  623   Monday, March 17, 2014, 15:39 Keith C NgITERepair  2a3 window - prep and cleanCleaned top of the ITE vacuum flange and
top of window clamp. Attempted to clean the
bellows/beam pipe through the wall, mostly
  
  624   Tuesday, March 18, 2014, 16:01 Keith C NgITERepair  2a3 window - prep and cleanContinued with vacuuming inside wall penetration
to remove debris. Changed filter bag in nilfisk
vacuum, left old filter in place however
 Fullscreen_capture_03182014_35409_PM.bmp.jpgFullscreen_capture_03182014_35316_PM.bmp.jpg 
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  626   Wednesday, March 19, 2014, 16:48 Keith C NgITERepair  2a3 window - beam tube removalToday:
1) Vaccumed top and around clamp.
Disconnected clamp from flanges and removed
 11x 
  628   Friday, March 21, 2014, 16:49 Keith C NgITERepair  2a3 window - tank flange inspectionToday:
1) Cleaned flange with methanol and
cotton glove, appears to be clean.
 20140321_2a3window_RHB_6777.JPG20140321_2a3window_P1030055.JPG20140321_2a3window_P1030057.JPG20140321_2a3window_IMG_0846.JPG 
  638   Friday, April 04, 2014, 14:59 Keith C NgITEMaintenance  measurement of new beam tube sectionR. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with
 wall_to_flange_length.pdf 
  639   Friday, April 04, 2014, 16:59 Anders MjosITWDevelopment  Flow meters installed on Heat Shield and Coil water returnDavid W. has installed two SST Proteus
flow meters, model OV7006FTA32, on ITW Heat
Shield and Coil. The flow meters are connected
 20140404_165829_1.jpg 
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  
  646   Friday, April 11, 2014, 11:35 David WangConditioning StationStandard OperationTM3 Helium pressure test on TM3 HS water line with new Ta target. at CSThe helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response
 6x 
  647   Friday, April 11, 2014, 18:17 Keith C NgITERepair  2a3 window - installToday:
1) Installed new cradle and shortened
beam pipe section in wall penetration.
  
  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module moveThe East Entrance module has been moved
from the south west silo to the east target
station. The move went well.
  
  649   Monday, April 14, 2014, 13:58 David WangITERepair  Reconnected ITE entrance moduleI reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE
  
  652   Wednesday, April 16, 2014, 17:08 Keith C NgITERepair  2a3 window - He leak checkHelium leak checked 2a3 window after installing
using remote line: 
- There was a leak found between
  
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures.
 011.JPG025.JPG033.JPG035.JPG032.JPG 
  657   Tuesday, May 06, 2014, 14:05 Travis CaveITEStandard Operation  module moveThe entrance module was out a new seal
went in and then the entrance module went
back, and then TM#3 went back. So all modules
  
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITEFriedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE.
  
  662   Wednesday, May 21, 2014, 13:56 Travis CaveSpent Target VaultStandard Operation  Spent target assayAll targets in the vault have been assayed
and measured. Results will be posted soon.
  
ELOG V2.9.2-2455