1459
|
Thursday, March 23, 2017, 11:22 |
Grant Minor | Crane | Maintenance | | | Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist | Strange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist |
|
1476
|
Tuesday, April 04, 2017, 14:39 |
David Wang | Crane | Standard Operation | | | Crane check main hoist on jogging with shielding plug lifted. | Today, I checked TH crane main hoist
when shielding plug is installed into ITE
pit. I did some jogging actions on |
|
1482
|
Thursday, April 06, 2017, 15:11 |
Grant Minor | Crane | Maintenance | | | Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017 |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
1497
|
Thursday, April 13, 2017, 14:16 |
David Wang | Crane | Repair | | | TH crane: east side main hoist brake assembly is replaced. | Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed. |
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
1516
|
Monday, May 01, 2017, 12:32 |
David Wang | Crane | Repair | | | TH crane burning smell | TH crane burning smell showed again this
morning. It appeared after 1-1.5 hours of
continuously using during the F308 flasks |
|
1523
|
Friday, May 05, 2017, 11:06 |
David Wang | Crane | Standard Operation | TM3 | | TH crane is used for 5 shielding blocks transferring. | TH crane is used for transferring
five shielding blocks(30000lbs) today. All
brakes work fine. Mostly, I do not need |
|
1534
|
Friday, May 12, 2017, 07:42 |
David Wang | Crane | Repair | | | TH crane burning smell, smoke, and big noise on east side main hoist brake assembly. | This morning, when I prepare for today's
crane check, The crane made a very strong
noise without any load during the full speed |
|
1558
|
Tuesday, June 13, 2017, 11:10 |
Grant Minor | Crane | Maintenance | | | ISAC THall Crane 100% / 125% Load Test Documentation - 2011 | The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North |
|
1563
|
Friday, June 23, 2017, 12:08 |
David Wang | Crane | Repair | | | TH crane inspection and probem fixing by Gordon crane | Gordon crane technician Peter came in today
and checked TH crane. Maico and I were there
with him. What he found is that brake gap |
|
1586
|
Tuesday, July 18, 2017, 15:04 |
Travis Cave | Crane | Maintenance | | | Failure of the ISAC TH Crane Rotate. | Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block |
|
1667
|
Tuesday, December 19, 2017, 10:40 |
Don Jackson | Crane | Maintenance | | | Crane Power during winter break | The power to the crane and controls
were turned off using the power switch in
the Crane Control room. The main disconnect |
|
1668
|
Tuesday, December 19, 2017, 10:41 |
Anders Mjos | Crane | Maintenance | | | Crane powered down | The target hall crane has been powered
down by Don today in preparation for the
power shutdown over the Holidays. |
|
1684
|
Wednesday, January 31, 2018, 10:32 |
David Wang | Crane | Standard Operation | | | Target Hall crane annual inspection. | Gordon crane technician Tom finished annual
TH crane inspection today. Everything is
normal. The main hoist brake gaps are checked |
|
1845
|
Thursday, January 03, 2019, 13:41 |
David Wang | Crane | Repair | | | Target hall crane PLC issue. | Target hall crane did not work properly
after power outage during Christmas time.
The only movement could be operated is crane |
|
2039
|
Thursday, January 02, 2020, 10:10 |
David Wang | Crane | Standard Operation | | | TH crane issue. | Target hall crane does not work properly
after TH crane main power is switched off
during Christmas time in control room. I |
|
2040
|
Friday, January 03, 2020, 13:15 |
Adam Newsome | Crane | Repair | | | Target Hall Crane PLC Module/Battery Replacement | The Target Hall Crane bridge and trolley motion
was lost after a period of the crane having
power disconnected over winter holidays. |
|
2096
|
Monday, June 01, 2020, 12:40 |
David Wang | Crane | Maintenance | | | TH crane festoon cable maintenance | Tom Kauss corrected the TH crane
festoon cable loops. He lubricated festoon
cable wheels as well. The maintenance |
|
2173
|
Monday, December 21, 2020, 11:22 |
Adam Newsome | Crane | Standard Operation | | | Crane Shutdown for Power Outage | The Target Hall Crane has been shut down
in preparation for the power outage tomorrow
(Dec 22). Power will be restored on Dec 23. |
|
2188
|
Tuesday, February 16, 2021, 14:00 |
Adam Newsome | Crane | Development | | | Crane pendant upgrade | The crane pendant for the main hoist was
upgraded to a FLEX EX2 style pendant by Canco
Cranes. The installation work was performed |
|