  1986   Tuesday, September 17, 2019, 07:37 Carla BabcockITEDevelopmentTM2ZrC#8end of run HV investigationsRamping up HV to ~30kV, encountered problems
and had to drop back to 28kV. No response
on IG1 or anything else during sparks. Lots
 HVtests_TM2_Sept172019.xlsx 
  1993   Tuesday, October 01, 2019, 09:23 Don JacksonITEMaintenanceTM2ZrC #860KV Common Connections1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way. 
This should of had no impact on the ZrC run
 TM2_Wiring.jpg 
  2002   Monday, October 07, 2019, 09:56 Adam NewsomeITEStandard OperationTM2Ta 59TM2 MoveTM2 has been moved from the Conditioning
Station to ITE with Ta#59 target.
  
  2003   Monday, October 07, 2019, 14:03 David WangITEStandard OperationTM2Ta 59TM2 has been connected in ITE.Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist
 Ta_59_TM2_ITE__connection_checklist..pdf 
  2022   Tuesday, November 05, 2019, 11:57 David WangITEStandard OperationTM2Ta 59Ta#59 disconnection checklistSee attachment  Ta#59_disconnection_checklist.pdf 
  2027   Tuesday, November 12, 2019, 10:02 Adam NewsomeITEStandard OperationTM2SiC#38TM2 MoveTM2 was moved from the Conditioning Station
to ITE, with SiC#38 target. 
  
  2030   Tuesday, November 19, 2019, 13:41 David WangITEStandard OperationTM2SiC 38# febiadTM2 SiC#38 connection check list.TM2 was connected in ITE 12th Nov. attach
checklist
 SiC_#_38_febiad_connection_checklist.pdf 
  2035   Friday, November 29, 2019, 13:10 David WangITEStandard OperationTM2SiC 39# febiadTM2 SiC#39 connection check list.TM2 has been connected  in ITE. 
All turbo-pumps are started.
 SiC_#_39_febiad_connection_checklist.pdf 
  2046   Friday, January 10, 2020, 10:26 David WangITEStandard Operation  ITE water signal inerlock check.ITE water  signal interlock  
check is done.  Everything is good.
It is a annual check we do in winter shut
  
  2053   Wednesday, January 29, 2020, 12:37 David WangITEStandard OperationTM2 ITE primary/secondary vacuum vessel leak check.Leak check on ITE vacuum vessel is done.
LD base leak rate 0.0XE-9atm.cc/sec. base
pressure 0.0Xe-4torr. Sprayed helium on all
  
  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up. Using the camera,  Frank and I inspected
the broken  blades in vacuum duct bending
section. We are pretty sure some of 
  
  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without moduleITE bias test is done to 48KV. No spark.
We can not raise bias above 48KV. It looks
like we have a current limit issue on control
  
  2081   Wednesday, March 11, 2020, 10:39 Travis CaveITEMaintenance  Entrance module move The entrance module has been moved
to the east station to the south hot cell
for inspection from the turbo pump explosion.
  
  2083   Thursday, March 12, 2020, 13:48 David WangITERepair  Entrance module TP1S broken piesces clean up.The broken pieces in ITE entrance vacuum
pit are vacuumed out.  At SHC, There
are 4 pieces on module collimator block top, 
  
  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move The east entrance module has been
moved from the south hot cell back to the
east target station.
  
  2086   Tuesday, March 17, 2020, 11:42 Travis CaveITEStandard OperationTM4P to N targetModule move TM#4 with the P to N target has been
moved from the south hot cell to the east
target station.
  
  2088   Tuesday, March 17, 2020, 14:59 David WangITEDevelopmentTM4P2NITE turbopumps are started.They work fine. Current draw on all pumps
are normal. I asked operator to switch on
IG1 , IG1S and PNG4. 
  
  2089   Wednesday, March 18, 2020, 10:40 David WangITEDevelopmentTM4 TM4 P2N target connection checklist.TM4 has been connected in ITE. See checklist.  P2N_TM4_connection_checklist.pdf 
  2093   Wednesday, May 20, 2020, 13:19 David WangITEMaintenance  Restart of ITE turbo pumps. PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up
  
  2097   Monday, June 01, 2020, 12:46 David WangITEMaintenance  ITH:CM6 ,CM6S and ITM:CM3 calibration.Edi calibrated ITH:CM6, CM6S and ITM:CM3.
By the same time,  ITH:MP1 and MP2 
lubricate oil level are checked. Everything
  