ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
594
|
Wednesday, February 05, 2014, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets moved from mini storage to F-308s | All targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech |
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D | Containment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and |
 |
596
|
Tuesday, February 11, 2014, 13:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | waterblock cleaning | New cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off. |
 |
597
|
Thursday, February 13, 2014, 09:24 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHC | Chad and I did the Leak checked TM2
tube heater (+) water line with rubber
insert plugged water block on " D" |
   |
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did the pressure test on TM2tube
heater+(D) water line at SHC with shop
air.We tested from 30psi to 80psi on both |
|
599
|
Thursday, February 13, 2014, 14:15 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. |
|
  |
600
|
Thursday, February 13, 2014, 14:23 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(elastic seal) installed on WB. | Chad and I did the leak check on TM2 tube
heater (+) water line with blank off(
+ elastic o ring seal) installed on "D" |
 |
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |
602
|
Tuesday, February 18, 2014, 11:26 |
David Wang | Conditioning Station | Repair | TM2 | | I stopped turbo pumps and disconnected vacuum system on TM 2 and CS | I stopped turbo pumps and disconnected
vacuum system on TM2 and CS. The TM2 will
be moved to SHC for C seal installation on |
|
604
|
Thursday, February 20, 2014, 11:04 |
chad fisher | South Hot-Cell | Repair | TM2 | | Readying TM2 for C-Seal Leak Check | Containment box has been removed and water
block jig installed. |
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off | The blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank |
|
606
|
Monday, February 24, 2014, 12:09 |
chad fisher | South Hot-Cell | Repair | TM2 | | C-seal blank off test | Circuit D has passed the vacuum leak check.
Jig has been removed and containment box
re-installed for move to conditioning station. |
|
608
|
Tuesday, February 25, 2014, 06:53 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | Chad and I did the leak check on
TM2 tube heater (+) water line with
blank off and C-seal installed on |
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
612
|
Thursday, March 06, 2014, 06:28 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 had been moved from silo to CS | TM1 has been successfully moved from silo
to CS. The CS vacuum system is connected
to TM1. Turbo pumps on TM1 and CS have been |
|
613
|
Thursday, March 06, 2014, 06:58 |
David Wang | ITE | Maintenance | TM3 | | ITE vacuum and leak check on ITE BL2A window flange. | ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low |
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
615
|
Thursday, March 06, 2014, 14:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 air to vacuum and water lines leak check at CS. | TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector is hooked directly |
8x |
616
|
Friday, March 07, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM3 | | TM3 and ITE air to vacuum leak check and TM3 water lines helium test. | With TM3 located in ITE, All air to vacuum
seals on ITE primary and secondary
vacuum vessel have been leak checked |
    |
618
|
Tuesday, March 11, 2014, 10:47 |
Travis Cave | ITE | Repair | | | entrance module move | ITE entrance module has been moved from
the east station to the south east silo. |
|