Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 99 of 139  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2057   Monday, February 03, 2020, 09:14 David WangITWStandard OperationTM4UCx 29TM4 UCx 29 disconnection checklist TM4 has been disconnected in ITW. See attachment
checklist. 
 UCx29__disconnection_checklist.pdf 
  2060   Wednesday, February 05, 2020, 10:49 David WangConditioning StationStandard OperationTM4 Remove of TM4 from SHC to TCS.TM4 has been moved from SHC to TCS. No
target on module. The move is successful.
  
  2061   Wednesday, February 05, 2020, 10:54 David WangConditioning StationStandard OperationTM4 Roughing out TM4 at TCS.TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS
  
  2062   Wednesday, February 05, 2020, 11:03 David WangSouth Hot-CellStandard OperationTM4UCx 29UCx 29 post run electrical checkUCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements.
 UCx29_post_run_electrical_check..pdf 
  2067   Friday, February 14, 2020, 14:06 David WangConditioning StationStandard OperationTM4 TCS vacuum system and water sytem are switched on.All turbo pumps are started.     
  2068   Friday, February 14, 2020, 14:13 David WangSouth Hot-CellStandard OperationTM4 SIS dummy target for IGLIS TM4 electrical checkElectrical check and HS, window leak check
result at SHC. See attachment.
 Dumm_SIS_target_for_IGLIS_test_on_TM4.pdf 
  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment
 Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf 
  2070   Wednesday, February 26, 2020, 08:45 David WangConditioning StationStandard OperationTM4 Remove of TM4 from TCS to SW siloTM4 has been moved from TCS to SW silo.
The move is fine. 
  
  2072   Thursday, February 27, 2020, 10:37 David WangSafe Module ParkingStandard OperationTM2 Start of SMP vacuum pump.TM2 in SMP with old SiC #39 target on it.
SMP vacuum pump is started. 
  
  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up. Using the camera,  Frank and I inspected
the broken  blades in vacuum duct bending
section. We are pretty sure some of 
  
  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without moduleITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control
  
  2076   Wednesday, March 04, 2020, 14:30 David WangSafe Module ParkingStandard OperationTM2 Remove of TM2 from SMP to SHC.Frank and I removed TM2 from SMP to SHC.
The move is successful. 
  
  2077   Thursday, March 05, 2020, 07:16 David WangSouth Hot-CellStandard OperationTM2SiC #39TM2 SiC #39 post run electrical checklist  Electrical check result is fine. 
See attachment.
 SiC_#39_post_run_cheklist..pdf 
  2078   Friday, March 06, 2020, 09:35 David WangSpent Target VaultStandard Operation SiC #39Spent target SiC#39 removal from SHC to storage vault.Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful.  Note:The small aluminum
  
  2079   Friday, March 06, 2020, 09:51 David WangSouth Hot-CellStandard OperationTM2 TM2 was moved from SHC to SMP yesterday.TM2 was moved from SHC to SMP yesterday. 
The move is successful. TM2 is located at
SMP. There is no hot target on module so
  
  2080   Monday, March 09, 2020, 14:31 David WangITE/ITWStandard Operation  TH emergency exit test. Frank and I did the test.  The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. 
  
  2082   Thursday, March 12, 2020, 13:42 David WangITE/ITWDevelopment  New ITE IGLIS cables installation New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC
  
  2083   Thursday, March 12, 2020, 13:48 David WangITERepair  Entrance module TP1S broken piesces clean up.The broken pieces in ITE entrance vacuum
pit are vacuumed out.  At SHC, There
are 4 pieces on module collimator block top, 
  
  2087   Tuesday, March 17, 2020, 12:58 David WangSouth Hot-CellDevelopmentTM4 P2N target electrical check and leak check at SHC.See attachment. Everything looks good.
 P2N_target_electrical_chek_at_SHC.pdf 
  2088   Tuesday, March 17, 2020, 14:59 David WangITEDevelopmentTM4P2NITE turbopumps are started.They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. 
  
ELOG V2.9.2-2455