385
|
Tuesday, June 25, 2013, 14:24 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move | Module moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well. |
|
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
|
387
|
Wednesday, June 26, 2013, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 UCx target heat shield | Chad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far. |
|
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved | Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
|
|
389
|
Thursday, June 27, 2013, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 Autopsy performed | An autopsy of Ta#39 was performed yesterday
and today. Ta#39 will be sent to the spent
target storage vault on Tuesday. |
|
|
392
|
Tuesday, July 02, 2013, 10:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#6 | module move | TM#1 with UC#6 has been moved from the
conditioning station to the west target station,
move went well. |
|
|
396
|
Thursday, July 04, 2013, 11:37 |
David Wang | ITW | Standard Operation | TM1 | UCx | I reconnected TM1 to ITW. | I reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also. |
|
|
399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW | 5 shielding blocks had been transferred
from ITE to ITW. The ITW is configured
to take proton beam. |
|
|
428
|
Tuesday, August 27, 2013, 11:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#6 | module move | TM#1 with UCx #6 has been moved to the
south hot cell. |
|
|
429
|
Tuesday, August 27, 2013, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | Electrical check | TM#1 with UCx#7 electrical check, numbers
look good, see PDF for details. |
|
|
430
|
Tuesday, August 27, 2013, 14:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move | TM#1 with UCx#7 has been moved from the
south hot cell to the west target station. |
|
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
|
516
|
Tuesday, October 22, 2013, 11:18 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC#7 has been moved from the
ITW to the south west silo. |
|
|
521
|
Wednesday, October 23, 2013, 09:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC #7 has been moved from the
south west silo to the south hot cell. |
|
|
522
|
Wednesday, October 23, 2013, 12:07 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved back
to the south west silo from the south hot
cell. |
|
|
612
|
Thursday, March 06, 2014, 06:28 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 had been moved from silo to CS | TM1 has been successfully moved from silo
to CS. The CS vacuum system is connected
to TM1. Turbo pumps on TM1 and CS have been |
|
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
|
615
|
Thursday, March 06, 2014, 14:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 air to vacuum and water lines leak check at CS. | TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector is hooked directly |
8x |
|
627
|
Thursday, March 20, 2014, 08:19 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module move | TM#1 with no target moved from the conditioning
station to north west silo. |
|
|
670
|
Monday, June 02, 2014, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the north west silo to the south hot cell. |
|