  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.

Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.

 Panels are installed back after the inspection.

See attachments

Attachment 1: TM2_serica_cap_inspection_002.JPG
TM2_serica_cap_inspection_002.JPG
Attachment 2: TM2_serica_cap_inspection_003.JPG
TM2_serica_cap_inspection_003.JPG
Attachment 3: TM2_serica_cap_inspection_004.JPG
TM2_serica_cap_inspection_004.JPG
Attachment 4: TM2_serica_cap_inspection_005.JPG
TM2_serica_cap_inspection_005.JPG
Attachment 5: TM2_serica_cap_inspection_008.JPG
TM2_serica_cap_inspection_008.JPG
  1629   Thursday, September 28, 2017, 10:50 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 window and HS water lines at TCS.

  I did helium pressure test on TM2 containment box window and HS line at TCS. @ 70psi helium  for 3 minutes, HS:2.2XE-7 atm.cc/sec., Window:1.2XE-7 atm.cc/sec. There is no change on HS. But LR on window is bigger than before that was in E -9atm.cc/sec range.  

  1638   Tuesday, October 10, 2017, 10:38 David WangITWStandard Operation   5 shielding blocks have been transferred from ITE to ITW .

ITW is configured to take proton beam.

  1639   Tuesday, October 10, 2017, 10:45 David WangConditioning StationRepair  Re-route TCS water lines.

TCS  cooling polyurethane lines have been re-routed to solve to HV sparking issue on old configuration between lines and bais plate.  New re-routed system is tested to 70KV without spark. No leak has been found on new lines after the test.

ECO 4369, drawings and models IRH1715, IRH1716 have been issued and released for this job. Drawings and Models are located in PDM-ISAC1 -TCS polyurethane water lines re-route folder.

Attachment 1: TCS_re-route_001.JPG
TCS_re-route_001.JPG
Attachment 2: TCS_re-route_002.JPG
TCS_re-route_002.JPG
Attachment 3: TCS_re-route_003.JPG
TCS_re-route_003.JPG
Attachment 4: TCS_re-route_004.JPG
TCS_re-route_004.JPG
Attachment 5: TCS_re-route_005.JPG
TCS_re-route_005.JPG
Attachment 6: TCS_re-route_006.JPG
TCS_re-route_006.JPG
Attachment 7: TCS_re-route_007.JPG
TCS_re-route_007.JPG
Attachment 8: TCS_re-route_008.JPG
TCS_re-route_008.JPG
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.

Chad and I leak checked TM4 HS line after new target is installed yesterday. No leak has been found. Also, I helium pressurized the HS line at TCS this morning. TM4 HS line is good on this test. The TM4 gas line configuration on TM4 top is leak check as well. No problem.

  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.

The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak.  It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result  is same as last time check. No concern.

  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCS

TCS vacuum system and water system have been started as well. Everything looks fine.

  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.

TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine.

  1663   Wednesday, November 15, 2017, 08:55 David WangConditioning StationStandard Operation  Install shield plug onto TCS and pumping down TCS.

Shielding plug is installed onto TCS. TCS is being pumped down to keep it under vacuum for the rest of the year.

  1671   Tuesday, January 02, 2018, 10:46 David WangITE/ITW CoolingStandard Operation  Start High active water system.

High active water system  was  checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. 

  1672   Tuesday, January 02, 2018, 11:28 David WangITEStandard OperationTM4 ITE annual water interlock check.

Eric and I finished ITE annual water interlock check. Everything works properly.

  1676   Tuesday, January 16, 2018, 06:50 David WangITE/ITW CoolingStandard Operation  Field measurement on old resin tank in silo

The old resin tank has been stored in silo since last year March.  Without crane the tank up, We use the pole monitor measured the field around the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about  900usv/hr. It is still too hot to remove it.

  1678   Wednesday, January 17, 2018, 06:51 David WangConditioning StationStandard Operation  Stop TCS vacuum pumps

I stopped TCS vacuum pumps for coming TM3 move.

  1680   Wednesday, January 17, 2018, 13:54 David WangConditioning StationStandard OperationTM3 Start TM3 turbo pumps at TCS.

TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday.

  1681   Monday, January 22, 2018, 07:47 David WangConditioning StationStandard OperationTM3 Restarted TM3 vacuum sysytem after site power bump

All TCS and TM3  vacuum pumps are started successfully.

  1682   Wednesday, January 24, 2018, 13:30 David WangConditioning StationStandard OperationTM1  TM1 has been moved to TCS this morning

Tm1 has been moved to TCS this morning. All turbo-pumps are started successfully at TCS and TM1.

  1683   Monday, January 29, 2018, 06:51 David WangConditioning StationMaintenanceTM1 TCS and TM1 vacuum pumps switched off

TCS and Tm1 vacuum pumps are switched off this morning. TM1 TP1and TP2 work fine during this test period. Tm1 will be moved back to silo this morning.

TM1 IG1 stopped work during the test period. It could be broken. We will only replace this gauge if TM1 is used in ITW again.

  1684   Wednesday, January 31, 2018, 10:32 David WangCraneStandard Operation  Target Hall crane annual inspection.

Gordon crane technician Tom finished annual TH crane inspection today. Everything is normal. The main hoist brake gaps are checked on both side. They are good still.

  1689   Wednesday, February 28, 2018, 14:47 David WangITEStandard Operation  leak check ITE primary and secondary vacuum vessel.

2018-02-27: Anders and I finished leak check on ITE primary and second vacuum vessel seals. LD connected to ITE BV2 valves between. LD, Base Leak rate 1.2 xE-9atm.cc/sec, base pressure 0.0XE-4torr. There is a leak has been found on TM4 service cap KF25 blank off. The o-ring on the blank off will be changed later. It is an easy fix . Other seals are good. The big T tank seal on secondary vessel is leak checked as well. It is still fine.  Helium pressure on TM4 water lines will be fulfilled at TCS to save dose.

2018-02-28 Leak checked ITW today, LD connected to ITW BV2 valves between LD base LR0.0XE-9 atm.cc/sec. base pressure 0.0Xe-4torr. There is leak has been found on exit module 1 service cap  on  topcover plate   o-ring. The leak is located on the south side of east edge on exit 1. This is the side module 2 is close beside. The leak rate is up to middle of E-8atm.cc/sec  range with 1-2 second helium spray. The leak and leak position are double checked and confirmed.  To completely fix this leak, the o-ring for top cover plate need to be replaced on service cap.It will be a major shut down job.  The  leak is close to ITW TP3 so it is less affect on beam line elevation vacuum.  Vacuum group experts will be consulted to see if we could leave it to next year shutdown.  Other seals are good including big T-tank seal on secondary vessel. TM2 source tray will be replaced this yea rso no helium pressure test on water lines is needed at this moment.

  1691   Tuesday, March 06, 2018, 09:53 David WangITWStandard OperationTM2 Tm2 and Tm4 vacuum disconnection

The job is done. See attachment.

Attachment 1: TM2_TM4_disconnection_Vacuum.pdf
TM2_TM4_disconnection_Vacuum.pdf TM2_TM4_disconnection_Vacuum.pdf