663
|
Wednesday, May 21, 2014, 13:56 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay | All targets in the vault have been assayed
and measured. Results will be posted soon.
|
|
|
665
|
Tuesday, May 27, 2014, 09:42 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | All of the serviced F-308's have been moved
to the South Hot cell area. |
|
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|
|
681
|
Thursday, June 12, 2014, 09:42 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | Five targets have been moved from the spent
target storage to the mini storage. The targets
that were moved are UCx #'s 6,7,8 , SiC #28, |
|
|
685
|
Tuesday, June 24, 2014, 11:33 |
maicodallavalle | Spent Target Vault | Standard Operation | | | F-308 Maintenance | Five F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F |
|
|
692
|
Thursday, June 26, 2014, 10:57 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Leak check on TM3 HS water line with new target. installed. | Chad and I leak checked the TM3 HS water
line with new target installed. No
leak has been found during the check. Leak |
|
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS | TM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 |
|
|
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
|
|
|
698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. | I reconnected TM3 in ITE. All turbo pumps
have been started. The water supply to TM3
only in ITE. The HV keys are back to electrical |
|
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. | The TM1 and ITW were vented with
argon gas last night. TM1 had been disconnected
in ITW this morning. |
|
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|
|
710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
|
711
|
Tuesday, July 22, 2014, 07:32 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Stop TM1 and CS turbo pumps and ruff pump. | Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW. |
|
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
|
717
|
Monday, July 28, 2014, 14:45 |
David Wang | Conditioning Station | Development | TM2 | | turned off TM2 and CS turbo pumps. | I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning. |
|
|
718
|
Monday, July 28, 2014, 17:26 |
Ron Kuramoto | ITW | Repair | | | ITW:IV5 Air leak repair | Air leak
was found at the Solenoid control valve located
in the Pre-Separator & DB0 room. The |
|