  Target Production, Page 1 of 8  Not logged in ELOG logo
Entry  Friday, June 03, 2011, 09:16, John Wong, Ta#37, LP-SIS, ITW, TM1, 38634-5, 36833-7, Spent, Target is done EE.JPGEE-CuO.jpg
 Fri Jun  3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), 4.0 cm in length.  Total mass + Ta wire = 42.32g.  The heat shield was assembled and tested, and the
Entry  Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished. broke_screwhead.jpgUCx#2.jpg
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Entry  Wednesday, November 16, 2011, 14:08, John Wong, UCx#3, LP-SIS, ITW, TM1, 38634-10, 36833-3, Spent, UCx#3 ready to go online UCx#3_assembly.jpg
 Wednesday, November 16, 2011, 13:51
UCx#3 descriptions: 
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1)
Entry  Monday, February 13, 2012, 16:00, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 ready in the Conditioning Station 
 

Monday, February 13, 2012, 16:00 
Nb#5 target description:
Entry  Friday, June 01, 2012, 11:43, John Wong, Ta#38, LP-SIS, ITW, TM1, 39165-2, 38633-2, Spent, Ta#38 target description Ta_38_EE_deposit.JPGTa#38_EE.PNGTa#38_CE.PNG
Ta#38 LP-SIS target description: 
Total Ta foils = 400
Foil thickness = 0.025mm
    Reply  Monday, June 11, 2012, 13:46, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 run finished 


    
        
            John Wong wrote:
        
        
            
             
Entry  Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description UCx#4_specfications.PNG
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.
Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. 
Entry  Tuesday, December 11, 2012, 15:44, Anders Mjos, SiC, HP-FEBIAD, ITW, TM4, na, na (old style fittings), Ready, Test target for the Conditioning Station 
 The target has been used for operator training previously at the ISAC Test Stand.

    9-pin connector was completed and grounded
    RH gripper arms added to the heat shield

Further documentation
on DocuShare
Entry  Thursday, April 11, 2013, 14:30, John Wong, Ta#39, LP-SIS, ITW, TM1, 39165-7, , Spent, Ta#39 target description 
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
Entry  Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description 
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
Entry  Monday, March 17, 2014, 16:15, John Wong, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1, Spent, Ta#42 Target description  
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Tuesday, July 15, 2014, 10:54, Laura Lambert, Ta # 43, LP-SIS, ITW, TM1, 40282-2, , Ready, Ta # 43 Target Description 
 Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description  ZrC#6.JPG
 Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description. 
Target is currently undergoing the sintering process
Entry  Friday, April 17, 2015, 16:00, Laura Lambert, UCx # 12, LP-SIS, ITW, TM1, 41177-2, , Ready, UCx#12 Target Description UCx_12_target_description.PNG
 Thursday, April 16, 2015, 14:07
See attachment for target description
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
 Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 03, 2015, 10:53
Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx
Tuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) 
Entry  Friday, March 04, 2016, 14:57, Laura Lambert, UCx#15, LP-SIS, ITW, , 41077-1, , Ready, UCx#15 Target Description UCx_15_description.jpg
 Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design.