  2475   Wednesday, August 09, 2023, 13:13 David WangConditioning StationStandard OperationTM2Nb#10Tm2 Nb#10 has been connect at TCS.

TM2 Nb#10 has been connect at TCS. TCS water system and vacuum system have been started. Everything looks ok so far. TCS Faraday cage is secured for TM2 conditioning at TCS.

  2476   Wednesday, August 09, 2023, 13:43 Carla BabcockNorth Hot-CellStandard OperationTM2TiC#6TiC#6 PIE

PIE on TiC#6 was done in the NHC. The target assembly looked brand new when we took it out, no heating spots or deposits (pictures on docushare). Online we measured a 400kOhm connection between TGHT-TBHT-COIL to HV common (TGHT and COIL shorted in TM2 service tray) and anode was unstable above ~300V. After the module move and before the target removal David found TGHT-TBHT-COIL was a dead short to HV common and the anode was at 39kOhms to HV common.

1. Wanted to see if the TGHT-TBHT-COIL short was on the COIL. Measured with ohmmeter the COIL lines to HS and got about 700Ohms. But with the target lying down the COIL lines drop and touch the heat shield so to do this measurement Chad had to lift the lines, which could cause them to touch something else. So not sure how reliable this measurement was. It jumped around a lot, saw 0L occasionally.

2. Measured both target legs and tantalum gas line to HS, got about 5kOhms repeatedly using the ohmmeter.

3. Meggered across the gas line insulator to the gas line going into the target and got open circuit at 250V, so the gas line wasn't coated.

4. Target container looked vaguely red in the areas where the target material was, otherwise still no deposits on the inside. The container was not overly crystalized as seen on the legs and end caps.

5. Some sparking marks on the EE and some slightly asymmetric deposits

Continuing Aug. 22 2023:

6. Found what looks like a hole in the insulation on the COIL, maybe the cause of our short? Found a corresponding line mark on the copper plates that hold the coil down but not sure if it is related. Pics on docushare.

7. Grid looks perfectly new. Where was that current going?

8. Copper plates that hold coil were loose and bolts that hold coil in just fell out as well.

9. What can be seen of the anode wire looks good.

  2477   Tuesday, August 15, 2023, 13:58 Frank SongITWStandard OperationTM2Nb#10Module Connection

 TM2 with new target Nb#10 was moved to ITW from TCS and re-connected in pit. TPs are running at their full speed. 

Attachment 1: TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
  2479   Friday, August 25, 2023, 07:22 Frank SongITWRepairTM2Nb#10module disconnection

 TM2 with target Nb#10 was disconnected in ITW yesterday for beam production issue investigation.

Attachment 1: TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
  2480   Monday, August 28, 2023, 12:16 Frank SongNorth Hot-CellRepairTM2Nb#11electric/leak check

 TM2 with new target Nb#11 has been E/L checked sitting on NHC.

Attachment 1: TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
  2481   Tuesday, August 29, 2023, 09:07 Frank SongITWRepairTM2Nb#11electrical check

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
  2482   Tuesday, August 29, 2023, 09:28 Frank SongITWRepairTM2Nb#11Module Connection

 Module was connected yesterday and all turbo pumps are running at their top speed. 

Attachment 1: TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check

 An electric checked right after TM2 was moved from ITW. 

Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection

 TM2 with new target Ta#66 was connected in ITW. 

Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.

TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.

Attachment 1: TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.

ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other water lines are below 3.0XE-9atm.cc/sec.

Attachment 1: ITW_2024_shut_down_leak_check.pdf
ITW_2024_shut_down_leak_check.pdf
  2516   Monday, January 08, 2024, 14:47 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - ITW to SHC

TM2 was moved from ITW to the South Hot Cell with Ta#66 target.

  2517   Tuesday, January 09, 2024, 16:10 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - SHC to Silo

TM2 was moved with no target attached from the South Hot Cell to a silo.

  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHC

Ta#66 post operation electrical check was done at SHC this Monday. See attachment.

Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
TM2_Ta66_post__oeration_electrical_check.pdf
  2583   Tuesday, May 07, 2024, 09:47 David WangITE/ITWMaintenanceTM2 Broken TM2:TP2 has been replaced.

Broken TM2:TP2 has been replaced otday by a new TV-1001 nav pump supplied by vacuum group. replaced pump seris number:201281. new pump series number:IT23431008. TPs replacement history sheet will be updated by Frank. I will put comment on this e fault and let operator to close it.

  2603   Thursday, May 30, 2024, 11:08 David WangConditioning StationStandard OperationTM2 TM2 was moved from silo to TCS yesterday morning.

TM2 was moved from silo to TCS yesterday morning. The move is smooth.    TCS vacuum system was started after. TCS and TM2 pumping down is ok so far.

  2608   Wednesday, June 12, 2024, 10:18 David WangConditioning StationStandard OperationTM2 TM2 is moved from TCS to silo this morning

TM2 is moved from TCS to silo this morning. The move is smooth.

  2609   Thursday, June 13, 2024, 11:44 David WangConditioning StationRepairTM2 Replaced several o ring seals on TM2 service cap.

  couple of E-8 to low E-7 atm.cc/sec leak were found on TM2 service cap top air to vacuum  o rings.  Replaced these leak o ring seals including o ring on IG1 and steerer service panel,o rings on MSP, EE, D blue nylon and copper feed through, and o ring on a round blank off beside MSP terminal on second row. 

2024-july-03 update: TM2 was leak checked again at TCS. no air to vacuum leak on module top. i helium pressure tested(60psi) all water cooling lines (except HS) . They are leak free.