Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 216     Entry time: Wednesday, November 14, 2012, 11:51
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Moving the spent targets to mini storage. 

Five spent targets have been moved from the storage vault to the mini storage vault. The five targets are as follows: SiC #25, Ta #34, Ta #32, Ta #31, Nb #4. See the attached PDFs for full details.

Attachment 1: Vault_Storage_November_14_2012.pdf  51 kB  | Show | Hide all
Attachment 2: Mini_Vault_Storage_November_14_2012.pdf  43 kB  | Show | Hide all
ELOG V2.9.2-2455