Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  87   Monday, October 15, 2018, 07:36 Aaron SchmidtTa#57 ITETM441177-3  Ta#57 Target Description.(Laura Lambert: Evap 2 Elog ID: 404) Tuesday,
April 17, 2018, 10:20
  
  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues While removing the SiC#42 it became
apparent that the multipin guide pin had
become loose again and was not allowing the
  
  125   Wednesday, December 14, 2022, 10:28 Darwin Ortiz RosalesC#5   44691-13 ReadyTarget C#5 DescriptionGraphite target  C#5_Description.png 
  126   Monday, February 06, 2023, 10:02 Darwin Ortiz RosalesC#6   45220-6 ReadyTarget C#6 Description   C#6_Description.png 
  128   Friday, March 10, 2023, 07:21 Aaron Schmidt      ReadyTarget Material Batch - Ta Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"
 Ta_2023_-_01.pdf 
ELOG V2.9.2-2455