Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1276     Entry time: Wednesday, July 06, 2016, 14:25
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: TCS and TM2 turbo-pumps have been started. 

The TCS and TM2 are pumping down.

ELOG V2.9.2-2455