Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 8  Not logged in ELOG logo
Entry  Monday, February 20, 2012, 16:39, John Wong, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, , Spent, target ready for assembly 
 Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 
    Reply  Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled UO2#3_Anode_End_Cap.xlsx


    
        
            John Wong wrote:
        
        
            
             Monday, February 20, 2012, 16:25
Entry  Monday, September 17, 2018, 11:39, John Wong, np-SiC#1, LP-SIS, , , 43044-1, , Ready, nano-SiC#1 Target description target_description.JPG
Monday, September 17, 2018, 11:32
See attachment for the target description.
Some notes about the target conditioning in Evap#2 (see elog ID#414):
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
 Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 03, 2015, 10:53
Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx
Tuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) 
Entry  Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description  ZrC#6.JPG
 Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description. 
Target is currently undergoing the sintering process
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Monday, October 21, 2019, 12:38, Darwin Ortiz Rosales, UCx#29, LP-SIS, , , 44062-6 , , Ready, UCx29-target_description UCx#29.PNG
 
Entry  Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description  UCx#9_target_description_1.JPG
 Friday, June 06, 2014, 14:08
See attachment for the target description

 
Entry  Wednesday, November 27, 2013, 17:56, John Wong, UCx#8, LP-IG-LIS, ITE, TM4, 39814-IV, , Spent, UCx#8 target description  UCx_8_specification.PNG
Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1

 
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG
 Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1. 
The target is currently undergoing the final conditioning in the Evaporator#1.
Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. 
Entry  Thursday, January 02, 2025, 12:54, Darwin Ortiz Rosales, UCx#47, LP-SIS, , , 45447-12, , Ready, UCx#47_Description UCx#47_Description.png
 
Entry  Tuesday, November 12, 2024, 12:49, Darwin Ortiz Rosales, UCx#46, LP-IG-LIS, , , 42218-2, , Ready, UCx#46_Description UCx#46_Description.png
 
Entry  Wednesday, May 22, 2024, 22:32, Darwin Ortiz Rosales, UCx#45, LP-SIS, , , 45220-9, , Ready, UCx#45_Description UCx#45_Description.png
 
Entry  Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description UCx#44_Description.png
Three Ta heatshields left installed on container.
Entry  Wednesday, July 26, 2023, 12:03, Darwin Ortiz Rosales, UCx#43, LP-SIS, , , 45447-11, , Ready, UCx#43_Description UCx#43_Description.png
 
Entry  Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description UCx#42_Description.png
 
ELOG V2.9.2-2455