Entry  Thursday, March 14, 2024, 14:54, David Wang, ITE, Maintenance, , , ITE entrance module has been moved from ITE pit to TCS.  
ITE entrance module has been moved from ITE pit to TCS. The move is smooth.ITE entrance module top tank flange and o ring slot are cleaned, and old o
ring are replaced. 
Entry  Thursday, March 21, 2024, 11:35, Ferran Boix Pamies, ITE, Development, , , Wiring of new thermocouple PLC module 
 Thursday, March 21, 2024, 11:33 Three channels are available now for thermocouple readouts from the Target multipin. Wiring from the PLC modules
to the connection terminal blocks and labeling done.
Entry  Monday, March 25, 2024, 10:53, David Wang, ITE, Repair, , , ITE entrance module has been moved from TCS to ITE. 
ITE entrance module has been moved from TCS to ITE. The move is smooth. 
Entry  Monday, March 25, 2024, 10:55, David Wang, ITE, Standard Operation, , , ITE entrance module has been reconnected in ITE pit.  
ITE entrance module has been reconnected in ITE pit per document 190510. 
Entry  Wednesday, March 27, 2024, 09:52, David Wang, ITE, Standard Operation, , , ITE entrance module top and module flange o-ing to tank have been leak checked. 
ITE entrance module top and module flange o-ing to tank have been leak checked. no leak at 0.0xe-9 atm.cc/sec. things are double checked. 
Entry  Wednesday, May 08, 2024, 12:37, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form TCS to ITE 
The move is smooth and successful.
Entry  Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.  Scanned_from_a_Xerox_Multifunction_Printer.pdf
Tm3 has been connected in ITE.  see attachment.
Entry  Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check. 
ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal. 
Entry  Tuesday, May 14, 2024, 15:27, Carla Babcock, ITE, Development, TM3, UCx#44, TM3 conditioning and testing in ITE Screenshot_from_2024-05-14_10-47-22.png
Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will see if the HV cage in the pit can hold 60kV or not.
At around 50kV the bias read current starts to get jumpy. Doesn't look like its an issue for the voltage, but definitely instability increases.
Entry  Thursday, May 23, 2024, 10:59, Frank Song, ITE, Standard Operation, TM3, UCx#44, shielding blocks transfer 
 the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived  WP # I2024-05-23-4
Entry  Friday, June 14, 2024, 11:18, Frank Song, ITE, Standard Operation, TM3, UCx#44, module disconnection TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
 TM3 with target UCx#44 was disconnected in ITE. 
Entry  Friday, June 14, 2024, 11:56, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form ITE to SHC. 
Tm3 has been moved form ITE to SHC. the move is smooth. 
Entry  Monday, June 17, 2024, 07:36, David Wang, ITE, Repair, , , IG1S elbow oring seal and a blabk off cap oring seal beside the elbow were replaced on ITE entrance module top.. 
IG1S elbow o ring seal and a blank off cap o-ring seal beside the elbow were replaced on ITE entrance module top last Friday. IG1s has a higher than
normal reading so i leak checked entrance module top last Thursday and found leaks to 5x E-8 atm.cc/sec leak on one of (or both of )these two o-rings seals.
they are too close to identify exactly on which one was leaking so both o rings were replaced.  other air to vacuum seal on entrance module are leak
Entry  Monday, June 17, 2024, 17:24, Carla Babcock, ITE, Development, TM3, UCx#44, Status of gas system prototype in ITE schematic_pumpinggaslines_detailed.png
A new gas system for FEBIAD operation was installed in ITE to enable us to use a calibrated leak which is attached to the target heat shield. This will
allow us to control the quantity and purity of the gas going into the system, and to switch quickly between gasese and pressures.
The schematic of the system is attached. The use of the ballast container is likely not needed - it was originally included in case we want to
Entry  Tuesday, June 25, 2024, 11:59, David Wang, ITE, Standard Operation, TM3, SiC #46, Tm3 has been moved from TCS to ITE. 
Tm3 has been moved from TCS to ITE. the move is smooth. 
Entry  Tuesday, June 25, 2024, 11:59, David Wang, ITE, Standard Operation, TM3, SiC #46, Tm3 has been moved from TCS to ITE. 
Tm3 has been moved from TCS to ITE. the move is smooth.
Entry  Tuesday, June 25, 2024, 12:49, Frank Song, ITE, Standard Operation, TM3, SiC#46, Module Connection TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
 TM3 with new target SiC#46 was connected in ITE.
Entry  Thursday, July 04, 2024, 01:20, Carla Babcock, ITE, Development, TM3, SiC#46, TM3 conditioning with protons 
Initial Summary:
TM3 sparking behaviour in ITE has been very disruptive both with and without protons. Protons are at 60uA, target heater at 540A. Max voltage achieved
so far is 51kV, limited by time and a current limit on the BIAS supply.
Entry  Tuesday, July 09, 2024, 16:14, Carla Babcock, ITE, Repair, , , Attempts to reduce ITE:EL trips from HV sparks 8x
ITE:EL has been tripping off due to HV sparks. Usually this also trips ITE:Q1/2. These are sitting in side-by-side racks.
The working theory is that HV sparks are returning to ground through the EL and quads, tripping them off. Possibly this is the result of a changed
low impedance ground path. How this change happened could be either something we did during shutdown or the changes we made in TM3, no clear evidence yet.
Entry  Tuesday, August 06, 2024, 09:16, Frank Song, ITE, Standard Operation, TM3, SiC#46, module disconnection TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
 TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon.