147
|
Monday, July 16, 2012, 11:55 |
Bevan Moss | Crane | Repair | | | Crane has stopped working |
|
|
500
|
Tuesday, October 08, 2013, 18:12 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane Stuck in East-West Direction - Update | Grant Minor wrote this e-mail today:
***
Hello all, |
 |
501
|
Wednesday, October 09, 2013, 19:33 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel) |
|
|
503
|
Tuesday, October 15, 2013, 16:44 |
Grant Minor | Crane | Repair | | | Target Hall Crane - operational with temporary thermal sensor bypass | E-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th: |
|
557
|
Tuesday, November 26, 2013, 14:10 |
Travis Cave | Crane | Maintenance | | | Thermal relay replaced | The bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local) |
|
840
|
Friday, February 06, 2015, 08:06 |
David Wang | Crane | Repair | | | TH crane lost movement controls since last Friday. | Last Friday, During the crane per use check,
I found the main power supply to to crane
was shut off. I was told Don and Travis |
|
841
|
Friday, February 06, 2015, 12:27 |
David Wang | Crane | Repair | | | TH crane troubleshoot | Gordon crane technician started TH crane
trouble shooting this morning. The problem
is found that there is no 115VAC power supply |
|
843
|
Thursday, February 12, 2015, 09:11 |
David Wang | Crane | Repair | TM4 | | TH crane troubleshoot and annual inspection. | Gordon crane technicians continued their
troubleshooting on this Tuesday. They found
the crane up-limit protection switch which |
|
844
|
Monday, February 16, 2015, 11:57 |
David Wang | Crane | Repair | | | TH crane | Dave.Morris installed a new battery on
crane control PLC board and uploaded the
program. Travis, Dan and I tested the crane |
|
1459
|
Thursday, March 23, 2017, 11:22 |
Grant Minor | Crane | Maintenance | | | Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist | Strange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist |
  |
1476
|
Tuesday, April 04, 2017, 14:39 |
David Wang | Crane | Standard Operation | | | Crane check main hoist on jogging with shielding plug lifted. | Today, I checked TH crane main hoist
when shielding plug is installed into ITE
pit. I did some jogging actions on |
|
1482
|
Thursday, April 06, 2017, 15:11 |
Grant Minor | Crane | Maintenance | | | Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017 |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
1497
|
Thursday, April 13, 2017, 14:16 |
David Wang | Crane | Repair | | | TH crane: east side main hoist brake assembly is replaced. | Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed. |
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
1516
|
Monday, May 01, 2017, 12:32 |
David Wang | Crane | Repair | | | TH crane burning smell | TH crane burning smell showed again this
morning. It appeared after 1-1.5 hours of
continuously using during the F308 flasks |
|
1523
|
Friday, May 05, 2017, 11:06 |
David Wang | Crane | Standard Operation | TM3 | | TH crane is used for 5 shielding blocks transferring. | TH crane is used for transferring
five shielding blocks(30000lbs) today. All
brakes work fine. Mostly, I do not need |
|
1534
|
Friday, May 12, 2017, 07:42 |
David Wang | Crane | Repair | | | TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. | This morning, when I prepare for today's
crane check, The crane made a very strong
noise without any load during the full speed |
|
1558
|
Tuesday, June 13, 2017, 11:10 |
Grant Minor | Crane | Maintenance | | | ISAC THall Crane 100% / 125% Load Test Documentation - 2011 | The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North |
    |
1563
|
Friday, June 23, 2017, 12:08 |
David Wang | Crane | Repair | | | TH crane inspection and probem fixing by Gordon crane | Gordon crane technician Peter came in today
and checked TH crane. Maico and I were there
with him. What he found is that brake gap |
|
1586
|
Tuesday, July 18, 2017, 15:04 |
Travis Cave | Crane | Maintenance | | | Failure of the ISAC TH Crane Rotate. | Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block |
|