Entry  Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater 
 On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed. 
The polarity swap was not possible because the target/tube assembly has also a short to common. 
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back
Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Thursday, November 29, 2018, 14:23, Marla Cervantes, UCx#26, LP-IG-LIS, , , 42281-3, , Ready, UCx#26 Target description UCx_26-description.JPG
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description. 

 
Entry  Monday, July 22, 2019, 16:33, Marla Cervantes, UCx#27, LP-SIS, , , 49044-9, , Ready, UCx#27 Target Description UCx#27.JPG
 Monday, July 22, 2019, 16:31
Attached please find the UCx#27 target description. 
Entry  Wednesday, October 02, 2019, 11:18, Marla Cervantes, UCx#28, LP-SIS, , , 44062-4, , Ready, UCx #28 Target description UCx28-target_description.JPG
 Wednesday, October 02, 2019, 11:17
Attached please find the UCx#28 target description. 
Entry  Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description C1-Description.PNG
 Thursday, June 04, 2020, 15:00
See attached picture for description 
Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG
 Tuesday, September 29, 2020, 11:49
See attached picture for description 
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Tuesday, July 15, 2014, 10:54, Laura Lambert, Ta # 43, LP-SIS, ITW, TM1, 40282-2, , Ready, Ta # 43 Target Description 
 Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description UCx_10_target_description.PNG
Tuesday, July 15, 2014, 10:58
See attachment for target description 
Entry  Monday, August 18, 2014, 14:39, Laura Lambert, ThO2 #1, LP-SIS, , , , , , ThO2 #1 Target Description ThO2#1_target_description.JPG
Monday, August 18, 2014, 14:53
See attachment for target description

 
Entry  Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description 
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Entry  Thursday, November 06, 2014, 13:35, Laura Lambert, UCx # 11, LP-SIS, ITE, TM4, 40282-5, , Ready, UCx#11 Target Description UCx_11_target_description.PNG
 Thursday, November 06, 2014, 13:29
See attachment for target description

 
Entry  Wednesday, April 01, 2015, 11:27, Laura Lambert, Ta # 45, HP-SIS, , , 38817-5, , In Use, Ta#45 target description 
 Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
Total Ta foils = 400
Entry  Friday, April 17, 2015, 16:00, Laura Lambert, UCx # 12, LP-SIS, ITW, TM1, 41177-2, , Ready, UCx#12 Target Description UCx_12_target_description.PNG
 Thursday, April 16, 2015, 14:07
See attachment for target description
Entry  Wednesday, April 29, 2015, 15:39, Laura Lambert, SiC#31, HP-SIS, , , 38817-7, , Ready, SiC#31 Target description final_density_measurements.JPGdensity_measurements.xlsxSiC_density_Jan_10_'14_cast_-_Copy.xlsxSiC_density_Oct_31_'14_cast.xlsx
 Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description: 
Total SiC foils = 520 discs 
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
 Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
Entry  Thursday, September 10, 2015, 13:33, Laura Lambert, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description 
 Thursday, September 10, 2015, 13:31
Ta#46 HP-SIS target description:
Total Ta foils = 505
Entry  Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description elog_snapshot.JPG
 Thursday, September 24, 2015, 11:46
See attachment for target description.

 
Entry  Monday, October 26, 2015, 16:33, Laura Lambert, UCx#14, LP-SIS, , , 41077-5, , Ready, UCx#14 Target Description Capture.JPG
 Monday, October 26, 2015, 16:23
Attached please find the UCx#14 target description.
Note: This is the first UCx target using the new LP-SIS small center block design.