  RH-Meson Hall, Page 13 of 19  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Categorydown Type Specific Subject Text Attachments
  364   Tuesday, April 08, 2025, 15:44 Albert KongOtherTarget 2TargetVA8 Beampipe Section Radiation and Video Survey NoteThe uncovered VA8 section of beam pipe
was surveyed in preparation for a visual
inspection and some laser scanning.
 IMG_1679.JPEGIMG_1680.JPEGVA8_Photos_(09April20205).pdf 
  365   Wednesday, April 23, 2025, 15:58 Adam NewsomeOtherOtherHot Cell Safety Walkaround Complete - Meson Hall HC/WC Area A safety walkaround was completed for the
Meson Hall Hot/Warm Cells.
The resulting spreadsheet can be
  
  3   Friday, November 04, 2011, 13:36 Isaac EarleMaintenanceTarget 2TargetKaon Target (Training)  Moved Kaon Target from storage
pit to remote handling hot cell using flask
as training exercise.  Safety surveyor
  
  4   Tuesday, December 20, 2011, 09:54 Isaac EarleMaintenanceTarget 1TargetReplaced T1-MK1 Target LadderReplaced T1-MK1 target ladder with the
new ladder design which has an integrated
upper slide plate (2 less sealing locations)
  
  5   Thursday, December 22, 2011, 15:27 Isaac EarleMaintenanceTarget 1TargetT1-MK1 Transferred to Storage Pit T1-MK1 target transferred from hot
cell to storage pit position #3 to free up
the hot cell in preparation for shut-down
  
  6   Thursday, January 05, 2012, 10:18 Isaac EarleMaintenanceTarget 2CoolingSwapped Resin in T2 Cooling PackageDrained T2 cooling package water, collected
sample and delivered to RPG.  Swapped
resin can, refilled, and restarted cooling
  
  7   Thursday, January 05, 2012, 10:21 Isaac EarleMaintenanceTarget 1CoolingDefeated T1 and T2 cooling package vacuum interlocks. Defeated T1 and T2 cooling package
vacuum interlocks at 1-C panel on South mezzanine
in Meson Hall to allow cooling packages to
  
  8   Friday, January 06, 2012, 15:37 Isaac EarleMaintenanceTarget 2TargetTransferred M20 beam blocker to hot cellUncovered T2 monolith and transferred M20BB to hot cell using flask.   
  9   Thursday, January 12, 2012, 11:34 Isaac EarleMaintenanceTarget 2TargetReplaced M20 Beam Blocker Vacuum Seal O-Rings Replaced M20 beam blocker vacuum
seal o-rings.  Old o-rings were noticeably
harder, but not brittle or cracked.  Applied
  
  14   Wednesday, January 25, 2012, 13:26 Isaac EarleMaintenanceTarget 2TargetM9BB Returned to Beam LineM9 beam blocker returned to beam line.
T2 target disconnected, picked up
using flask, and returned to beam line as
  
  15   Monday, January 30, 2012, 16:44 Isaac EarleMaintenanceTarget 1CoolingCompleted T1 Cooling Package MROReplaced
all o-rings and filters on the T1 cooling
package.  Replaced resin can.  Refilled
  
  26   Tuesday, April 03, 2012, 15:55 Isaac EarleMaintenanceTarget 1TargetT1 Ladder Position Look-up Tables Updated Graham Waters has activated the appropriate
target ladder position look-up tables for
the T1-MK1 target which was installed in
  
  29   Thursday, April 05, 2012, 15:22 Isaac EarleMaintenanceTarget 1TargetT1 & T2 Profile and Protect "Blip" Test Diagnostics group completed their
"blip" signal response tests on
the T1 and T2 profile and protect monitors.
  
  31   Thursday, April 12, 2012, 15:19 Isaac EarleMaintenanceTarget 2TargetT2 Target Water Drained In preparation for extended periods
of the T2 volume being vented during the
M20 repair, the T2 water package was shut-off,
  
  37   Wednesday, June 06, 2012, 08:58 Isaac EarleMaintenanceTarget 2TargetT2 Monolith Leak Check While leak checking components in
the M20 front end on May 25th, the top of
the T2 monolith was also checked by flooding
  
  44   Friday, June 22, 2012, 13:54 Isaac EarleMaintenanceTarget 2TargetAir Amplifier Rebuild CompleteA full rebuild of the upper air amplifier
was completed.  New anodized aluminum
barrels were installed (replacing the old
  
  45   Tuesday, June 26, 2012, 09:05 Isaac EarleMaintenanceTarget 1CoolingT1 & T2 Target Water Flow Transducers Serviced The target water outlet flow transducers
on the T1 and T2 cooling packages were serviced
(new shaft, paddle wheel, & o-ring) to
 T1_&_T2_water_flow.jpg 
  57   Thursday, September 13, 2012, 18:09 Isaac EarleMaintenanceTarget 1CoolingSeptember Shutdown T1 & T2 MRO The following tasks were performed
during the 2012 September Shutdown:
- Both targets moved to position
 IMG_0624.JPGIMG_0658.JPG 
  64   Monday, December 10, 2012, 15:42 Isaac EarleMaintenanceTarget 1TargetT1-MK2 Target Maintenance- T1-MK2 target moved from storage pit
to hot cell
- Removed unused proximity sensor
  
  66   Tuesday, January 08, 2013, 10:52 Isaac EarleMaintenanceTarget 2TargetT2-MK1 Target Maintenance- T2-MK1 target transported from storage
pit to hot cell
- Proximity sensor removed
  