Entry  Monday, May 03, 2021, 15:14, Frank Song, ITE, Maintenance, , , High voltage test in ITE 
 Anders and I prepared ITE high voltage test in April 30 ( Friday morning), The MAA is locked for this.
Entry  Monday, May 31, 2021, 11:28, David Wang, ITE, Standard Operation, TM4, , Remotely remove TM4 from silo to shc 
Remotely remove tm4 from silo to shc. The moving is smooth.
Entry  Thursday, June 03, 2021, 08:19, David Wang, ITE, Repair, TM4, UCX33, Replaced ITE TP4  
Replaced  ITE TP4 due to failure start. The new pump works fine. 
Entry  Tuesday, July 20, 2021, 09:46, Adam Newsome, ITE, Standard Operation, TM4, , Remotely moved TM4 from TCS to ITE 
TM4 was moved from the conditioning station to the East target station. 
Entry  Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62 
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
 
Entry  Friday, July 30, 2021, 16:31, Carla Babcock, ITE, Repair, , , ITE re-wire ISK4425D-rev9._APshortmitigationsvg_july27update.png
See the attached for the way ITE has been re-wired for the Ta62 run. Note also that the copper block in the schematic on TBHT negative may not actually
be connected. Wiring verification on Aug. 4.
Entry  Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move 
TM#4 with SiC#41 has been moved from the NHC to ITE.
Entry  Friday, September 17, 2021, 12:34, Frank Song, ITE, Standard Operation, TM4, Sic#41, Module Connection IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg
 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection
checklist are attached here.
Entry  Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg
 TM4 was disconnected and moved to NHC. 
Entry  Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement 
ITE IG1S cable end connector replacement has been finished by Roy Huang. 
Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg
 the module with target UC#35 was connected in ITE and being pumped down.
Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 
 the five shielding blocks have been moved from ITW to ITE. 
Entry  Tuesday, November 23, 2021, 10:46, Frank Song, ITE, Standard Operation, TM4, UCx#35, module disconnection IMG_4456_(2).JPG
 the TM4 with UCx#35 was disconnected in ITE.
Entry  Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE. 
Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful. 
Entry  Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.  from_my_cellphone_2598_647.jpgfrom_my_cellphone_2598_648.jpgfrom_my_cellphone_2598_649.jpgfrom_my_cellphone_2598_650.jpg
TM4 has been connected in ITE. See attachment for checklist.
Entry  Wednesday, January 05, 2022, 09:38, Frank Song, ITE, Maintenance, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63.jpg
 electric check done in ITE. 
Entry  Thursday, January 06, 2022, 13:54, David Wang, ITE, Standard Operation, TM4, , helium pressure test on TM4 internal cooloing lsine at ITE. 
Helium pressure 70 psi. 3 minutes on each circle untill LR on LD is balanced. Base leak rate on LD:0.0xE-9 atm.cc/sec.   The result:
A:   slowly to1.8Xe-8atm.cc/sec after 2 minutes and balanced there.  
B:   slowly to 2.0XE-8 atm.cc/sec after 2 minutes and balanced there.
Entry  Monday, January 10, 2022, 09:31, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.  
ITE primary and secondary  vacuum vessel leak check has been down.  Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak
has been found on big T tank seal which is very tiny. all other seals are perfect leak free.   No concern 
Entry  Thursday, February 10, 2022, 12:42, David Wang, ITE, Standard Operation, , , ITE HV test woithout mdoule was done. 
Carla did the test. That is what she wrote in Feb 04th:  "I am done with the HV testing  at ITE - the
results were the same as at ITW. It stayed at 59kV for 30  mins with no issues. Trying to go above 59.5kV is probably possible but a  bit more risky. ITE
also has a band, from 54-56kV, where the current jumps around like crazy". 
Entry  Thursday, May 19, 2022, 15:05, Frank Song, ITE, Standard Operation, TM4, UCx#37, UCx#37 P2N connection on TM4 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg
 TM4 with UCx#37 was connected in ITE. Attachment available.