Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1681     Entry time: Monday, January 22, 2018, 07:47
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Restarted TM3 vacuum sysytem after site power bump 

All TCS and TM3  vacuum pumps are started successfully.

ELOG V2.9.2-2455