ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. | Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec, |
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response |
|
21
|
Thursday, August 18, 2011, 14:09 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | UCx#2 | Leak and Electrical Check plus Remote Move to Conditioning Station | TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a leak |
|
25
|
Wednesday, August 24, 2011, 17:11 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Leak Check, HV conditioning and Module Move | Today a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps |
|
43
|
Friday, October 28, 2011, 14:29 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Leak Check on October 27/10/2011 | A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made |
|
23
|
Friday, August 19, 2011, 14:52 |
Bevan Moss | Conditioning Station | Repair | TM1 | UCx#2 | Leak Check | A
leak check was performed on the module when
it was in the conditioning station today. |
|
422
|
Monday, August 19, 2013, 10:08 |
Anders Mjos | ITE | Repair | TM4 | SiC#29 | Leak Check | All water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible |
|
1897
|
Monday, March 25, 2019, 10:11 |
Aaron Schmidt | South Hot-Cell | Repair | TM2 | | LP-FEBIAD Test Target (empty) | Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
|
|
781
|
Wednesday, November 05, 2014, 14:21 |
Anders Mjos | Conditioning Station | Development | | | Jumper installed on TGHT, TBHT and COIL | A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing. |
|
789
|
Monday, November 17, 2014, 13:45 |
chad fisher | South Hot-Cell | Repair | | | Jig for roof install of target | Jig for installation of target through
hot cell roof has been assembled and placed
in the target hall. |
|
297
|
Monday, April 15, 2013, 11:00 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | | Items for TM3 dummy target installation | New gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow. |
|
2091
|
Friday, March 27, 2020, 08:45 |
Matthew Gareau | North Hot-Cell | Maintenance | | | Issues with the manipulators | This is a link to all of the issues
with the NHC manipulators that I know of
|
|
2445
|
Wednesday, May 24, 2023, 17:25 |
Carla Babcock | ITE | Repair | TM4 | TiC#5 | Issues with anode short | When I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common. |
|
482
|
Monday, September 30, 2013, 16:04 |
Bevan Moss | Conditioning Station | Repair | TM3 | NiO#2 | Ion gauge filament replacement | The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed |
|
2489
|
Thursday, September 14, 2023, 11:16 |
Adam Newsome | Spent Target Vault | Development | | Ta #58 | Investigation of Pail 211 (Ta #58) | Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the |
|
2069
|
Thursday, February 20, 2020, 09:27 |
David Wang | Spent Target Vault | Standard Operation | | | Inventory of mini storage and vault. | Repacked nSiC#1 in SHC and moved it to
mini storage vault. Transferred UCx26 and
UCx28# from vault to mini-storage. See attachment |
|
1395
|
Tuesday, November 08, 2016, 14:04 |
Isaac Earle | North Hot-Cell | Development | | | Interference check with TCS turbo pump and proposed NHC duct routing | David Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement |
|
1621
|
Thursday, September 21, 2017, 12:07 |
chad fisher | South Hot-Cell | Repair | TM2 | | Insulator Replacement | Insulators ITD0053 and 54 have been replaced.
All fasteners torqued to 56 in lbs.
|
|