Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 602     Entry time: Tuesday, February 18, 2014, 11:26
Author: David Wang 
Category: Conditioning Station 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: I stopped turbo pumps and disconnected vacuum system on TM 2 and CS 

I stopped turbo pumps and disconnected vacuum system on TM2 and CS. The TM2 will be moved to SHC for C seal installation on "D" water block.

ELOG V2.9.2-2455