ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
73
|
Tuesday, May 16, 2017, 13:18 |
Laura Lambert | UCx#20 | LP-IG-LIS | ITE | TM4 | 42218-1 | | Ready | UCx#20 Target Description | Tuesday, May 16, 2017, 13:13
Attached please find |
|
88
|
Thursday, November 29, 2018, 14:23 |
Marla Cervantes | UCx#26 | LP-IG-LIS | | | 42281-3 | | Ready | UCx#26 Target description | Thursday, November 29, 2018, 14:20
Attached please find |
|
112
|
Wednesday, September 29, 2021, 10:37 |
Darwin Ortiz Rosales | UCx#35 | LP-IG-LIS | | | 42218-5 | | Ready | UCx#35-Target_description |
|
|
120
|
Tuesday, August 09, 2022, 11:02 |
Darwin Ortiz Rosales | UCx#39 | LP-IG-LIS | | | 42218-4 | | Ready | UCx#39_Target_Description | |
|
132
|
Friday, June 23, 2023, 09:02 |
Aaron Schmidt | Nb#10 | LP-IG-LIS | ITW | TM2 | 45447-7 | | | Nb#10 target description. | Nb#10 LP-IG-LIS target
description: |
|
135
|
Thursday, August 24, 2023, 14:16 |
Aaron Schmidt | Nb#11 | LP-IG-LIS | ITW | TM2 | 45447-9 | | In progress | Nb#11 Target description | Nb#11 LP-IG-LIS target description:
|
|
148
|
Tuesday, November 12, 2024, 12:49 |
Darwin Ortiz Rosales | UCx#46 | LP-IG-LIS | | | 42218-2 | | Ready | UCx#46_Description | |
|
83
|
Friday, July 13, 2018, 14:41 |
John Wong | UCx#23 | LP-FEBIAD-CTL | | | | | Ready | UCx#23 target description | Friday, July 13, 2018, 14:40
Target is ready for installation.
See attachment for description |
|
20
|
Monday, February 20, 2012, 16:39 |
John Wong | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | | Spent | target ready for assembly | Monday, February 20, 2012, 16:25
Mass of empty target oven used =
461.55g |
|
24
|
Wednesday, July 04, 2012, 11:32 |
Anders Mjos | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | 39069-3 | Spent | target assembled |
|
|
26
|
Wednesday, August 01, 2012, 09:37 |
Pierre Bricault | ITE-TM4-UO#3 | LP-FEBIAD | ITE | TM4 | | | Problems/Solutions | Short has developed while lowering the cathode heater | On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the |
|
129
|
Monday, May 01, 2023, 14:59 |
Darwin Ortiz Rosales | TiC #5 | LP-FEBIAD | | | 44692-5 | | Ready | Target TiC #5 Description | |
|
138
|
Tuesday, October 24, 2023, 11:30 |
Darwin Ortiz Rosales | UCx#44 | LP-FEBIAD | | | 41790-7 | | Ready | UCx#44_Description | Three Ta heatshields left installed on
container. |
|
3
|
Tuesday, March 29, 2011, 14:14 |
John Wong | Ta#35 | HP-SIS | ITE | TM4 | 38481-3 | 38303-4 | Spent | ITE-TM4-Ta#35-Hp-SIS | ITE-TM4-Ta#35-Hp-SIS
Thu Apr 7 15:32:32 2011:
Target oven - w.o#38481-3. |
|
4
|
Thursday, March 31, 2011, 15:38 |
John Wong | SiC#25 | HP-SIS | ITE | TM4 | 38481-1 | 38307-? | Spent | ITE-TM4-SiC#25-Hp-SIS | Thu Mar 31 15:19:51 2011: SiC#25
was made sometime in December of 2010.
It is now in the target module and ready |
|
8
|
Thursday, June 16, 2011, 17:26 |
John Wong | Nb | HP-SIS | | | 38817-1 | | Spent | Target is ready and stored in cabinet | Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete
and ready to be installed in the heat shields: |
|
10
|
Wednesday, July 06, 2011, 14:13 |
John Wong | Ta#40 | HP-SIS | | | 38295-4 | | Spent | Target description | Details about Ta Hp surface, w.o#38295-4
(spare):
This target was built as a spare. |
|
11
|
Wednesday, July 06, 2011, 14:29 |
John Wong | Nb/Spare | HP-SIS | | | 38817-2 | | In progress | Target ready for Assembly | Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right
= 18.16mm. |
|
21
|
Thursday, May 24, 2012, 11:04 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | 39069-2 | Spent | HP-SIS SiC27 target description | Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description:
Total SiC foils = 240 discs |
|
37
|
Friday, October 25, 2013, 17:35 |
John Wong | Ta#41 | HP-SIS | ITW | TM4 | 38817-10 | | Spent | Ta#41 target description | Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400 |
|