Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2096     Entry time: Monday, June 01, 2020, 12:40
Author: David Wang 
Category: Crane 
Type: Maintenance 
Module:  
Target/Number:  
Subject: TH crane festoon cable maintenance 

Tom Kauss corrected the TH crane  festoon cable loops. He lubricated festoon cable wheels as well.    The maintenance is done.

ELOG V2.9.2-2455