1331
|
Wednesday, August 24, 2016, 10:41 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected in ITW yesterday. |
TM2 was disconnected in ITW yesterday and moved to SHC. |
1332
|
Wednesday, August 24, 2016, 10:44 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. |
Chad and I leak checked Tm2 Hs line with new target installed. Base LR 0.0Xe-9 atm.cc/sec. No leak has been found. This line will be helium pressured at TCS later. |
1333
|
Wednesday, August 24, 2016, 10:45 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 vacuum system has been connected at TCS |
Start of roughing now. |
1337
|
Thursday, August 25, 2016, 08:36 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 HS water lline |
I did a helium pressure test on TM2 HS water line at TCS. Leak detector base leak rate only could get to 1.8x e-8 atm.cc/sec at this moment. Applied 5 minutes 70psi helium on it. No leak has been found at this level. I connected water to this circuit after the test for weekend TM2 conditioning at TCS.
I will do another helium pressure test after the conditioning. The LD base leak rate should be 0.0Xe-9 atm.cc/sec at that time.
2016-08-29: LD Base leak rate 0.0xe-9atm.cc/sec.TM2 HS line helium pressure check again after conditioning. 70psi helium 5minutes. no response on LD. HS line is perfectly sealed. |
1338
|
Thursday, August 25, 2016, 08:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | All TM2 connections to TCS are done. |
The HV cover is installed. The Faraday cage at B2 level is locked also.The TCS and TM2 are still pumping down. Everything is good so far. |
1339
|
Thursday, August 25, 2016, 13:59 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Sep, 2016) |
Weekly update schedule. See attachment 1,2. |
Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
|
|
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
|
1341
|
Monday, August 29, 2016, 13:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been disconnected at TCS |
I stopped TCS water pumps and vacuum pumps also. TM2 and TCS will be vented tomorrow morning. |
1343
|
Tuesday, August 30, 2016, 13:17 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW |
ITW turbo pumps have been started. |
1344
|
Tuesday, September 06, 2016, 10:05 |
David Wang | ITW | Standard Operation | TM2 | | 5 Shielding blocks have been transferred from ITE to ITW. |
5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam. |
1347
|
Thursday, September 08, 2016, 16:28 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 blue insulators have been replaced. |
All TM3 blue insulators except Gas,EL, and 60 KV common on top of the module have been replaced with new designed insulators. The new blue insulator for gas line need to be modified to fit for the bent on the gas line. EL, and 60KV common blue insulators were replaced during last time TM3 refurbishment so they are relative new, and not replaced this time. All seals related to the blue insulators are changed to new seals. The o- r-ing surfaces for o-ring 221 inside the new insulators are rougher than old parts. The module top need to be leak checked. |
1348
|
Thursday, September 08, 2016, 16:30 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 vacuum system have been connected at TCS. |
start of roughing now.
start of TCS and TM3 turbo-pumps. Everything is good so far. |
1349
|
Monday, September 12, 2016, 09:25 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS |
After blue insulators replacement, TM3 service cap are leak checked. LD base leak rate 0.0xe-9 atm.cc/sec. I sprayed lots helium on all blue insulator seals. No leak has been found. Double checked them again, and got same result. All other seals on top of TM3 also have been checked. They are leak free. OVEN, TUBE, MSP, COIL, and EE water lines are pressurized with 70 psi helium for 3minutes each. They are good also. |
1351
|
Wednesday, September 14, 2016, 11:54 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 is disconnected at TCS. |
TM3 is disconnected at TCS and ready to be moved to silo. |
1354
|
Monday, September 19, 2016, 08:28 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) |
Post new target hall Excel sheet schedule for beam schedule 131. See attachment 1,2
Post new target hall MS project schedule for beam schedule131. See attachment 3,4 |
Attachment 1: Target_Hall_shedule_131__Sep_to_Dec_2016.pdf
|
|
Attachment 2: Target_Hall_shedule_131__Sep_to_Dec_2016.xlsx
|
Attachment 3: Target_Hall_shedule_131_Sep_to_Dec.mpp
|
Attachment 4: Target_Hall_shedule_131_Sep_to_Dec.pdf
|
|
1356
|
Tuesday, September 20, 2016, 11:41 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. |
TM4 has been disconnected in ITE. No water line purge on HS and 3 water circuits are looped after disconnection. The HALCW system resistivity is stable before and after this disconnection. |
1357
|
Tuesday, September 20, 2016, 11:48 |
David Wang | Assembly/Bench Test | Development | | | A silo and blue steel frame are removed out of TH |
A silo and blue steel frame are removed out of TH this morning. They are transferred through ante room, and moved to experimental hall TM assembly area for a long term storage. Swipes are done on the silo and frame before and during move. No contamination has been found . |
1358
|
Thursday, September 22, 2016, 13:04 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SHC, TM4 leak check on HS line. |
Chad and I leak checked the TM4 HS line after new target installation. base leak rate:0.0Xe-9 atm.cc/sec. No response on LD during the leak check. The line is leak free so far. It will be helium pressurized at TCS late. |
1359
|
Friday, September 23, 2016, 07:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been moved and connected at TCS |
All TCS and TM4 turbo-pumps were started yesterday. Overnight pumping down is good so far. |
1363
|
Tuesday, September 27, 2016, 07:30 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been disconnected at TCS |
TCS water system and vacuum system are turned off this morning. The TCS and TM4 are vented. |
1365
|
Wednesday, September 28, 2016, 13:43 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected at ITE |
All ITE turbo pumps have been started since yesterday afternoon. The ITE and TM4 pumping down is good so far. |