ID Date Author Category Type Moduledown Target/Number Subject
  288   Thursday, April 04, 2013, 12:07 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started

 Roughing started at 12:06. It was believed there was a problem with the compressed air but there was none, TM1 doesn't leak and so you cannot hear that the connection is made.

  289   Thursday, April 04, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM1Ta #39Roughing started

Bevan Moss wrote:

 Roughing started at 12:06. It was believed there was a problem with the compressed air but there was none, TM1 doesn't leak and so you cannot hear that the connection is made.

 Roughing stopped as the module and cover requires modifications that require the vacuum to be opened.

  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 at the conditioning station, has failed its electrical test see attached pdf for details. Also while setting up for the electrical test one of the high powered flexible connectors popped out its crimp and another is working it out its crimp.

Attachment 1: TM1_Ta39_CS_ELEC_CHK.PDF
TM1_Ta39_CS_ELEC_CHK.PDF
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 had the electrical check done on it again it passed, changes this time were the water lines were purged and it was under a better then roughing vacuum. See the attached pdf for details.

Attachment 1: TM1_Ta39_CS_ELEC_CHK2.PDF
TM1_Ta39_CS_ELEC_CHK2.PDF
  292   Monday, April 08, 2013, 16:16 Bevan MossConditioning StationStandard OperationTM1Ta #39Venting with Argon

 TM1 started venting at 4:15 pm with Argon. I will leave the valve open over night.

  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 has not passed it electrical check again, while sitting at the conditioning station at air. The readings have not been consistant. See the current PDF for details.

 

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 4).(April 9th 2013) PASSED

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 5).(April 10th 2013) PASSED

Attachment 1: TM1_Ta39_CS_ELEC_CHK3.PDF
TM1_Ta39_CS_ELEC_CHK3.PDF
Attachment 2: TM1_Ta39_CS_ELEC_CHK4.PDF
TM1_Ta39_CS_ELEC_CHK4.PDF
Attachment 3: TM1_Ta39_CS_ELEC_CHK5.PDF
TM1_Ta39_CS_ELEC_CHK5.PDF
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CS

On April 08th, all water lines in TM1 had been helium pressure tested(70psi) at conditioning station. No leak had been found.

  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.

TM1 has been reconnected in ITW. Water interlock check for TM1 is done.

  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.

I leak checked new installed ITW EXIT1 tank to module o-ring.No leak had been found . Also ,TM1 primary vessel air to vacuum seals had been checked at the same time. There was no response had been found on leak detector.

  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.

Water interlock check  on ITW is done. All water signals are strong on EL panel.  ITW is configured to take proton beam.

  376   Tuesday, June 11, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.

Dan and I  disconnected TM1 in ITW.

  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical check

Results from the electrical check of TM#1 with the UC#6 target. See attached PDF.

Attachment 1: TM#1_UC#6_SIS_Target_Elec_Chk.PDF
TM#1_UC#6_SIS_Target_Elec_Chk.PDF
  385   Tuesday, June 25, 2013, 14:24 Travis CaveConditioning StationStandard OperationTM1UC#6module move

Module moves of TM#1 with Ta#39 from ITW to SHC then TM#1 with UCx#6 from SHC to the conditioning station moves went well.

  386   Tuesday, June 25, 2013, 14:56 Bevan MossConditioning StationStandard OperationTM1UCx#6Roughing Pumps Started

 The roughing pumps have been started on the conditioning station. As it is late in the day for David he will make the turbo pump connections tomorrow.

  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shield

Chad and I leak checked the TM1 UCx target heat shield at SHC. No leak has been found so far.

  388   Thursday, June 27, 2013, 14:21 chad fisherSouth Hot-CellStandard OperationTM1Ucx#6Ucx#6 installed Ta#39? rewmoved

Ucx#6 was installed on TM1 on Wednesday.

Ta#39 was removed.

  389   Thursday, June 27, 2013, 14:23 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 Autopsy performed

An autopsy of Ta#39 was performed yesterday and today. Ta#39 will be sent to the spent target storage vault on Tuesday.

 

 

  392   Tuesday, July 02, 2013, 10:58 Travis CaveConditioning StationStandard OperationTM1UC#6module move

TM#1 with UC#6 has been moved from the conditioning station to the west target station, move went well.

  396   Thursday, July 04, 2013, 11:37 David WangITWStandard OperationTM1UCxI reconnected TM1 to ITW.

 I  reconnected TM1 to ITW on 02 July.The pumping down is good so far. TM1 water interlock check is good also.

  399   Tuesday, July 09, 2013, 14:26 David WangITWStandard OperationTM1UCx5 shielding blocks had been transferred from ITE to ITW

5 shielding blocks had been  transferred from ITE to ITW.  The  ITW is configured to take proton beam.