2
|
Wednesday, September 14, 2011, 15:33 |
John Wong | Test#1 | HP-SIS | ITW | TM1 | test | test | In progress | testing elog for test stand | Wednesday, September 14, 2011, 15:33
blah blah blah... |
|
748
|
Sunday, July 28, 2019, 14:22 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | p2n - test1 | p2n - test1 | Problems/Solutions | p2n heating test 3 | Friday. July 26th 2019
A new electrical configuration of
the test stand was decided and installed. |
|
106
|
Tuesday, June 26, 2012, 18:04 |
Anders Mjos | FEBIAD anode end cap test | | | | Tube only | 38307-9 | In progress | FEBIAD anode end cap test - ready | Testing FEBIAD anode end cap as per dwg
ITD0304 REV C
Target with TUBE ONLY. Do not use |
|
323
|
Friday, July 19, 2013, 14:14 |
Anders Mjos | | | | | Tube only | 38307-9 | In progress | FEBIAD Coil Test | Friday, July 19, 2013, 14:14 : Stopping
Turbos. Vacuum at 1.3E-7 T
Friday, July 19, 2013, 15:14: |
|
325
|
Tuesday, August 20, 2013, 08:24 |
Anders Mjos | | | | | Tube only | 38307-9 | In progress | FEBIAD Coil Test | Tuesday, August 20, 2013, 08:13: Roughing
gas lines
Tuesday, August 20, 2013, 08:22: |
|
336
|
Wednesday, September 18, 2013, 16:18 |
Anders Mjos | | HP-FEBIAD | | | Tube only | 38307-9 | Done | Test Target - FEBIAD COIL | Wednesday, September 18, 2013, 16:18: Starting
turbos
Wednesday, September 18, 2013, 16:26 |
|
408
|
Friday, October 31, 2014, 14:57 |
Anders Mjos | | LP-FEBIAD | | | Tube only | 38307-9 | In progress | Test | Friday, October 31, 2014, 14:47: Starting
turbos
Friday, October 31, 2014, 14:57: |
|
413
|
Friday, December 12, 2014, 14:09 |
Anders Mjos | | LP-FEBIAD | | | Tube only | | In progress | HV BIAS Test | BIAS current limit pot changed from 2.40
to 0.25
EZL current limit pot changed from |
|
296
|
Thursday, April 25, 2013, 13:32 |
Anders Mjos | Empty | LP-FEBIAD | | | Tube Only | 38307-9 | In progress | FEBIAD Coil test | Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54:
Roughing |
|
738
|
Wednesday, June 26, 2019, 11:34 |
Aaron Schmidt | Test Ta | HP-SIS | | TM4 | No Target oven # | 42972-4 | In progress | Test target for TM4 checks | The HP-SIS uses the older center block.
No serial number found.
Loaded with Tantalum. Rough Target |
|
157
|
Friday, August 10, 2012, 12:44 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | FEBIAD test | Rick put the helium bottle back in the
rack.
Waiting for status of the gas lines. |
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
162
|
Saturday, August 11, 2012, 13:34 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | Test FEBIAD anode bias 120 V | |
|
156
|
Friday, August 10, 2012, 11:29 |
Pierre Bricault | NA | | | | N A | NA | In progress | Test FEBIAD | The helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out |
|
978
|
Friday, August 25, 2023, 17:21 |
Aaron Schmidt | Nb#11 | LP-IG-LIS | ITW | TM2 | 45447-9 | 42132-4 | In progress | Conditioning Nb#11 | Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum |
|
971
|
Thursday, July 06, 2023, 16:55 |
Aaron Schmidt | Nb#10 | LP-IG-LIS | ITW | TM2 | 45447-7 | 42132-2 | In progress | Conditioning Nb#10 | Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on. |
|
1007
|
Friday, April 26, 2024, 13:49 |
Aaron Schmidt | TiC#7 | HP-FEBIAD | ITW | TM4 | 45447-5 | 45235-15 | In progress | Conditioning TiC#7 | FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B |
|
996
|
Friday, February 16, 2024, 10:30 |
Aaron Schmidt | SiC# (Stock) | HP-FEBIAD | | | 45447-4 | 45235-21 | In progress | Conditioning stock SiC HP FEBIAD | Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38:
TP1B on. |
|
1011
|
Wednesday, June 19, 2024, 15:50 |
Brady Borrmann | TiC#9 | HP-SIS | | | 45447-29 | 45235-19 | In progress | Conditioning TiC#9 | Wednesday, June19, 2024, Spare TiC HP-SIS
target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing |
|
1021
|
Tuesday, September 10, 2024, 16:24 |
Dave Neilson | TiC #24D | HP-SIS | ITW | TM3 | 45447-27 | 45235-25 | | Back up target testing and conditioning | Tuesday, September 10, 2024, 16:21:
Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21: |
|
|