Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1276
Entry time:
Wednesday, July 06, 2016, 14:25
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
TCS and TM2 turbo-pumps have been started.
The TCS and TM2 are pumping down.
ELOG V2.9.2-2455