, 2016, 10:36 Aaron Schmidt       Camera Container test 1.Thursday, November 24, 2016, 10:15: Discuss
w/ Aurelia. Camera container filled with
Argon. Place under Vacuum, monitor w/ RGA.
 Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga 
  550   Wednesday, November 16, 2016, 10:50 Aaron Schmidt       Pump down empty chamber.Wednesday, November 16, 2016, 10:50: Begin
roughing.
Wednesday, November 16, 2016, 11:52:
  
  549   Thursday, October 27, 2016, 13:37 Aaron SchmidtUC#18LP-SISITWTM2 41751-3In progressConditioning Heat shield for UC#18Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started.
 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga 
  548   Monday, October 24, 2016, 16:02 Aaron Schmidt      Problems/SolutionsPump down empty chamber/Clean Exhaust/TestMonday, October 24, 2016, 15:45: Remove
metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8"
 Exhaust_pump_down.docx 
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  546   Friday, October 14, 2016, 13:17 Anders Mjos      Problems/SolutionsPowerbump tripped off turbosFriday, October 14, 2016, 13:17: Restarted
pumps
Friday, October 14, 2016, 13:4: Another
  
  545   Tuesday, October 11, 2016, 14:55 Anders Mjos      In progressEmptyBreaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55:
  
ELOG V2.9.2-2455