ID |
Date |
Author |
Category |
Type |
Specific |
Subject |
Text |
|
341
|
Friday, January 19, 2024, 17:07 |
Albert Kong | Standard Operation | Other | Target | T1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation | The following tasks were completed:
Yesterday (Jan 18), the
T1/T2 cooling packages were inspected for |
7x |
348
|
Thursday, May 23, 2024, 17:10 |
Albert Kong | Standard Operation | Target 1 | Target | T1-MK1 Target Exchange (+ leak fix, service panel changes, coupler exchange) | On May 23, 2024 two sets of plugs from
position 1 and 3 and a 12mm Be target from
position 5 (serial #109) was removed from |
36x |
356
|
Wednesday, October 30, 2024, 15:10 |
Albert Kong | Standard Operation | Target 1 | Target | T1-MK1 Electrical Check on Hot Cell | T1-MK1 electrical checks were completed
on the hot cell. Specifically the profile
and protect monitors were checked (assistance |
7x |
119
|
Monday, August 11, 2014, 16:57 |
Isaac Earle | Repair | Target 2 | Other | Air Amplifier Increased Cycle Rate | On Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased. Cycle time measurements |
|
120
|
Wednesday, August 13, 2014, 16:34 |
Isaac Earle | Repair | Target 1 | Other | Amplified Air Leak Narrowed Down to T1 Area | During the maintenance day today,
amplified air to the T1 area was valved off
in an attempt to pin point the location of |
|
127
|
Monday, November 17, 2014, 10:25 |
Isaac Earle | Repair | Target 1 | Other | Amplified Air Leak In T1 Area Repaired | While the 1A blocks over the T1 area were
removed last week the opportunity was used
to investigate an air leak on the amplified |
|
130
|
Friday, December 19, 2014, 14:35 |
Isaac Earle | Standard Operation | Target 2 | Other | Amplified Air Shut Off | The BL1A amplified air system has been
shut off, and will remain off until required
for BL1A start-up in Spring 2015 (the lower |
|
136
|
Wednesday, January 14, 2015, 15:06 |
Isaac Earle | Standard Operation | Target 1 | Other | Active Item Stored in East Hot Cell | The active item discovered on January 9,
2015 outside the BL1A bootbox has been moved
to the Meson Hall east hot cell for storage. |
|
154
|
Thursday, April 23, 2015, 13:40 |
Isaac Earle | Development | Target 2 | Other | T2 Protect Monitor Elevation Adjustment | - T2 Protect Monitor moved from the beam
line to the hot cell on Monday April 20th
- Elevation of the plate center measured |
|
158
|
Friday, May 01, 2015, 16:01 |
Isaac Earle | Repair | Target 1 | Other | RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check | The Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger. The location |
|
159
|
Friday, May 08, 2015, 09:48 |
Isaac Earle | Standard Operation | Other | Other | BL1A Blocks Restored | Replacement of the BL1A blocks was completed
yesterday (May 8, 2015) in preparation for
first beam down 1A on May 12th. The |
|
164
|
Tuesday, June 23, 2015, 10:24 |
Isaac Earle | Standard Operation | Other | Other | BL1A Holding Tank Water Released | The water in the BL1A holding tank
was released to the city sewer. This
water was sampled, tested, and approved for |
|
169
|
Thursday, August 13, 2015, 09:47 |
Isaac Earle | Development | Other | Other | "Clamp A" disassembled and used to build clamp "TRH1257-#01" | The 4" Marman flange clamp (IRH0001)
labeled "Clamp A", as used
in the testing detailed in Document-114623 |
|
170
|
Wednesday, August 19, 2015, 12:10 |
Isaac Earle | Repair | Other | Other | Warm Cell Water Window Seal Replacement Status | The following tasks were completed over
the past 2 weeks:
- Aquarium Technology Ltd. (UK) was |
6x |
177
|
Monday, October 05, 2015, 15:25 |
Isaac Earle | Standard Operation | Other | Other | Old T2 Protect Monitor Cassette Update | The T2 protect monitor cassette removed
in April 2015 (see E-log #154) was surveyed
today. It was approximately 3mSv/hr |
|
179
|
Friday, October 09, 2015, 14:56 |
Isaac Earle | Repair | Target 2 | Other | T2 Protect Monitor Replacement | On Monday Oct 5th a decision was
made to uncover and remove the T2 Protect
Monitor due to faulty readings. The |
9x |
188
|
Wednesday, February 24, 2016, 13:03 |
Isaac Earle | Repair | Other | Other | Target Flask 2-Ton Hoist Chain Twist Corrected | A 1/2 turn twist in the target flask
hoist chain has been corrected to address
a deficiency observed by inspectors by Gordon |
|
191
|
Thursday, March 24, 2016, 14:46 |
Isaac Earle | Other | Other | Other | TNF / 500MeV Resin Cans Removed from Storage Pit #1 | Three used TNF / 500MeV system cooling
system resin cans were removed from the Meson
Hall target storage pit (two from Hole #1, |
|
195
|
Monday, April 11, 2016, 13:51 |
Isaac Earle | Development | Other | Other | Target Transfer Flask Hoist Hook Lower Limit Adjusted | The lower limit of the flask hoist
hook has been adjusted. The travelling
nut for the lower limit was rotated 3 notches |
|
227
|
Thursday, July 27, 2017, 09:34 |
Keith C Ng | Development | Other | Other | test 2 | test 2 |
|