  1475   Tuesday, April 04, 2017, 10:24 David WangConditioning StationStandard OperationTM4 Stopped TCS pumps this morning Argon vented TCS and TM4 after pumps
are stopped.
  
  1476   Tuesday, April 04, 2017, 14:39 David WangCraneStandard Operation  Crane check main hoist on jogging with shielding plug lifted. Today, I checked TH crane main hoist 
when shielding plug is installed into ITE
pit. I did  some jogging actions on
  
  1477   Tuesday, April 04, 2017, 14:40 David WangITEStandard OperationTM4 TM4 has been connected in ITEall turbo-pumps are started. Everything
looks fine so far.
  
  1479   Wednesday, April 05, 2017, 11:57 David WangITEMaintenance  ITE target module flange o-ring repalcementITE target module tank flange o-ring was
replaced yesterday before TM4 moving. ITE:
IG1S reading looks fine so far. 
  
  1480   Wednesday, April 05, 2017, 14:13 David WangConditioning StationMaintenanceTM1 TM1 and TCS vacuum system are connected togetherI started two turbo-pumps on TM1 and one
small TP on TCS. They are work fine. 
  
  1481   Thursday, April 06, 2017, 12:33 David WangConditioning StationRepairTM1 TM1 rust inpsection and removalTM1 inside service cap surface and shielding
plug surface are visually inspected yesterday.
No rust has been found. I cleaned all rust
  
  1488   Tuesday, April 11, 2017, 14:06 David WangConditioning StationStandard OperationTM4 SHC, TM2 leak check on HS line.Chad and I did leak check on TM1 HS line
at SHC. 0.0XE-9 atm.cc/sec.  No leak.
  
  1489   Wednesday, April 12, 2017, 07:26 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected.Roughing down overnight. Turbo pumps are
started this morning. Everything looks good
so far.
  
  1491   Wednesday, April 12, 2017, 12:51 David WangSouth Hot-CellRepairTM3 TM3 Ram readings @ SHC We have a ram installed on SHC pole
which is 0.5 meter to   module shielding
block surface. the readings we got today
  
  1495   Thursday, April 13, 2017, 11:33 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 water llines at TCS.LD  BLR :0.0 X E-9 atm.cc/sec. BP:0.0XE-4
torr. helium 70 psi. 3 minutes on each circuit
  
  1497   Thursday, April 13, 2017, 14:16 David WangCraneRepair  TH crane: east side main hoist brake assembly is replaced. Gordon Crane technician Tom Kauss finished
the replacement of the east side main hoist
brake assembly. A new set up is installed.
  
  1498   Wednesday, April 19, 2017, 08:29 David WangConditioning StationStandard Operation  TH schedule 132 update in first beam week Update schedule to show job process in
TH. See attachment 1,2.
 Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp 
  1499   Friday, April 21, 2017, 08:19 David WangConditioning StationRepair  Low frequency on TCS TGHT flow sensor.Anders and I found a low frequency issue(13hz
only) on TCS TGHT flow sensor when doing
TM4 conditioning. By trouble shooting, We
 TCS_water_lines_001.JPGTCS_water_lines_002.JPGTCS_water_lines_003.JPG 
  1500   Monday, April 24, 2017, 09:52 David WangConditioning StationStandard OperationTM2 Switch off TCS water system and vacuumsThe TCS bias was turn off before that.
The TM2 and TCS are still under vacuum now.
  
  1501   Monday, April 24, 2017, 16:06 David WangSouth Hot-CellRepairTM2 Crane main hoist strane noise when lifting up TM2  When lifting up TM2 (20000lbs) this
afternoon, TH crane has a strange noise on
main hoist. The module was lift up less than
  
  1502   Monday, April 24, 2017, 16:11 David WangConditioning StationStandard OperationTM2 TCS TP1s is restarted.TCS IG1S  is switched on as well.
The reason to start the pump is to prepare
a possible extended TM2 conditioning at TCS
  
  1505   Wednesday, April 26, 2017, 10:24 David WangITWStandard OperationTM2 TM2 ITWTM2 was moved and connected in ITW yesterday
afternoon. After roughing down, ITW turbo
pumps are started. ITW TP4 can not be started
  
  1516   Monday, May 01, 2017, 12:32 David WangCraneRepair  TH crane burning smellTH crane burning smell showed again this
morning. It  appeared after 1-1.5 hours of
continuously using during the F308 flasks
  
  1517   Monday, May 01, 2017, 13:11 David WangSouth Hot-CellRepairTM3 Electrical Check on TM3 after fibergalss is moved in SHC. RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP)  are shorted together.
Other lines are good.  They are measured
  
  1521   Thursday, May 04, 2017, 14:06 David WangConditioning StationRepairTM3 A vacuum to air leak on TM3 service cap round side panel was found and fixed.. During TM3 roughing down yesterday afternoon,The
vacuum gauges CG1 and CG1S stopped at 1.20
torr and refused to drop down. Leak detector
  