  385   Tuesday, June 25, 2013, 14:24 Travis CaveConditioning StationStandard OperationTM1UC#6module moveModule moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well.
  
  386   Tuesday, June 25, 2013, 14:56 Bevan MossConditioning StationStandard OperationTM1UCx#6Roughing Pumps Started The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo
  
  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shieldChad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far.
  
  388   Thursday, June 27, 2013, 14:21 chad fisherSouth Hot-CellStandard OperationTM1Ucx#6Ucx#6 installed Ta#39? rewmovedUcx#6 was installed on TM1 on Wednesday.
Ta#39 was removed.
  
  389   Thursday, June 27, 2013, 14:23 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 Autopsy performedAn autopsy of Ta#39 was performed yesterday
and today. Ta#39 will be sent to the spent
target storage vault on Tuesday.
  
  392   Tuesday, July 02, 2013, 10:58 Travis CaveConditioning StationStandard OperationTM1UC#6module moveTM#1 with UC#6 has been moved from the
conditioning station to the west target station,
move went well.
  
  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW. I  reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also.
  
  399   Tuesday, July 09, 2013, 14:26 David WangITWStandard OperationTM1UCx5 shielding blocks had been transferred from ITE to ITW5 shielding blocks had been  transferred
from ITE to ITW.  The  ITW is configured
to take proton beam.
  
  428   Tuesday, August 27, 2013, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1UC#6module moveTM#1 with UCx #6 has been moved to the
south hot cell.
  
  429   Tuesday, August 27, 2013, 11:56 Travis CaveSouth Hot-CellStandard OperationTM1UC#7Electrical checkTM#1 with UCx#7 electrical check, numbers
look good, see PDF for details.
 TM#1_UC#7__TgtElecChk_SHC_.PDF 
  430   Tuesday, August 27, 2013, 14:14 Travis CaveITWStandard OperationTM1UC#7module moveTM#1 with UCx#7 has been moved from the
south hot cell to the west target station.
  
  447   Wednesday, September 11, 2013, 09:35 David WangITWStandard OperationTM1UCx5 shielding blocks have been moved to ITWI moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is
  
  516   Tuesday, October 22, 2013, 11:18 Travis CaveITWStandard OperationTM1UC#7module moveTM#1 with UC#7 has been moved from the
ITW to the south west silo.
  
  521   Wednesday, October 23, 2013, 09:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#7module moveTM#1 with UC #7 has been moved from the
south west silo to the south hot cell.
  
  522   Wednesday, October 23, 2013, 12:07 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved back
to the south west silo from the south hot
cell.
  
  612   Thursday, March 06, 2014, 06:28 David WangConditioning StationMaintenanceTM1 TM1 had been moved from silo to CSTM1 has been successfully moved from silo
to CS. The CS vacuum system is connected 
to TM1. Turbo pumps on TM1 and CS have been
  
  614   Thursday, March 06, 2014, 12:59 David WangConditioning StationMaintenanceTM1 Restart TM1 and CS TPs Restarted TM1 and CS turbo pumps after
the power off. Everything is fine .
  
  615   Thursday, March 06, 2014, 14:12 David WangConditioning StationStandard OperationTM1 TM1 air to vacuum and water lines leak check at CS.TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector  is hooked directly
 8x 
  627   Thursday, March 20, 2014, 08:19 Travis CaveConditioning StationStandard OperationTM1no targetmodule moveTM#1 with no target moved from the conditioning
station to north west silo.
  
  670   Monday, June 02, 2014, 10:52 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 with no target has been moved from
the north west silo to the south hot cell.
  