ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1288   Monday, July 18, 2016, 14:14 David WangConditioning StationRepairTM3 TM3 leak checked at TCSLast Friday July-15, TM3 was leak checked
at TCS. All air to vacuum seals on service
cap are good.  Helium pressure test
  
  1290   Friday, July 22, 2016, 10:57 David WangConditioning StationRepairTM3 TM3 has been moved and connected at TCSI started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will
  
  1298   Tuesday, August 02, 2016, 15:22 David WangConditioning StationStandard OperationTM4UC#17TM4 with new target has been connected at TCSIt is being pumped now at TCS.   
  1301   Wednesday, August 03, 2016, 09:45 David WangConditioning StationStandard OperationTM4UC#17Helium pressure test on TM4 HS line at TCS Helium pressure test on TM4 HS line at
TCS  is done.Leak detector 0.0X E-9atm.cc/sec. 
5minutes, 70psi helium.   
  
  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.I started TCS water system and installed
HV cover onto TM4.  The TM4 containment
box is supplied with water also. TM4 is ready
  
  1303   Wednesday, August 03, 2016, 09:56 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Update schedule weekly. See attachments
1,2
 Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1309   Tuesday, August 09, 2016, 07:15 David WangConditioning StationStandard OperationTM4UCx17TM4 has been disconnected at TCSI stopped TCS water pumps this morning
. The argon venting for TCS is in processing.
  
  1313   Wednesday, August 10, 2016, 11:30 David WangITEStandard OperationTM4UC#17TM4 has been connected at ITEDan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far.
  
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1319   Monday, August 15, 2016, 10:08 David WangITEStandard OperationTM4UC#175 Shielding blocks have been transferred from ITW to ITE.Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam.
  
  1320   Monday, August 15, 2016, 10:15 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Weekly update target hall schedule. Everything
on schedule are finished  on time.  
See attachment.  
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stoppedThe TCS is venting now. The TM3 blue insulator
replacement job will be started soon.
  
  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.TM2 was disconnected in ITW yesterday and
moved to SHC.
  
  1332   Wednesday, August 24, 2016, 10:44 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked Tm2 Hs line with
new target installed. Base LR 0.0Xe-9 atm.cc/sec.  
No leak has been found. This line will be
  
  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCSStart of roughing now.   
  1337   Thursday, August 25, 2016, 08:36 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS water lline I did a helium pressure test on TM2 HS
water line at TCS. Leak detector base leak
rate only could get to 1.8x e-8 atm.cc/sec
  
  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is
  
  1339   Thursday, August 25, 2016, 13:59 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)Weekly update schedule.  See attachment
1,2.
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCSI stopped TCS water pumps and vacuum pumps
also.   TM2 and TCS will be vented tomorrow
morning.
  
  1343   Tuesday, August 30, 2016, 13:17 David WangITWStandard OperationTM2 TM2 has been connected at ITW  ITW turbo pumps  have been
started.
  