Wednesday, October 09, 2024, 14:04, Frank Song, ITE, Standard Operation, TM2, Ta#68, Module Connection
|
TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached. |
Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection
|
TM2 with spent target TA#68 was disconnected in ITE and is being moved to SHC. All water lines are purged for module storage. |
Wednesday, December 04, 2024, 08:05, Frank Song, ITE, Standard Operation, TM3, UCx#47, Module Connection
|
TM3 with new target UCx#47 was connected in ITE right after be moved from TCS. |
Tuesday, January 07, 2025, 12:05, David Wang, ITE, Standard Operation, TM3, UCx #47, ITE primary and secondary vacuum vessel leak check for 2025 shut down
|
ITE primary and secondary vacuum vessel leak check for 2025 shut down have been done. No leak. The TM3 waterlines helium pressure test will be
done at TCS when module is there.
TM3 water lines helium pressure test are done. 70 psi helium 3 minutes to each line( except HS which has no target on it ) . leak detector |
Monday, January 13, 2025, 10:36, Frank Song, ITE, Standard Operation, TM3, UCx#47, module disconnection
|
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
Wednesday, February 05, 2025, 13:46, Alexander Shkuratoff, ITE, Standard Operation, , , ITE HV bias test without module (Work permit I2025-02-03-2)
|
Wednesday, February 05, 2025, 12:20
Ed has the voltage already up to 1000 V. Starting further ramp up in 250 V increments.
Wednesday, February 05, 2025,
12:45 |
Tuesday, March 18, 2025, 13:54, David Wang, ITE, Standard Operation, , , ITE water signals interlock annual check
|
ITE water signals interlock annual check is done today. all interlocks work . No issue. |
Thursday, May 01, 2025, 09:33, Travis Cave, ITE, Standard Operation, TM4, UC#48, Module move
|
TM#4 with UC#48 went from the conditioning station to the east target station. |
Tuesday, May 06, 2025, 09:18, Frank Song, ITE, Standard Operation, TM4, UCx#48, Module Connection
|
TM4 with first target UC#48 of this year has been connected in ITE. see attachment please. |
Tuesday, June 17, 2025, 11:58, Frank Song, ITE, Standard Operation, TM4, UC#48, module disconnection
|
TM4 with spent target UC#48 was disconnected ang moved from ITE to NHC. see attachment pls. |
Wednesday, January 22, 2025, 10:29, Frank Song, Faraday Cage, Maintenance, , , Annual clean up for ITE/ITW Faraday cages
|
David and I cleaned both cages in ISAC1 electric room, all done. |
Wednesday, July 17, 2024, 15:06, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround Complete - SHC/NHC Area
|
A safety walkaround for July 2024 was completed for the B2 level by A. Newsome. No deficiencies to report.
Results can be found in the master
spreadsheet |
Thursday, October 10, 2024, 12:20, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Friday, October 11, 2024, 15:59, Aaron Tam, Facilities, Repair, , , ISAC B2 North Hot Cell Phone Fixed
|
Resolution comment / Commentaire de résolution:
Fixed issue by changing patch cord that was connected to the
switch from patch panel. |
Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged.
|
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
Friday, January 03, 2025, 09:59, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings
|
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job. |
Friday, April 25, 2025, 14:30, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Monday, May 12, 2025, 09:17, David Wang, Facilities, Standard Operation, , , BL2A MAA ASU Test
|
MCR Travis Curucz , Frank, and I finished BL2A MAA ASU test per document 154779. everything works fine. Travis kept the test document. |
Friday, July 13, 2012, 16:33, Bevan Moss, Crane, Repair, , , Crane has stopped working
|
In the AM today David and I used the crane to raise the ground plate sheet metal into place. This afternoon when I attempted to return the crane to its
usual place I discovered that the crane no longer worked. Upon further inspection it appears that the PLC has lost power. I will follow up on this Monday
morning. The crane is not supporting any load at this point. |
|