Wednesday, August 24, 2016, 10:41, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnected in ITW yesterday.
Wednesday, August 24, 2016, 10:44, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line.
Wednesday, August 24, 2016, 10:45, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 vacuum system has been connected at TCS
Thursday, August 25, 2016, 08:36, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 HS water lline
Thursday, August 25, 2016, 08:43, David Wang, Conditioning Station, Standard Operation, TM2, , All TM2 connections to TCS are done.
Thursday, August 25, 2016, 13:59, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)
Monday, August 29, 2016, 13:34, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been disconnected at TCS
Tuesday, August 30, 2016, 13:17, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected at ITW
Tuesday, September 06, 2016, 10:05, David Wang, ITW, Standard Operation, TM2, , 5 Shielding blocks have been transferred from ITE to ITW.
Thursday, September 08, 2016, 16:28, David Wang, Conditioning Station, Repair, TM3, , TM3 blue insulators have been replaced.
Thursday, September 08, 2016, 16:30, David Wang, Conditioning Station, Repair, TM3, , TM3 vacuum system have been connected at TCS.
Monday, September 12, 2016, 09:25, David Wang, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS
Wednesday, September 14, 2016, 11:54, David Wang, Conditioning Station, Repair, TM3, , TM3 is disconnected at TCS.
Monday, September 19, 2016, 08:28, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 131(Sep-Dec, 2016)
Tuesday, September 20, 2016, 11:41, David Wang, ITE, Standard Operation, TM4, , TM4 has been disconnected in ITE.
Tuesday, September 20, 2016, 11:48, David Wang, Assembly/Bench Test, Development, , , A silo and blue steel frame are removed out of TH
Thursday, September 22, 2016, 13:04, David Wang, South Hot-Cell, Standard Operation, TM4, , SHC, TM4 leak check on HS line.
Friday, September 23, 2016, 07:49, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been moved and connected at TCS
Tuesday, September 27, 2016, 07:30, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been disconnected at TCS
Wednesday, September 28, 2016, 13:43, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected at ITE