216
|
Wednesday, November 14, 2012, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25, |
 |
933
|
Thursday, June 04, 2015, 07:44 |
Dan McDonald | Assembly/Bench Test | Development | TM2 | | Movement of TM2 source tray to alignment area in ISAC | Once the test stand was vented and all
lines purged Anders Mjos and myself jigged
up the water blocks and proceeded to remove |
|
24
|
Wednesday, August 24, 2011, 16:35 |
Bevan Moss | South Hot-Cell | Repair | TM1 | UCx#2 | Move, inspection and repair | On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump |
|
35
|
Tuesday, October 04, 2011, 14:13 |
Travis Cave | ITW | Standard Operation | TM1 | TaC#1 | Move ot TM#1 | Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station. |
|
51
|
Tuesday, November 15, 2011, 13:08 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | | Move ot TM#1 | TM#1 has been moved from the south hot
cell to the conditioning station. Move went
well. |
|
82
|
Thursday, April 12, 2012, 09:38 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Move ot TM#1 | TM#1 has been moved from the NE silo to
the Conditioning Station. |
|
10
|
Wednesday, July 20, 2011, 09:55 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from South Hot Cell to East Target Station. | Move completed, move went well. |
|
5
|
Tuesday, July 19, 2011, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#35 | Move of TM#4 from East target station to south hot cell. | Move went well no problems readings at
East Target Station were very high at 500mSv/hr. |
|
28
|
Wednesday, September 28, 2011, 09:07 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#36 | Move of TM#4 from East target station to south hot cell. | Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well. |
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
1940
|
Wednesday, June 12, 2019, 08:56 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | More TM4 conditioning without source tray | The conditioning station was ramped down
overnight and David ramped it back up this
morning. Currently trying to get it to sit |
|
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved | TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to |
|
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved | Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, |
|
1872
|
Wednesday, February 20, 2019, 09:07 |
chad fisher | South Hot-Cell | Repair | TM2 | | Module side waterblock jig | I have installed the module side water
block jig. |
|
446
|
Tuesday, September 10, 2013, 12:11 |
Isaac Earle | South Hot-Cell | Repair | TM3 | | Module side heat shield water block polishing and blank-off installation | The sealing surfaces of the module
side heat shield water block were polished
on September 9th in the morning using Chad's |
|
1134
|
Wednesday, November 25, 2015, 11:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#14 | Module moved and electrical check. | TM#4 with UC#14 was moved from the south
hot cell to the conditioning station.
Here are the results of the electrical check |
|
919
|
Wednesday, May 27, 2015, 08:57 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | | Module moved | TM#2 with no source tray has been moved
from the south hot cell to the conditioning
station. |
|
920
|
Friday, May 29, 2015, 09:16 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | Module moved | TM#2 with no source tray has been moved
from the conditioning station to the north
east silo. |
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved | TM#4 with Ta#45 has been moved from the
east target station to the south hot cell. |
|