  Test-Stand, Page 33 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  408   Friday, October 31, 2014, 14:57 Anders Mjos LP-FEBIAD  Tube only38307-9In progressTestFriday, October 31, 2014, 14:47: Starting
turbos
Friday, October 31, 2014, 14:57:
 test20141103.pngtest20141103-2.png 
  407   Monday, October 27, 2014, 09:26 Anders Mjos      Problems/SolutionsTSG:TP1B noisye-fault 7748
Monday, October 27, 2014, 09:21:
Switched off turbos
  
  406   Monday, October 20, 2014, 09:17 Anders Mjos      Problems/SolutionsPower bump this weekend tripped off all turbo pumps Monday, October 20, 2014, 09:17:
Roughing
Monday, October 20, 2014, 09:18 :
  
  405   Tuesday, October 07, 2014, 09:32 Anders Mjos      In progressPumping down empty chamberTuesday, October 07, 2014, 09:30: Roughing
Tuesday, October 07, 2014, 10:24:
Starting turbos
  
  404   Thursday, September 25, 2014, 15:44 Anders MjosThO#1 ITWTM140282-5 DoneThO#1 Heat Shield ConditioningThursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos
  
  403   Monday, September 08, 2014, 16:23 Anders MjosUC#11  TM440282-5 DoneUC#11 Heat Shield ConditioningT/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
 Thermocouples.xlsx 
  402   Friday, August 29, 2014, 14:52 Anders MjosTa#44HP-SISITETM438817-940316-11DoneConditioning Ta#44Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting
turbos.
  
  401   Wednesday, August 27, 2014, 12:55 Anders Mjos      Problems/SolutionsWater leak on MB1e-faulted
by operations Aug 26th
  
  400   Wednesday, August 20, 2014, 16:25 Anders Mjos      Problems/SolutionsLost power on TGHT, TBHT and EE simultaniously Possible controls problem. Breaker 18 found
latched. Can not be re-energized. Burnt smell
in PLC / HV area. e-faut 7561
  
  399   Thursday, August 14, 2014, 08:45 Anders Mjos      Problems/SolutionsFC0 reading full currentsince yesterday around 19h. See attached
screen shot of archived data
Thursday, August 14, 2014, 08:40:
 FC0FullScaleReading_2014-08-14.pngFC0FullScaleReading_EPICS_2014-08-14.png 
  398   Tuesday, August 12, 2014, 09:52 Anders Mjos      Problems/SolutionsRTD installed on Supply waterTravis assisted in installing a temperature
reading RTD from Omega (SA1-RTD-MTP) on the
water supply. The RTD has been installed
 2014-08-12_Dataq_Screen_Shot.pngDataq_Supply_Temperature_calibration_2014-08-20.docx 
  397   Friday, August 08, 2014, 12:45 Anders MjosZrC#6LP-SISITWTM140282-339230-5DoneCondictioning ZrC#6Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting 
  
  396   Friday, August 01, 2014, 08:39 Anders Mjos      Problems/SolutionsTMS:RP2 noisyFriday, August 01, 2014, 08:39: Backing
pressure 0 / 11 mT
  
  395   Wednesday, July 23, 2014, 14:34 Anders Mjos      In progressEmpty chamberWednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting
turbos.
  
  394   Friday, July 18, 2014, 11:30 Anders MjosUC#10LP-SISITETM440282-540316-1DoneUC#10 Heat Shield ConditioningFriday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos
  
  393   Friday, July 18, 2014, 08:19 Anders Mjos       VentingFriday, July 18, 2014, 08:19: Stopped turbos
Friday, July 18, 2014, 10:58: Venting
  
  392   Wednesday, July 09, 2014, 14:08 Anders Mjos      Problems/SolutionsFEBIAD ANODE current readbackThe read back of the ANODE current was
confirmed to be working today with help of
Ray D. using a 1kOhm resistor. There is an
  
  391   Tuesday, July 08, 2014, 09:05 Anders Mjos      In progressEmpty chamberTuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting
turbos
  
  390   Thursday, June 26, 2014, 16:32 Anders MjosTa#43LP-SISITWTM140282-239230-6In progressConditioning Ta#43Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting
turbos. 
 Ta#43_Conditioning.docx 
  389   Friday, June 20, 2014, 11:44 Anders Mjos      In progressPumping down empty chamberFriday, June 20, 2014, 11:44: Roughing
Friday, June 20, 2014, 13:00: Strarting
turbos 
  