Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 673     Entry time: Monday, June 02, 2014, 11:59
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number:  
Subject: Leak check on TM1 HS water line with new UC9# target installed 

Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test on it at CS later.

ELOG V2.9.2-2455